Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2018-04-16 General Committee Agenda

of 89

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Page 58 of 122

Program                                      Comment                                 Current       BR3     Revised
StormwaterDrainage                                                                     Budget                 Budget
 Neosevile Thomas Srey Teracecunenmepwcemem ft TS
Whole of Shire - Stormwater Structures —~—~—~=S«d|=SSSSCS™~—~—s~CS*~CS~SC‘CS~S~S~S~S~SS CHT  SC ~«dS CSTD
 (Cootharaba Kinmond CkRoadCuverts           |                SSCSCSCS~C~C~CSCSCSCSC*SS 2,005,000 $ _—-_—+| S 2,005,000
 Noosa Heads, Leslie Drive Stormwater Manholes—+(| —=~=S=~—“—S*~S~SS «OOOO |S                         ~—~*«S ~<A,
GoatesDr& De ounge cusowenPte                | SST
 Coates Dr & De Jounge Ct, Boreen Pt
 Renewal of catchpit tops at Sunshine Beach]                               SSSC*dSAG,OO|S          ~~ S_117,000 |
 renew ofvarous Sermwatrsincuesscosmemme fo
 Drainage renewal works at Weyba Rd, Noosaville =|                                    BOD |S         = =     68,000
 Stormwater Drainage Total                                                       $8,122,189 |-$ 313,000 | $ 2,809,189
 Streetscapes andRoad Corridors}
 Noose Heads Noose Parade Read omerMpaede tem
 Whole of Shire, Street Lighting Program      |                                       20,0001 $     - —S     20,000
 Streetscapes and RoadCorridors Total |                                 ——(Ci‘“CSCiS 1869S            $123,659
 Transport and InfrastructureManagement       }
 Ave (Werin to Sidoni)                         Costs brought forward from 2018/19 to
                                               2017/18.
 St Int upgrade Yr 1 of 2                      Costs brought forward from 2018/19 to
                                               2017/18.
 ready designs                                  ear for works planned for 2018/19.
 Weyba Road Corridorimprovements          |                                SSS*dS A,FODOOO |S     _—-_~—*| $7,700,000
                                               the project.
  Improvements                                 2018/19 based on revised delivery schedule.
Pomons Seton Road Carmaringandsseyimeovememey
 event Cory Noose Ra Tate Manegementoemvemmmy                              Som                         LS BOO
Roundaboutresuracng                           |                                       eee             SS
  Roundabout resurfacing
Transport and Infrastructure Management Total =                                CdS 4,745,584 $504,808 $F 5,250,393
WasteManagement                               |                        OC               TCU
 Noosenie Bamundt Road ene Mpawieeeesememy                                                        FO
 Noosaville Eumundi Road landfillNewShed      |                                       84000} S$     = LS     54,000 |
 Waste Management Total                                                              114,000) $      = $114,000
 Environmental Assets, Bushland, Tracks and Trails |
 Land Aquisition-Johns Landing                 PBF PGS                                                   S 2,117,187 |
Eriorowes     nes bind TasesTan Ts]                                             fe anna                [enn
  Other Capital                                                                   $ 4,235,277 | $ PAAR    ee    ae a
 AssetManagement:
feccalpogamming                  es |
 reseal programming
 Shire CCTV Drainage program             SSC*~dYSSSCSC~“~*S*~*~*~C~—C~SsSSSCSS *AFOLOOO |S          ~~~     ‘170,000
 awe LT
  Hardware
Zero Emissions priory minorprojects          | SSSCSC~—~—~SCS~SS «WOODS                            SC ~«dCS~—«8.00 |
Zero Emissions priority significant projects. S| SSSSSSSCSCSCS~SCSCSCSCSS 250,000 $                 ~~ S 250,000
 AssetManagement Total                                                              88S                     578741
Fleet-PlantReplacement                                                  OCC               Ud
Fleet-PlantReplacementTotal —sts~“—*~*~‘*~*~*~*~*~*~*~*~*S*S*~SCSCSSS «868087 | $ 170,000 | $ 1,738,087
Information Technology
 Technology One Systems Cl Anywhere Rollout  «| SSSSCSC~—~S~S~SS 88H BIL SC ~«dLS «8-9
 rectneleay {Asset Stems Mom Rotowieremee fo
Information Technology Total                                        —“‘i‘“‘CSCSCSCSCiSS 447A LS      =      446,762
PlanningScheme                              CSS                          OO             TCU
                                                                                             Page 58 of 122
Log in to download the original file

2018-04-16 General Committee Agenda(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.