MCU14/0073 - Decision Notice - 1036841
SDA-0914-014464
b. 20 visitor/customer parking spaces within the total, which are clearly marked
for that purpose and accessible at all times for visitor/customer use
c. 2 disabled parking space/s within the total
d. a sealed surface with crossfalls and gradients in accordance with Australian
Standard AS2890: Parking Facilities
13. Directional signage must be provided to direct visitors and customers to the car
parking spaces provided on site.
Bicycle Parking & End of Trip Facilities
14. Bicycle facilities in accordance with AS2890.3 Bicycle Parking Facilities must be
provided for the development. The facilities must be indicated on the plans and
submitted in accordance with an Operational Works approval and must include in
particular:
a. a total of 10 bicycle parking spaces
b. end of trip facilities involving a minimum of 5 lockers and 1 shower cubicle
with an ancillary change room.
Damage to Services and Assets
15. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
c. Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority for
approval.
Stormwater Drainage
16. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval, the Queensland Urban Drainage Manual and
Engineering report dated 3 September 2013 by Barlow Shelly Consulting
Engineers (with the works expanded to reflect the extended development area).
Stormwater Quality Management
17. A stormwater quality treatment system must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval and
must include in particular:
a. stormwater quality treatment devices of a size and location generally in
accordance with those shown in section 5.0 and 6.0 of the of the Engineering
report dated 3 September 2013 by Barlow Shelly Consulting Engineers (with
the works expanded to reflect the extended development area)
b. swales which are designed in accordance with the Water Sensitive Urban
Design Technical Design Guidelines for South East Queensland
c. The works must be undertaken in accordance with the Bioretention Technical
Design Guidelines (Water by Design, 2012)
Department of State Development, Infrastructure and Planning Page 4
Document Set ID: 19845988
Version: 1, Version Date: 22/12/2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0073 - Decision Notice - 1036841Related documentApplication case desk ↗
About this file
- File size
- 297 KB (small file)
- File type
No other editions are linked here.