MCU 160143 Decision Notice

Attached to the e-mail Change to DA (Report, Decision Notice, PACT Form 5) MCU16/0143.01.

of 60

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (31.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Noosa Council documents




                                                                                                       MCU16/0143


                              Easements
                      40.     Unless otherwise agreed in writing by the relevant service provider, any public or
                              third party infrastructure located on the subject site must be placed within an
                              easement registered against the title of the property.
                      41.     All easements must be designed in accordance with the planning scheme and
                              granted at no cost to the Grantee. Where the Grantee is Council or a service
                              authority, the easement documentation must be in accordance with the Grantee’s
                              standard easement terms. Draft easement documentation must be submitted to
                              Council for endorsement.
                      42.     All works must be kept clear of any existing or proposed easements on the subject
                              land, unless agreed otherwise in writing by the Grantee.
                              Earthworks and Retaining Walls
                      43.     All earthworks and associated batters must be undertaken in accordance with an
                              Operational Works approval, and contained entirely within the subject site unless
                              written permission from the respective landowner(s) is provided to Council.
                      44.     Plans and details outlining the extent of earthworks required on site and any trees
                              to be retained shall be submitted to Council for approval prior to obtaining a
                              Development Permit for Operational Works.
                      45.     All major excavations (including the basement and driveways) shall be shored to
                              prevent batters extending into areas and vegetation that are to be retained. All
                              trees to be retained should be adequately tagged to Council’s satisfaction and
                              enclosed with a barrier fence to the drip line to prevent damage.
                      46.     A Geotechnical Engineer or similar qualified expert shall assess the soil condition
                              on site, determine the soil classification, establish whether any measures are
                              required to protect the stability of adjoining buildings and/or structures and/or land,
                              and make recommendations on the type of foundation system(s) best suited for the
                              proposed development. The recommendations of this report shall be incorporated
                              into the design and construction of the proposed development.
                      47.     Earthworks shall not cause the ponding of water on any adjoining lands or the
                              blockage of, or interference with, any natural watercourses or overland flow path.
                      48.     All retaining walls must be designed and constructed in accordance with the
                              planning scheme and must be certified by an RPEQ where exceeding 1.0m in
                              height. All retaining walls that are publicly accessible and exceed 1.0m in height
                              must be fitted with a commercial grade safety fence.
                              Erosion and Sediment Control
                      49.     Any person acting on this permit shall prevent erosion and sediment export from
                              leaving the site. Site control measures such as silt fencing, controlled gravel
                              access to the site, controlled disposal of waste, catch drains, and temporary
                              infiltration or sump pump-outs will be necessary.
                      50.     Plans detailing the methods of controlling erosion and sediment are required to be
                              submitted to the Council for approval prior to obtaining a Development Permit for
                              Operational Works. The applicant is advised that a simple silt fence by itself is
                              unlikely to meet the objectives of best practice for Erosion & Sediment Control.




                                                                                                            Page 7 of 13


Document Set ID: 20336947
Version: 6, Version Date: 16/06/2017                                                                  Print Date: 20 June 2017, 11:32 AM
Log in to download the original file

MCU 160143 Decision Notice.pdf · 31.4 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.