Original source · versioned page text
LATE RFI Attachment 6 - Stormwater Management Plan
The original of this document is very large (29.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTable 5 shows a breakdown of the expected Car Wash site patronage for a typical peak weekend itemised per hour into each different type of wash bay. This could actually be a Friday/Saturday or Saturday/Sunday combination- but an annual allowance of this ‘Peak Weekend’ occurrence would be for an allowance of 2 days per week. Again, the difference in sewer effluent discharge when not using/using a recycle system is almost 25kL! - 14 - TMC Building Design Group
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.