Skip to the record
For the highest quality transcripts.

Original source · versioned page text

DA Approval

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Noosa Council documents




                          Print Date: 31 March 2022, 11:02 AM


[OCR of page images]
Noosa Council documents

Town Planning Consent Permit - TPC 2830 Page 3

10.

11.

8.2 Payment may be deferred to a date:-

8.1.1 prior to Council sealing plans of the development for titling
purposes;
8.1.2 prior to the issue of a Certificate of Classification for any

building approved under this application; or

8.1.3 prior to commencement of the approved use at the relevant
premises;

whichever is the sooner. Payment of deferred headworks contributions
shall also be subject to the following requirements:-

8.1.4 Submission of a trading bank guarantee to the value of
headworks assessed at the time prescribed by the Local
Government (Planning and Environment) Act 1990, plus 20%,
prior to Building Approval;

8.1.5 Headworks shall be calculated as the value of headworks
assessed at the time prescribed by the Local Government
(Planning and Environment) Act 1990, plus interest charged at
the rate set by the Queensland Treasury Corporation for Local
Government borrowings as they apply to Noosa Shire. The
interest rate used shall be the rate current at the "time
prescribed" above;

8.1.6 Should the contributions not be paid at the due time, Council
shall call upon the security lodged; and

8.1.7 in the case of a building permit, if a permit expires the
securities held will be returned.

The developer shall bear the cost of alteration of any public utility or other
facilities necessitated by the development of the land or associated construction
works external to the site.

Connection to Council's existing water supply and sewerage reticulation
systems at the developer's expense to the standards and requirements of
Council's Shire Engineer.

The developer shall provide metered water connections from the water supply

system to the proposed development, in accordance with Council's standards
and to the satisfaction of the Shire Engineer.

Print Date: 31 March 2022, 11:02 AM
Log in to download the original file

DA Approval.pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.