Further Council Report MCU21-0110.pdf

of 209

Page text read automatically using OCR, there may be inaccuracies

                              ii.      are provided with a free-draining outlet from the sub-soil drainage system
               52.    Permanent educational signage* must be erected to educate the residents of / customers to
                      the development about the function of the bioretention device(s). The dimensions, standard,
                      presentation and location of the educational signage must be in accordance with an
                      Operational Works approval.
               53.    All stormwater quality treatment devices must be maintained in accordance with the Water
                      by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The approved
                      Operational Works drawings for the stormwater quality treatment system and detailed life
                      cycle costing of the system must be attached as an addendum to this document. Records of
                      all maintenance activities undertaken must be kept and made available to Council upon
                      request.
               54.    Operating roof water harvesting tanks must be provided for the development. The tanks must
                      be provided in accordance with an Operational Works approval and must include in
                      particular:
                      a.      a total tank capacity of 135,000 litres
                      b.      a catchment of not less than 2,800m2 of the building roof area
                      c.      re-use of harvested stormwater for non-potable outdoor uses including irrigation of
                              landscaped areas and swimming pool top-up.
               55.    Certification must be submitted to Council from a qualified person which certifies that the
                      stormwater harvesting tanks and associated reticulation has been installed in accordance




                                                                                    4
                      with the requirements of this Decision Notice.
               Acid Sulfate Soils



                                                                              T
               56.    An Acid Sulfate Soil Management Plan must be prepared and submitted with the Operational
                                                                    EN
                      Works application for the site. The acid sulfate management plan must include testing,
                      monitoring and treatment requirements for the works.
               Services
                                                          M

               57.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                                                         H


                      the future connection of optic fibre technology telecommunications.
                                                    C



               58.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater which certifies that the development has met the requirements of this
                                           TA




                      Decision Notice and all applicable legislation at the time of construction.
               Easements
               59.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                                AT




                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               60.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               61.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
               Earthworks and Retaining Walls
               62.    All excavation, fill, soil retaining structures and associated batters must be undertaken in
                      accordance with an Operational Works approval and contained entirely within the subject
                      site unless written permission from the respective landowner(s) is provided to Council.
               63.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.


                                                                                                          Page 6 of 10

Document Set ID: 22632986
Version: 7, Version Date: 07/11/2023

Log in to download the original (Further Council Report MCU21-0110.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.