23. Demonstrate on the proposal plans how it is intended to collect and drain
stormwater runoff. It is noted in the planning report that it is intended to direct
stormwater to Council infrastructure, but as the site falls towards the rear of the
allotment where there will not be any Council stormwater infrastructure located it
is unclear as to how the site will be drained and whether there will be any impacts
as a result. Please provide plans and supporting documentation to demonstrate
how the site will be drained so as to have no external impacts and no net
increase in runoff. In review of the stormwater design for the site, consideration
should also be given to any overland flow paths that will flow through the site.
24. Provide plans that illustrate the proposed development in relation to the natural
ground levels of the site. In this regard please show the natural contours on the
plans, proposed surface levels, the natural ground level on all elevations of the
proposed buildings and provide at least 6 cross sections through the site (at least
2 in a North South direction and 4 in a east west direction).
25. Indicate on the plans, elevations, and cross-sections any cut or fill earthworks
and hence any retaining walls that may be required on site and the height of such
walls.
26. Please show on the proposal plans the actual location of the existing sewer main
that traverses the site (including any easements) and any manholes that will be
located within the site. Should this sewer be relocated, also show on the
proposal plans the intended location of the sewer main and the easement that
will be required over the new sewer.
Environmental Health
27. The waste areas within the proposed development do not adequately allow for
the use of bulk bins. Many premises will be able to use wheelie bins that can be
placed at the kerbside for collection, however some businesses will require bulk
bins to be serviced on site. Council requires that any waste vehicle that enters
onto a property must be able to enter and exist the site in a forward direction. The
current proposal would require waste vehicles to reverse out creating safety
problems and a more flexible and compliant waste management solution needs
to be proposed.
Please provide six (6) of all information that you are providing. In addition, it would
assist Council if you could also provide an electronic copy of your response.
Please be aware that under Section 3.2.12 of the Integrated Planning Act, the applicant
is to respond to any information request within 12 months of the request or otherwise,
the application lapses.
Under the provisions of the Integrated Planning Act 1997, you as the applicant, have
three options available in response to this Information Request. You may give the
assessment manager (in this instance Council) and each referral agency (if any):-
1. all of the information requested; or
2. part of the information requested together with a letter asking the assessment
manager and each referral agency to proceed with the assessment of the
application; or
3. a letter:-
Award Winner - Australian Clean Beach
Challenge 2004 Litter Prevention
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request for Further Information - 010.2007.00001841.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 21 KB (small file)
- File type
No other editions are linked here.