Town Planning Consent Permit - TPC 2830 Page 4
12, Roof and surface water is to be collected on site and is to be discharged through
a single underground drain line into existing drainage in Advance Place to the
satisfaction of the Shire Engineer. A Building Approval shall not be granted
until the Shire Engineer has approved of the drainage scheme.
13, Provision of approved refuse containers in accordance with the requirements of
the Refuse Management Regulations of 1983 for the storage and collection of
refuse to the satisfaction of Council's Health Surveyor.
14. Provision of an imperviously paved and drained area to be drained to Council’s
to sewer to accommodate all refuse containers to the reasonable satisfaction of
Council's Health Surveyor. This area is to be aesthetically screened from any
road frontage or adjoining property boundary and is to be setback a distance of
two (2) metres from any road frontage. A suitable hosecock and hoses are to be
located in the vicinity of the refuse container area.
15. Any flat or unit intended to be let out for fee or reward is to be licensed
annually with Council's Health Department in accordance with the provisions of
Chapter 43 of Council's By-Laws prior to such letting.
16. Submission of a cash bond or trading bank guarantee to the sum of $6000.00 to
secure performance of conditions, prior to the issue of Building Approval. The
cash bond or trading bank guarantee will be returned upon performance of the
conditions of approval.
17. The Town Planning Consent Permit may be revoked pursuant to Section 4.14 of
the Local Government (Planning and Environment) Act if commencement of
erection or works have not been made in accordance with that Permit or the
rights conferred by that Permit are not exercised within two (2) years of the
date of issue of the Permit.
18. The Town Planning Consent Permit lapses where:-
18.1 the use or erection of a building or other structure associated with the use,
has not been commenced within four (4) years of the date of issue of the
Town Planning Consent Permit, unless application is made and approved
by Council for an extension; or
18.2 the use of any premises pursuant to the Town Planning Consent Permit
ceases for a period of twelve (12) months.
Print Date: 31 March 2022, 11:02 AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.