Skip to the record
Accept no substitutions.

Original source · versioned page text

Planning Report

Attached to the e-mail MCU15/0068 Development Application for Material Change of Use.

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

TRANSPORT, DRAINAGE AND WORKS CODE
A summary of the proposed development’s compliance with the purpose of the Transport Drainage
and Works Code is included below.

The purpose of this code is to ensure:

    a) Development is consistent with the intentions of the strategic transport network, which is to--
          i. improve the coordination between transport and land use, to avoid excessive motor
             vehicle travel;
         ii. minimise the environmental and social impacts of transport on the natural and urban
             environment;
        iii. increase the use of walking, cycling, bus, train and ferry modes and minimise the use of
             the private car;
        iv. vensure that vehicle access to the development does not compromise the capacity and
             safety of the road system;
         v. not increase the scale of the road network beyond that currently planned; and
        vi. ensure that development appropriately attenuates noise from adjoining roads.
    b) Development works are designed and constructed to a standard that meets community
       expectations, prevents unacceptable off-site impacts and optimizes whole of life cycle costs;
    c) Roads are designed and constructed to satisfy their specified functions and provide an
       appropriate level of flood immunity (including local flooding on roads, i.e. through sufficient
       kerb storage capacity);
    d) Development provides appropriate buffering between noise sensitive uses and the major road
       network and rail corridors;
    e) Roads are designed and constructed to be compatible with the existing road network and
       hierarchy and to provide a safe environment for vehicular traffic, pedestrians and cyclists;
    f) Intersections and access points are designed and constructed to retain the low key
       development style and slower pace enjoyed by residents and visitors;
    g) Road and drainage infrastructure is constructed to a standard that minimizes ongoing
       maintenance costs;
    h) Drainage systems are designed and constructed with capacity to effectively manage or convey
       the design flow;
    i) Road and drainage infrastructure is compatible with other infrastructure; and
    j) Road and drainage infrastructure does not create any adverse impacts upon environmental
       values associated with biodiversity, hydrological cycles, biophysical resources and air quality.

Comment: The proposal will comply with all applicable Specific Outcomes of the Transport Drainage
and Works Code. This code will be addressed in greater detail as a component of a subsequent
operational works application.




WASTE MANAGEMENT CODE
A summary of the proposed development’s compliance with the purpose of the Waste Management
Code is included below.

The purpose of this code is to ensure:

    a) The storage, disposal and management of solid and liquid waste are conducted in an safe and
       ecologically sustainable manner and without environmental nuisance;
Log in to download the original file

Planning Report.pdf · 1.2 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.