Council archive · source document
MCU14/0073 - Decision Notice - 1036841
SDA-0914-014464
18. All stormwater quality treatment devices must be maintained in accordance with
the Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1).
The approved Operational Works drawings for the stormwater quality treatment
system and detailed life cycle costing of the system must be attached as an
addendum to this document. Records of all maintenance activities undertaken
must be kept and made available to Council upon request.
Stormwater Harvesting
19. Operating stormwater harvesting tanks must be provided for the development.
The tanks must be provided in accordance with an Operational Works approval
and must include in particular:
a. the details identified in section 5.0 and 6.0 of the of the Engineering report
dated 3 September 2013 by Barlow Shelly Consulting Engineers (with the
works expanded to reflect the extended development area).
LANDSCAPE & ECOLOGY
Landscaping Works
20. The development must be landscaped, in accordance an approval for Operational
Works. The particular works must generally accord with the planning scheme
Landscape Code and Planning Scheme Policy 3 Landscaping Plants and
Guidelines and include:
a. Landscaping to car park areas, including shade trees
b. Vegetated buffer to the Lake Macdonald Drive
c. Vegetated screening of any electrical transformers, bin storage areas and
the like from the road frontage
d. Details of any proposed clearing of vegetation and details of retention of any
existing trees on the site and road verge to accommodate the approved
development footprint. An Arborist Report is required to validate any
proposed clearing.
e. Removal of all weeds species listed in the following standards and
legislation:
i. Declared plants under the Land Protection (Pest and Stock Route
Management) Act 2002 and sub-ordinate Regulation 2003
ii. undesirable species, as defined within Planning Scheme Policy 3
Landscaping Plants and Guidelines of the Noosa Plan.
21. All landscape works must be established and maintained in accordance with
horticultural best practice with construction techniques and irrigation that allow for
healthy, sustained and vigorous plant growth. All plant material must be allowed to
grow to full form and be refurbished when its life expectancy is reached.
Rehabilitation
22. The land area defined by the vegetated portion contained within the Riparian
Buffer Area of the Biodiversity Overlay of the Noosa Plan on the subject must be
rehabilitated in accordance with a rehabilitation plan prepared by a suitably
qualified person and an approval for Operational Works. Rehabilitation works
must:
Department of State Development, Infrastructure and Planning Page 5
Document Set ID: 19845988
Version: 1, Version Date: 22/12/2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0073 - Decision Notice - 1036841Related documentApplication case desk ↗
About this file
- File size
- 297 KB (small file)
- File type
No other editions are linked here.