2018-04-16 General Committee Agenda
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 57 of 122
Program Comment Current BR3 Revised
Budget Budget
Renewal
Noose Now Shore ResehoniCemparoundedevewemen| LS eS [F
HolidayParks Total S™—™~™—CSCSCSCSCSCSCSCSCSC*S «060,500
Parks &Playgrounds
Drainage) Year 1
Lake Macdonald Botanic Gardens MasterPlan | SSSCSCS~SCS~S «NOOO SC —«(S~—*0,000 |
Pomona Stan Topper Park Bolard installation | SSSCSC~S~S «GOODS ~*~ «95000 |
BBQ renewals along Gympie Terrace | SC~—~—CSCSC~*S SARS SC SS «(8,525 |
Parks &Playgrounds Total sS—~sSC“‘CSN™SO#*#*#*;*;*~*~™~*d*SS:«C«GOT«925
Pathways &EnablingFaciities | C—O
Alsager oem eer nei eee
All Stages
Noosaville Wallace Park Pathways Renewals | SSSSSCS~*~SCS~dS «98-000 | $ 80,000] § 260,000 |
Noosa Heads Main Beach Boardwalk Construction | SSCSC~—sCSCS SSC «STC ST '
poe of nee Noose PesestanandOrenencomeet
Noosa Heads, Park Road Boardwalk Construction =| CO 493,573 | $ = $493,573 |
scope.
scope.
poten Coens Patmney epee epee [Stee eee
scope.
acarandaParkTewantnSSC~SCSSCS™C~™~CSCSCOCCCTC~*dS«8DDOOT| | ——-—«'S~—80,000 |
SeahavenRockWal SYS SC™~COCCCCCCC~‘S' CABG] SC S*S «ASSO
of 2 2018/19 based on revised delivery schedule.
2018/19 based on revised delivery schedule.
[Boardwalk renewal at Gympie Tce, Noosavile | «dS «8000S ——- ~«dLS—8,000 |
Pathway renewal at Elm St, Coorey (trainto schoo) | SSCSCS™~C~SCSCS~S «NGOS «|S _—*13,000|
[Pathway renewal at David LowWay-Castaways Beach | SSSCS~—~~SCSS «0,000 S| ~——S- ~*~ 20,000 |
Pathway renewal at Goodwin Street-Tewantin | SSSCSC~—~SCS~S 2D] | SC ~« «4,000 |
Pathway renewal at Pacific Av-Sunshine Beach | SSSCSC~—CSCS~dS SCOOT S CS «8,000 |
Pathway renewal at Gympie Terrace | SCSC~“—~CSCS~S GSC SC«d S(T
Pathway renewal at James StNoosavile | SSSSCSCSC™~S~SCSCS~S 28D || ——C-—«S~_—25,000 |
Noosaville, Wiliam Street Shared Zone | SSCSCS~SCS~SS «ODDS «|S «000
Pathways &EnablingFacilities Total = S*~=<“‘*‘“*~‘“‘~*S*S*S*S*S*S*S~S~S~S*C*~S:«C 0
Public Transport infrastructure, | C—O
[Shire Bus Shelter Disabled Compliant Program: Year4 | SSSSSSSSCS~*~SCS~S BS OOLOOD |S ——C- ~~ S ~—600,000 |
scope.
Public Transport Infrastructure Total | st~<“<*~s‘“‘~‘~*~*~‘s*~*~*s*~*~*~*~*™S*S*S*S~S*S*~dSSC«C BT, |S ~—«77,8BB|S 815,000
SealedRoadsNetwork POC
Shire reseal & rehabilitation program | SSCS~S~S GSD | S| *| S (HOO.5 TE |
reconstruction 2018/19 based on revised delivery schedule.
pinoe ofSnee Santa boeat Ronse DreeteneiSemer
[Lake Weyba Drive Emergent Works === Emergentroad works on Lake Webya Drive. |$ - |S 45,196 |$ 45,106
Pereien Beseh, DavibowMiey Geaecetnenest gaan |S |S TNO
guardrail.
Sunshine Geach Resuseng reparsten Mens iezoierievesutacngpegam |S fe
to 2018/19 resurfacing program.
Ck eeemmen |peusionNORRA gratprgam |) fe
Claim inclusion in NDRRA grant program.
SealedRoadsNetwork Total sts—~<“—~‘sS™SCS S869, 067 |
SportsGroundandFaciliies | C—O
ons ee onenessesemenoom |
works
SportsGroundandFaciliies Total = )st~“‘“‘CSC™S;*;*;*™*;*;™;*™C*™*;™*™C™*C*‘*d*SS’:«FC«C#@S,SOD_| $ ~—«82,000$ 97,500
Page 57 of 122See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.