Original source · versioned page text
2018-05-08 Planning & Environment Committee Agenda
The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 8 MAY 2018
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
Stormwater Harvesting
21. Operating stormwater harvesting tanks must be provided for the development. The
tanks must be provided in accordance with a Building Works for above ground tanks,
or Operational Works Approval for below ground tanks and must include the re-use of
harvested rainwater for internal non-potable uses and outdoor uses.
Acid Sulfate Soils
22. An acid sulfate soils investigation (with recommendations) for the management of the
proposed development must be undertaken by a qualified person* in accordance with
the Queensland Acid Sulfate Soil Technical Manual Soil Management Guideline v4.0
(2014), or a more current version and submitted with the application for Operational
Works.
23. All works must be carried out in accordance with the Acid Sulfate Soil and
Groundwater Management Plan for the development prepared by a qualified person*
and referenced in a Development Permit for Operational Works. *(Refer to Advisory
Note)
24. All waters, including stormwater runoff, groundwater seepage and leachate from acid
sulfate soils must achieve the following quality prior to release from the site:
a. a pH range of 6.5-8.5 pH units
b. 50mg/L maximum total suspended solids concentration
c. 0.3mg/L maximum total iron concentration
d. 0.2mg/L maximum total aluminium concentration
e. no visible plume at either the point of release from the site or within a waterway.
Retention of Existing Trees
25. All works must be carried out in accordance with section 4 of the Tree Safe Pty Ltd
report listed within this Decision Notice.
26. The Poinciana tree located within the road reserve must be retained.
Landscaping Works
27. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and the Noosa Plan for that specific
area and must include in particular:
a. works shown on the approved Concept Landscape Plan, including the provision
of a minimum of 3 x 100 litre trees between the building and Eumundi Noosa
Road.
b. 1.50-metre-wide landscaping strip on the Eumundi Noosa road reserve frontage
adjacent to the landscaping within the site, exclusive of the access driveway,
generally uncompromised by infrastructure items, except for the eastern side of
the entry crossover.
c. provision of 1 street tree within the road reserve west of the exit crossover, the
tree must be a local native species.
Page 7 of 125
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.