MCU 160143 Decision Notice
Attached to the e-mail Change to DA (Report, Decision Notice, PACT Form 5) MCU16/0143.01.
The original of this document is very large (31.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Noosa Council documents
MCU16/0143
Easements
40. Unless otherwise agreed in writing by the relevant service provider, any public or
third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
41. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
42. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
43. All earthworks and associated batters must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council.
44. Plans and details outlining the extent of earthworks required on site and any trees
to be retained shall be submitted to Council for approval prior to obtaining a
Development Permit for Operational Works.
45. All major excavations (including the basement and driveways) shall be shored to
prevent batters extending into areas and vegetation that are to be retained. All
trees to be retained should be adequately tagged to Council’s satisfaction and
enclosed with a barrier fence to the drip line to prevent damage.
46. A Geotechnical Engineer or similar qualified expert shall assess the soil condition
on site, determine the soil classification, establish whether any measures are
required to protect the stability of adjoining buildings and/or structures and/or land,
and make recommendations on the type of foundation system(s) best suited for the
proposed development. The recommendations of this report shall be incorporated
into the design and construction of the proposed development.
47. Earthworks shall not cause the ponding of water on any adjoining lands or the
blockage of, or interference with, any natural watercourses or overland flow path.
48. All retaining walls must be designed and constructed in accordance with the
planning scheme and must be certified by an RPEQ where exceeding 1.0m in
height. All retaining walls that are publicly accessible and exceed 1.0m in height
must be fitted with a commercial grade safety fence.
Erosion and Sediment Control
49. Any person acting on this permit shall prevent erosion and sediment export from
leaving the site. Site control measures such as silt fencing, controlled gravel
access to the site, controlled disposal of waste, catch drains, and temporary
infiltration or sump pump-outs will be necessary.
50. Plans detailing the methods of controlling erosion and sediment are required to be
submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works. The applicant is advised that a simple silt fence by itself is
unlikely to meet the objectives of best practice for Erosion & Sediment Control.
Page 7 of 13
Document Set ID: 20336947
Version: 6, Version Date: 16/06/2017 Print Date: 20 June 2017, 11:32 AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.