Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2018-04-16 General Committee Agenda

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 56 of 122

Noosa Shire Council                                                                         ATTACHMENT 2
      2017/18 Capital Budget Review 3
      For the period ending 30 June
      Program                                      Comment                               lente ta)      BR3     Revised
                                                                                          Budget                Budget
      Capital Works                                                                   $ 24,344,661 | $ 2,086,490 | $ 26,431,151
      a
                                                   2018/19 based on revised delivery schedule.
                                                   2018/19 based on revised delivery schedule.
      Oreala Cour Overpans, Suniee seach          [Saas [S80
                                                       eaten [TT
                                                   adjusted down to reflect cost incurred to date.
     BrdgesTotl s—<“—~*s*s~‘“s~‘“‘“‘—‘~*~‘“‘SSSS~<CS*é‘s;‘;*;*;*™”™C*~‘(;‘d‘S:«C« AG;          $280,850 | $    518,500,
     Coastal Canals andWaterways SS                                    —CSCSS              TC
      pogem
      Program
      Nealon __ LporaiiebaceaanrevseddeWvery schedule. |                                                            |
      Noosaville                                   2018/19 based on revised delivery schedule.
      [Noosa North Shore 3rd Cutting Beach Access |                            CSCSC*d SCHOO SC ~*~ «85D
     Coastal Canals andWaterways Total = |Sst~=“~*‘*‘s*~*‘*‘~*~*~*~*~*~*~*~S~S~*S~S~S:«C«O,BO-S © 22BID| $172,688
     CommercialLand&Propety ——CsCsSSSC
      Stage 1 Construction                         of sewer services and landscaping works.
     Peregian Beach, Rufous StCwilWoks           | SSSC™~—SsSCSCSCSCSCCSCCC~*«dCS SC HOLBOG |S           ~—«S «88ND |
     Commercial Land &Property Total                                                $8,119,628 | $113,983 | $3,233,611 |
     CommunityFaciliies                           SS             O—O—OOCCCCCCSCN“C (NSN                            Cd
     Noosa Heads The Jrenewal of AV system Year20f3 |            SSSCS™~—SCS~SS «WOODS                SC ~—~«SS~—~90-000 |
     Peregian Beach Public Amenities -Design Year|          SSSSSSCSC~SCSCS~SS           8H] SC —«LS~—95,000_
                                                   2018/19 based on revised delivery schedule.
     Cooroy Library, Repairs to Stiplightng  |                                   SC«d SOS CCS «880M |
     Respite Centre Carport and intemal Automatic Doors |      SSSCSC~SCS~S~S            «8D        —C-—~«S_—8,000 |
     Respite Centre Rehabilitation Works        | SSSSCSCS~™~SC~SCSCSCSCSC~S S10,                S ——C-—~*| S~_—120,000
     Tewantin SES Termite Damage ——=S=S*S*S~*S*«dE    gO WOKS TO repair termite damage. |$ - |$ 8,900|$          6,300
     see eves            Fens                    ewes                              |e         |S     eM |S       88
                                                   resolve WH&S issue.
pene                                                                                |S        LS         TE
                                                   pump.
      Ceo Senet een                               peaibutet               ee |S               |S      ONS        ON
                                                   pool blanket.
   See eee eee                                      et                          ees           |S      eels
                                                   panels.
     Community Facilities Total                                                     $1,892,174 $64,716 | $1,327,455 |
     CorporateBulldings   SS                  —sSC ‘OOO CSC‘                                                      CS
     Doonella House -Emergentworks—SSsTSSC™C~“—~sS*SSsSSSSSSTSTSTTTTC‘dCSNS = (SSC                       CdS
    fpacrmnt                     ee        PS
      replacement
                                                   2018/19 based on revised delivery schedule.
     Noosa Depot Workshop Electrical Replacement |                                «SOS                   CdS    «OO
     Noosaville Depot- Replacement of ducted airconsystem |         SSSCSC~S~S CASTS                     SAO
      oplcoren               ns vorees omen | Emergentweie to rep     iiesowmenes   [SS               ears       er
      Replacement
      Noosaville Depot OHS Roof Compliance Works | Emergent works identified for depotroof. _|$ - |$ 12,000|$  12,000
                                                   construction planning and tender for a
                                                   administration building roof replacement
                                                   construction in 2018/19).
     Corporate Buildings Total               s—s—<—~sSSs“‘“‘“ ™SCS;*;*;*;™;™;™;™;*#*dS:«OC«CNGQO2IS~~903 |S (184,618
     GravelRoadNetwork                                          OCC                       TT           COdCSCisS
      Design and Construct (Donnellys)             Costs brought forward from 2018/19 to
                                                   2017/18.
      Shire Gravel Resheeting-AnnualProgram   S| SS            SSC*~<“~*~*~*~s~S™S™SCS~sS CABS | SC ~=«dS SCAB
     GravelRoadNetworkTotal =             ss—=~<“—*~sS*‘“‘(CSNC#N#ONW#C#C(C#(#¥NNWYW’N¥’N”N’NW’N¥N”NYNY | S$. 62,485 $ 250,000 /$ 862,485
     HolidayParks                                                                            Ud

                                                                                                 Page 56 of 122
Log in to download the original file

2018-04-16 General Committee Agenda(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.