Original source · versioned page text
2018-04-16 General Committee Agenda
The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 16 APRIL 2018
Figures 2, 3 & 4 – State Land
Photos taken from the Reserve looking towards rear of the development site
Unit 10 is located on the western edge of the development as shown in Figure 1 and is proposed
in an area of the site that is very low lying and wet due to a natural spring that flows over the
reserve and the site. The state land to the north of Unit 10 is similarly very low lying, wet and
contains some vegetation worthy of retention, with the area currently signed for regeneration. This
is evident in Figures 2, 3 and 4 and in the photographs above. Given these constraints emergency
vehicle access is not considered appropriate in this area, which would require construction of an
all-weather formation access driveway.
Page 85 of 122
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.