Program Comment Current BR3 Revised
StormwaterDrainage Budget Budget
Neosevile Thomas Srey Teracecunenmepwcemem ft TS
Whole of Shire - Stormwater Structures —~—~—~=S«d|=SSSSCS™~—~—s~CS*~CS~SC‘CS~S~S~S~S~SS CHT SC ~«dS CSTD
(Cootharaba Kinmond CkRoadCuverts | SSCSCSCS~C~C~CSCSCSCSC*SS 2,005,000 $ _—-_—+| S 2,005,000
Noosa Heads, Leslie Drive Stormwater Manholes—+(| —=~=S=~—“—S*~S~SS «OOOO |S ~—~*«S ~<A,
GoatesDr& De ounge cusowenPte | SST
Coates Dr & De Jounge Ct, Boreen Pt
Renewal of catchpit tops at Sunshine Beach] SSSC*dSAG,OO|S ~~ S_117,000 |
renew ofvarous Sermwatrsincuesscosmemme fo
Drainage renewal works at Weyba Rd, Noosaville =| BOD |S = = 68,000
Stormwater Drainage Total $8,122,189 |-$ 313,000 | $ 2,809,189
Streetscapes andRoad Corridors}
Noose Heads Noose Parade Read omerMpaede tem
Whole of Shire, Street Lighting Program | 20,0001 $ - —S 20,000
Streetscapes and RoadCorridors Total | ——(Ci‘“CSCiS 1869S $123,659
Transport and InfrastructureManagement }
Ave (Werin to Sidoni) Costs brought forward from 2018/19 to
2017/18.
St Int upgrade Yr 1 of 2 Costs brought forward from 2018/19 to
2017/18.
ready designs ear for works planned for 2018/19.
Weyba Road Corridorimprovements | SSS*dS A,FODOOO |S _—-_~—*| $7,700,000
the project.
Improvements 2018/19 based on revised delivery schedule.
Pomons Seton Road Carmaringandsseyimeovememey
event Cory Noose Ra Tate Manegementoemvemmmy Som LS BOO
Roundaboutresuracng | eee SS
Roundabout resurfacing
Transport and Infrastructure Management Total = CdS 4,745,584 $504,808 $F 5,250,393
WasteManagement | OC TCU
Noosenie Bamundt Road ene Mpawieeeesememy FO
Noosaville Eumundi Road landfillNewShed | 84000} S$ = LS 54,000 |
Waste Management Total 114,000) $ = $114,000
Environmental Assets, Bushland, Tracks and Trails |
Land Aquisition-Johns Landing PBF PGS S 2,117,187 |
Eriorowes nes bind TasesTan Ts] fe anna [enn
Other Capital $ 4,235,277 | $ PAAR ee ae a
AssetManagement:
feccalpogamming es |
reseal programming
Shire CCTV Drainage program SSC*~dYSSSCSC~“~*S*~*~*~C~—C~SsSSSCSS *AFOLOOO |S ~~~ ‘170,000
awe LT
Hardware
Zero Emissions priory minorprojects | SSSCSC~—~—~SCS~SS «WOODS SC ~«dCS~—«8.00 |
Zero Emissions priority significant projects. S| SSSSSSSCSCSCS~SCSCSCSCSS 250,000 $ ~~ S 250,000
AssetManagement Total 88S 578741
Fleet-PlantReplacement OCC Ud
Fleet-PlantReplacementTotal —sts~“—*~*~‘*~*~*~*~*~*~*~*~*S*S*~SCSCSSS «868087 | $ 170,000 | $ 1,738,087
Information Technology
Technology One Systems Cl Anywhere Rollout «| SSSSCSC~—~S~S~SS 88H BIL SC ~«dLS «8-9
rectneleay {Asset Stems Mom Rotowieremee fo
Information Technology Total —“‘i‘“‘CSCSCSCSCiSS 447A LS = 446,762
PlanningScheme CSS OO TCU
Page 58 of 122See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.