Council archive · source document
00157ADA.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 11
37. For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the development shall be
served by:
37.1. A single Body Corporate water meter to measure the total water consumption (including fire hose
reels, but excluding fire hydrants and fire sprinkler systems), and
37.2. Individual water meters to each tenement capable of being separately rated, and
37.3. A fire service (fully testable single detector check with metered bypass), where applicable, for flows
to fire hydrants and fire sprinkler systems (excluding fire hose reels).
Earthworks
38. Earthworks works required on site shall be carried out in accordance with Section 3.8 of Council’s
Engineering Design Standards Manual and so as not to cause the additional ponding of water on any
adjoining lands or the blockage of, or interference with, any natural watercourses.
39. Earthworks carried out on site shall not affect the structural integrity of any of the existing fences or
structures that border the development site. Fences that are affected shall be replaced prior to the
Building Certifier issuing the Certificate of Classification. In this regard any fences to be replaced shall be
clearly shown on the plans submitted for Operational Works approval.
Erosion and Sediment Control
40. Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
control measures such as silt fencing, controlled gravel access to the site and controlled disposal of
waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
to the Council for approval prior to obtaining a Development Permit for Operational Works.
Contributions Towards Council Infrastructure
41. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or upgrading
various infrastructure at the rates applicable at the time of payment. An estimate only of the contribution
amounts under the current Council policies and requirements is outlined in the table below:
Contribution Required For: Amount:
PSP12 – Public Open Space Contributions (Park) $2,667
PSP16 – Sewerage Headworks Contributions $2,434
PSP17 – Water Supply Headworks Contributions $3,617
PSP20 – Pathway Trunk Network Contributions $1,918
TOTAL Contribution Amount = $ 10,636
Please note, that these amounts are all subject to variations in the Consumer Price Index, All Groups Brisbane
from March 2007 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the contributions
not be paid at the due time, Council shall call upon the trading bank guarantee in full.
Processing of bonds for security where specific Council approval has been given for the bonding of
contributions will incur an administration fee in accordance with Council’s Land Development Commercial
& Regulatory Fees at the time of lodgement.
In the event that the Development Permit for Material Change of Use of Premises lapses or is cancelled,
the trading bank guarantee will be returned.
General
42. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works which shall be submitted in conjunction with an application for a
Development Permit for Operational Works.
43. Digital detailed designs including drawings, calculations, etc, shall be submitted with any application for a
Development Permit for Operational Works in respect of roadworks and stormwater drainage works. The
design shall be in accordance with Council’s Planning Scheme Policy PSP05 – Engineering Design
Standards – Roads, Drainage and Earthworks. To avoid conflict with underground pipes or services, all
existing and proposed services required by the development shall be shown on the plans.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@a401d4bc\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00157ADA.001.pdfRelated documentPublic source context ↗
Decision Notice - 010.2007.00000643.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 54 KB (small file)
- File type
No other editions are linked here.