Original source · versioned page text
2018-05-08 Planning & Environment Committee Agenda
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 MAY 2018
C. Include the following additional conditions:
Car Wash Facility
238 Waste water and stormwater management shall be in accordance with the Hydraulic
Services Plan and Stormwater Management Plans dated 27 February 2018
239 Contaminants or contaminated water must not be directly or indirectly released from
the premises or to the ground or groundwater at the premises except for:
i Uncontaminated Overland Stormwater flow;
ii Uncontaminated Stormwater to the stormwater system;
iii contaminants released to sewer under and in accordance with a trade waste
permit
240 Releases to water must not cause any visible oil slick or other visible evidence of oil
or grease, nor contain visible, grease, scum, litter or floating oil.
241 The Holder must ensure that:
i maintenance and cleaning of equipment (including vehicles and plant) is carried
out in an area where contaminants cannot be released into stormwater
drainage, a roadside gutter, a water or onto unsealed ground;
ii any spillage of contaminants is cleaned up immediately by a method other than
hosing, sweeping or otherwise releasing the contaminants into stormwater
drainage, a roadside gutter or a water.
iii incident rainfall and overland flow of stormwater does not contact contaminants
242 Any proposed signs, fences, landscaping and barriers (permanent or temporary),
particularly along the northern end of the car wash facility and excluding the approved
structures, must not obstruct sight distances or compromise the widths of existing
traffic lanes and parking aisles.
243 Appropriate line marking must be provided in accordance with the consulting
engineer’s recommendations to demarcate the proposed car wash area/s and the
allocated reserved parking spaces.
244 The works must be constructed in accordance with a Construction Management Plan
prepared by a suitably qualified person and must specifically address the following:
a. Traffic Management during all aspects of the construct phase including:
i. A Traffic Management Control Plan in accordance with Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and
traffic control measures prior to construction.
ii. Maintenance of safe and unobstructed traffic environment near the
construction site.
iii. Maintenance of safe pedestrian access across the frontage of the
construction site both during daily construction and after daily
construction has ceased.
iv. Proposed fencing to the site during the construction phase of the
development.
v. Adequate parking arrangements for construction workers to minimise
impact on the customers and users of the parking areas.
vi. Maintenance and protection of water quality and existing drainage lines
through the construction site through the implementation of appropriate
erosion and sediment control measures.
Page 57 of 125
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.