                      b.      suitable safety measures, including warning signage, to improve driver awareness of
                              pedestrians and enhance pedestrian safety. Warning signage must be provided near
                              the exit ramp from the underground parking area to warn motorists of pedestrian
                              movement along the frontage street.
               Car Parking
               41.    Car parking must be provided in accordance with the approved plans and as amended by
                      the conditions of this approval. The works must be undertaken in accordance with an
                      Operational Works approval.
               42.    The parking layout is to be in accordance with the requirements of AS/NZS 2890.1- 2004
               43.    Provision of vandal resistant public lighting with intensities to satisfy the requirements of
                      Australian Standard AS1158: Public Lighting Code.
               44.    All car parking areas and access driveways must be maintained exclusively for vehicle
                      parking and manoeuvring and kept in a tidy and safe condition at all times.
               45.    Directional signage must be provided to direct visitors and customers to the car parking
                      spaces provided on site.
               Security Access to Carpark
               46.    Where access to the carpark is proposed to be restricted by a security gate, provision must
                      be made for queuing of vehicles clear of the roadway while waiting for the security gate to
                      open.




                                                                                        4
               47.    Where a secure carpark services a commercial use on the site, the security gate must remain
                      open at all times while commercial uses on the site are open for business. The requirements




                                                                                 T
                      of this condition must be included in the Community Management Statement for anybody
                      corporate for the subject site.
                                                                       EN
               Service Vehicles
               48.    Service vehicle parking, manoeuvring and standing spaces must be provided on the site.
                      The works must be undertaken in accordance with an Operational Works approval.
                                                            M

               Pedestrian and Bicycle Facilities
                                                           H


               49.    Pedestrian and bicycle facilities must be provided for the development. The works must
                      include in particular:
                                                     C



                      a.      signage and lighting at strategic locations to direct people to building entries and public
                                           TA




                              toilet facilities;
                      b.      a total of 53 bicycle parking spaces; and
                      c.      end of trip facilities involving 27 lockers, 6 showers and change rooms within the
                                   AT




                              development.
               Water quality and quantity
               50.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works approval
                      and the Queensland Urban Drainage Manual.
               51.    A stormwater quality treatment system must be provided for the development. The works
                      must be undertaken in accordance with an Operational Works approval and the Bioretention
                      Technical Design Guidelines (Water by Design, 2012), and must include in particular:
                      a.      stormwater quality treatment devices of a size and location generally in accordance
                              with those shown in Drawing No. C6070/20/P07 prepared by Walsh Consulting
                              Engineers dated 26/10/2021, with the exception of the following:
                              i.       Bioretention filter area is to be increased in size to the area stated for bioretention
                                       surface area on the above referenced plan
                      b.      bioretention devices which:
                              i.       are designed generally in accordance with IPWEQA Standard Drawing No.s DS-
                                       073, DS-075 and DS-076

                                                                                                               Page 5 of 10

Document Set ID: 22632986
Version: 7, Version Date: 07/11/2023

Log in to download the original (Further Council Report MCU21-0110.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.