Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2018-05-08 Planning & Environment Committee Agenda

of 125

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                     8 MAY 2018


    28.   All landscape works must be established and maintained in accordance with the
          approved design for the life of the development, and in a manner that ensures
          healthy, sustained and vigorous plant growth. All plant material must be allowed to
          grow to full form and be refurbished when its life expectancy is reached.
    29.   All landscape works must be maintained generally in accordance with the approved
          design for the life of the development.
    ENVIRONMENTAL HEALTH
    Underground tanks
    30.   Prior to the commencement of the use underground tanks shall be constructed and
          installed in accordance with the following:
          a.   Tanks are to be made of fibre-reinforced thermosetting resin (fibreglass) that is
               compatible with the product or tanks are to be made of a steel inner wall and a
               fibre-reinforced thermosetting resin composite (fibreglass) outer wall.
          b.   Tanks are to be double-walled with an interstitial space.
          c.   Tanks are to meet the requirements of UL 1316 Glass fibre reinforced
               underground storage tanks for petroleum products, alcohols and alcohol
               gasoline mixtures, or the equivalent or tanks are to meet the requirements of
               AS1692-2006 Steel tanks for flammable and combustible liquids, or the
               equivalent.
          d.   Tanks are to have an overfill protection valve installed in the drop tube of the
               tank. The overfill prevention valve shall be calibrated to prevent the tank from
               being filled in excess of 90% of its capacity.
    Submit certification
    31.   Prior to the commencement of the use certification by a suitably qualified person that
          the underground tanks have been constructed and installed in accordance with the
          above requirements must be submitted to Council.
    Pipework
    32.   Prior to the commencement of the use pipework shall be constructed and installed in
          compliance/accordance with the following:
          a.   Pipework is to be made of non-corrodible materials as defined by cl 1.4.37 AS
               4897. The design, installation and operation of underground petroleum storage
               systems.
          b.   Product piping is to be double-walled with an interstitial space.
          c.   Each tank fill point is to be clearly labelled and identified in accordance with AS
               4977 Petroleum products - Pipeline, road tanker compartment and underground
               tank identification.
          d.   Each tank fill point is to be fitted with a camlock type or other liquid-tight
               connection.
          e.   Each tank fill point is to be provided with spill containment of at least 15 litre
               capacity per spill point.
          f.   All fill and vapour recovery points are to be earthed in accordance with AS
               1020.0 The control of undesirable static electricity and AS 3000 Electrical
               installations.




                                                                                   Page 8 of 125
Log in to download the original file

2018-05-08 Planning & Environment Committee Agenda(PDF, 14MB).pdf · 14.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.