Page 56 of 122
Noosa Shire Council ATTACHMENT 2
2017/18 Capital Budget Review 3
For the period ending 30 June
Program Comment lente ta) BR3 Revised
Budget Budget
Capital Works $ 24,344,661 | $ 2,086,490 | $ 26,431,151
a
2018/19 based on revised delivery schedule.
2018/19 based on revised delivery schedule.
Oreala Cour Overpans, Suniee seach [Saas [S80
eaten [TT
adjusted down to reflect cost incurred to date.
BrdgesTotl s—<“—~*s*s~‘“s~‘“‘“‘—‘~*~‘“‘SSSS~<CS*é‘s;‘;*;*;*™”™C*~‘(;‘d‘S:«C« AG; $280,850 | $ 518,500,
Coastal Canals andWaterways SS —CSCSS TC
pogem
Program
Nealon __ LporaiiebaceaanrevseddeWvery schedule. | |
Noosaville 2018/19 based on revised delivery schedule.
[Noosa North Shore 3rd Cutting Beach Access | CSCSC*d SCHOO SC ~*~ «85D
Coastal Canals andWaterways Total = |Sst~=“~*‘*‘s*~*‘*‘~*~*~*~*~*~*~*~S~S~*S~S~S:«C«O,BO-S © 22BID| $172,688
CommercialLand&Propety ——CsCsSSSC
Stage 1 Construction of sewer services and landscaping works.
Peregian Beach, Rufous StCwilWoks | SSSC™~—SsSCSCSCSCSCCSCCC~*«dCS SC HOLBOG |S ~—«S «88ND |
Commercial Land &Property Total $8,119,628 | $113,983 | $3,233,611 |
CommunityFaciliies SS O—O—OOCCCCCCSCN“C (NSN Cd
Noosa Heads The Jrenewal of AV system Year20f3 | SSSCS™~—SCS~SS «WOODS SC ~—~«SS~—~90-000 |
Peregian Beach Public Amenities -Design Year| SSSSSSCSC~SCSCS~SS 8H] SC —«LS~—95,000_
2018/19 based on revised delivery schedule.
Cooroy Library, Repairs to Stiplightng | SC«d SOS CCS «880M |
Respite Centre Carport and intemal Automatic Doors | SSSCSC~SCS~S~S «8D —C-—~«S_—8,000 |
Respite Centre Rehabilitation Works | SSSSCSCS~™~SC~SCSCSCSCSC~S S10, S ——C-—~*| S~_—120,000
Tewantin SES Termite Damage ——=S=S*S*S~*S*«dE gO WOKS TO repair termite damage. |$ - |$ 8,900|$ 6,300
see eves Fens ewes |e |S eM |S 88
resolve WH&S issue.
pene |S LS TE
pump.
Ceo Senet een peaibutet ee |S |S ONS ON
pool blanket.
See eee eee et ees |S eels
panels.
Community Facilities Total $1,892,174 $64,716 | $1,327,455 |
CorporateBulldings SS —sSC ‘OOO CSC‘ CS
Doonella House -Emergentworks—SSsTSSC™C~“—~sS*SSsSSSSSSTSTSTTTTC‘dCSNS = (SSC CdS
fpacrmnt ee PS
replacement
2018/19 based on revised delivery schedule.
Noosa Depot Workshop Electrical Replacement | «SOS CdS «OO
Noosaville Depot- Replacement of ducted airconsystem | SSSCSC~S~S CASTS SAO
oplcoren ns vorees omen | Emergentweie to rep iiesowmenes [SS ears er
Replacement
Noosaville Depot OHS Roof Compliance Works | Emergent works identified for depotroof. _|$ - |$ 12,000|$ 12,000
construction planning and tender for a
administration building roof replacement
construction in 2018/19).
Corporate Buildings Total s—s—<—~sSSs“‘“‘“ ™SCS;*;*;*;™;™;™;™;*#*dS:«OC«CNGQO2IS~~903 |S (184,618
GravelRoadNetwork OCC TT COdCSCisS
Design and Construct (Donnellys) Costs brought forward from 2018/19 to
2017/18.
Shire Gravel Resheeting-AnnualProgram S| SS SSC*~<“~*~*~*~s~S™S™SCS~sS CABS | SC ~=«dS SCAB
GravelRoadNetworkTotal = ss—=~<“—*~sS*‘“‘(CSNC#N#ONW#C#C(C#(#¥NNWYW’N¥’N”N’NW’N¥N”NYNY | S$. 62,485 $ 250,000 /$ 862,485
HolidayParks Ud
Page 56 of 122See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.