LATE RFI Attachment 6 - Stormwater Management Plan
The original of this document is very large (29.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTable 6 shows a breakdown of an expected Car Wash site patronage for a Flagship or event day itemised into each different type of wash bay. This type of event would be an irregular occurrence, but could be because of the site ’Grand Opening Day/Weekend’ or a fundraising day to support a local community group or local sporting organisation. An annual allowance of this ‘Flagship Event’ occurrence of 7 times per year has been made in the overall site annual water usage and sewer discharge calculations. In actual fact, the occurrence of this type of event is more likely to be only 2-4 times per year. Again, a point to note the vast difference in sewer discharge of over 40kL when not using and using a recycling system. - 15 - TMC Building Design Group
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.