Council archive · source document
MCU14/0073 - Decision Notice - 1036841
SDA-0914-014464
a. restore the habitat value of the land to meet the characteristics of the
appropriate regional ecosystem
b. return the land to its natural undisturbed state, where practicable. Where
impracticable, provide justification.
c. The treatment of undesirable species, as defined within Planning Scheme
Policy 3 Landscaping Plants and Guidelines of the Noosa Plan.
ENVIRONMENTAL HEALTH
Refuse Management
23. The developer must provide waste storage and disposal facilities in accordance
with Planning Scheme Policy No. 9 “Waste Management Multi-Dwellings and
Commercial and Industrial Premises”, including an external imperviously paved
area correctly sized for all refuse and recycling containers and suitably screened
from public places and neighbouring properties. A bin wash area is required with a
cold-water tap, hose and drain outlet connected to the effluent disposal system, via
a bucket trap. The drain outlet is to be designed to prevent storm water entry to the
effluent system and this can be achieved with a nib wall 50mm high and up to
700mm x 700mm wide (max 0.5m²), or alternatively the waste area can be roofed,
or any other design approved by Council’s delegate.
24. The development must allow refuse-loading areas to be located off street. All
vehicles associated with the collection of waste/recyclables, shall enter and leave
the site in a forward direction.
25. A Waste Management Plan (Operational) in accordance with Planning Scheme
Policy No. 9 “Waste Management Multi-Dwellings and Commercial and Industrial
Premises”, shall be developed and implemented on site. The Waste Management
Plan must include the following as a minimum: -
The types and estimated volumes of waste that will be generated from the
activities approved within the development.
Methods to be used for dealing with garden waste.
Initiatives to minimise waste either by waste prevention, reduction, re-use or
recycling.
Description of procedures and clearly identified site responsibilities for all site
occupants for getting all waste to the bins; the storage of bins and the
collection of bins by the contractor.
A description of the design details of waste storage and recycling areas
including size, location, elevation and floor plan, methods of bin washing and
system to prevent storm water getting into the effluent system via the bin
wash.
A description of types and volume of waste storage containers to be used,
and the collection frequency of containers,
The waste and recycling storage area shall include the provision of
containers for all waste and recycling materials including putrescible matter,
non-recycling waste, paper/ cardboard, glass, aluminum/steel cans, waste
oil, Styrofoam boxes, etc.
Department of State Development, Infrastructure and Planning Page 6
Document Set ID: 19845988
Version: 1, Version Date: 22/12/2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU14/0073 - Decision Notice - 1036841Related documentApplication case desk ↗
About this file
- File size
- 297 KB (small file)
- File type
No other editions are linked here.