PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 MAY 2018
Service Vehicles
11. Service vehicle parking, manoeuvring and standing spaces must be provided on the
site.
Stormwater Drainage
12. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property.
Damage to Services and Assets
13. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
Bushfire Management
14. The site must be provided with a water storage reservoir having a minimum 5000
litres of water for emergency firefighting purposes. Such storage must be provided in
addition to the water supply capacity required for the use and must be provided in the
form of either an accessible dam, swimming pool, or rainwater tank. If by rainwater
tank, water storage for firefighting purposes must be provided either in a separate
rainwater tank or a reserve section in the main water supply tank on which:
a. the domestic take off from the tank is at or above the 5,000 litre point; and
b. standard rural fire brigade fittings are fitted to the tank outlet for access by four
wheel drive rural services vehicles
15. The site must be provided with an auxiliary power supply such as a petrol driven fire
fighter pump (or generator), together with a hose of sufficient length to easily reach
around to all sides of the building.
16. A 20 metre wide asset protection zone from/around the building/s to the northern
bushland must be maintained on the site which is kept free of:
a. grass higher than 300mm
b. large trees that have continuous or overlapping canopies with other large trees
c. trees that overhang dwellings or structures
d. dead branches and loose bark; and
e. woodpiles, combustible material storage areas, large quantities of garden
mulch or any other form of stacked flammable materials.
17. A legible Bushfire Evacuation Plan must be clearly visible to staff and visitors at all
times.
Acoustic
18. The open southern end of the building must be enclosed with a permanent wall to the
existing shed within 2 months of the date of approval.
Page 43 of 125
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.