MCU16/0143
Bushfire Information Kit
29. A Bushfire Information Kit must be submitted for approval and endorsed through
an operational works approval. The kit must provide clear and practical instructions
regarding the bushfire management requirements of the covenant area. These
instructions are to be in plain English, logical format, provide concise direction for
the management of the covenant area in accordance with the approved Bushfire
Management Plan.
Frontage Works
30. Footpath improvements such as topsoiling, grassing, and tree planting are required
to the Serenity Close frontage of the site (if not already provided) in accordance
with Planning Scheme Policy PSP3 Landscaping Plants and Guidelines. Grass
shall be couch, free of weeds.
31. A new 1.5 metre wide concrete path shall be constructed along the Serenity Close
frontage of the site (if not already provided) in accordance with Council’s design
standards and to an alignment that protects any significant vegetation or any
underground services.
32. All paths shall be designed and constructed to ensure pedestrian safety using non-
slip materials and to produce an evenly graded surface finish.
Stormwater Drainage
33. All stormwater drainage shall be collected on site and discharged so there is no net
increase in stormwater runoff from the site.
34. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site or any adjoining property.
The works must be undertaken in accordance with an Operational Works approval
and must include in particular a drainage system generally in accordance with the
approved Environmental Management Plan for the Settlers Cove development.
35. On site swale drains will be required to capture and direct any overland stormwater
runoff to the Infiltration Pits proposed on site. These swales shall be sized to carry
a 3-month storm event and plans detailing their capacity, location, length, width
and grades shall be submitted to Council for approval.
36. All site stormwater drainage shall be by means of a gravity system.
37. Plans of the entire on-site drainage design must be prepared by a Registered
Professional Civil Engineer and submitted to Council prior to obtaining a
Development Permit for Operational Works.
Electricity and Telecommunication Services
38. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
39. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice
and all applicable legislation at the time of construction.
Page 6 of 13
Document Set ID: 20336947
Version: 6, Version Date: 16/06/2017 Print Date: 20 June 2017, 11:32 AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.