Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2018-05-08 Planning & Environment Committee Agenda

of 125

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     8 MAY 2018


C.   Include the following additional conditions:
           Car Wash Facility
     238 Waste water and stormwater management shall be in accordance with the Hydraulic
         Services Plan and Stormwater Management Plans dated 27 February 2018
     239 Contaminants or contaminated water must not be directly or indirectly released from
         the premises or to the ground or groundwater at the premises except for:
           i     Uncontaminated Overland Stormwater flow;
           ii    Uncontaminated Stormwater to the stormwater system;
           iii   contaminants released to sewer under and in accordance with a trade waste
                 permit
     240 Releases to water must not cause any visible oil slick or other visible evidence of oil
         or grease, nor contain visible, grease, scum, litter or floating oil.
     241 The Holder must ensure that:
           i     maintenance and cleaning of equipment (including vehicles and plant) is carried
                 out in an area where contaminants cannot be released into stormwater
                 drainage, a roadside gutter, a water or onto unsealed ground;
           ii    any spillage of contaminants is cleaned up immediately by a method other than
                 hosing, sweeping or otherwise releasing the contaminants into stormwater
                 drainage, a roadside gutter or a water.
           iii   incident rainfall and overland flow of stormwater does not contact contaminants
     242 Any proposed signs, fences, landscaping and barriers (permanent or temporary),
         particularly along the northern end of the car wash facility and excluding the approved
         structures, must not obstruct sight distances or compromise the widths of existing
         traffic lanes and parking aisles.
     243 Appropriate line marking must be provided in accordance with the consulting
         engineer’s recommendations to demarcate the proposed car wash area/s and the
         allocated reserved parking spaces.
     244 The works must be constructed in accordance with a Construction Management Plan
         prepared by a suitably qualified person and must specifically address the following:
           a.    Traffic Management during all aspects of the construct phase including:
                 i.     A Traffic Management Control Plan in accordance with Manual of Uniform
                        Traffic Control Devices (MUTCD) detailing all temporary signage and
                        traffic control measures prior to construction.
                 ii.    Maintenance of safe and unobstructed traffic environment near the
                        construction site.
                 iii.   Maintenance of safe pedestrian access across the frontage of the
                        construction site both during daily construction and after daily
                        construction has ceased.
                 iv.    Proposed fencing to the site during the construction phase of the
                        development.
                 v.     Adequate parking arrangements for construction workers to minimise
                        impact on the customers and users of the parking areas.
                 vi.    Maintenance and protection of water quality and existing drainage lines
                        through the construction site through the implementation of appropriate
                        erosion and sediment control measures.


                                                                                 Page 57 of 125
Log in to download the original file

2018-05-08 Planning & Environment Committee Agenda(PDF, 14MB).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.