Skip to the record
Accept no imitations.

Original source · versioned page text

Planning Report

Attached to the e-mail MCU15/0068 Development Application for Material Change of Use.

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

EARTHWORKS CODE
A summary of the proposed development’s compliance with the purpose of the Eathworks Code is
included below.

The purpose of this code is to ensure:
   a) To ensure that earthworks do not unreasonably impact on the natural environment or other
       properties with regard to—
          i. land stability (including differential settlement or expansion in reactive soils);
         ii. contamination of land;
        iii. flooding and drainage;
        iv. groundwater, watercourses and wetlands;
         v. loss of native remnant or regrowth vegetation; and
   b) Earthworks are designed and constructed to be structurally sound.

Comment: The proposal will comply with all applicable Specific Outcomes of the Earthworks Code.
This code will be addressed in greater detail as a component of a subsequent operational works
application.



EROSION CONTROL CODE
A summary of the proposed development’s compliance with the purpose of the Erosion and Sediment
Control Code is included below.

The purpose of this code is to ensure:

    a) there is no significant environmental harm caused by the effects of erosion and sediment
       transport associated with development;
    b) disturbed areas are stabilised and restored promptly and effectively; and
    c) disturbance of land is minimised.

Comment: The proposal will comply with all applicable Specific Outcomes of the Erosion Control
Code. This code will be addressed in greater detail as a component of a subsequent operational works
application.



EXISTING SERVICES CODE
A summary of the proposed development’s compliance with the purpose of the Existing Services Code
is included below.

The purpose of this code is to ensure:
   a) Existing Council owned underground infrastructure is protected from potential or actual
       damage caused by development;
   b) Underground infrastructure is accessible for maintenance purposes; and
   c) Existing services are identified and methods of protection and access are implemented in the
       design of the development.

Comment: The proposal will comply with all applicable Specific Outcomes of the Existing Services
Code. This code will be addressed in greater detail as a component of a subsequent operational works
application.
Log in to download the original file

Planning Report.pdf · 1.2 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.