Original source · versioned page text
Further Council Report MCU21-0110.pdf
b. suitable safety measures, including warning signage, to improve driver awareness of
pedestrians and enhance pedestrian safety. Warning signage must be provided near
the exit ramp from the underground parking area to warn motorists of pedestrian
movement along the frontage street.
Car Parking
41. Car parking must be provided in accordance with the approved plans and as amended by
the conditions of this approval. The works must be undertaken in accordance with an
Operational Works approval.
42. The parking layout is to be in accordance with the requirements of AS/NZS 2890.1- 2004
43. Provision of vandal resistant public lighting with intensities to satisfy the requirements of
Australian Standard AS1158: Public Lighting Code.
44. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
45. Directional signage must be provided to direct visitors and customers to the car parking
spaces provided on site.
Security Access to Carpark
46. Where access to the carpark is proposed to be restricted by a security gate, provision must
be made for queuing of vehicles clear of the roadway while waiting for the security gate to
open.
4
47. Where a secure carpark services a commercial use on the site, the security gate must remain
open at all times while commercial uses on the site are open for business. The requirements
T
of this condition must be included in the Community Management Statement for anybody
corporate for the subject site.
EN
Service Vehicles
48. Service vehicle parking, manoeuvring and standing spaces must be provided on the site.
The works must be undertaken in accordance with an Operational Works approval.
M
Pedestrian and Bicycle Facilities
H
49. Pedestrian and bicycle facilities must be provided for the development. The works must
include in particular:
C
a. signage and lighting at strategic locations to direct people to building entries and public
TA
toilet facilities;
b. a total of 53 bicycle parking spaces; and
c. end of trip facilities involving 27 lockers, 6 showers and change rooms within the
AT
development.
Water quality and quantity
50. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works approval
and the Queensland Urban Drainage Manual.
51. A stormwater quality treatment system must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and the Bioretention
Technical Design Guidelines (Water by Design, 2012), and must include in particular:
a. stormwater quality treatment devices of a size and location generally in accordance
with those shown in Drawing No. C6070/20/P07 prepared by Walsh Consulting
Engineers dated 26/10/2021, with the exception of the following:
i. Bioretention filter area is to be increased in size to the area stated for bioretention
surface area on the above referenced plan
b. bioretention devices which:
i. are designed generally in accordance with IPWEQA Standard Drawing No.s DS-
073, DS-075 and DS-076
Page 5 of 10
Document Set ID: 22632986
Version: 7, Version Date: 07/11/2023
Preview the original
The page text is free to read. Previews and downloads of original files need an account.