GENERAL COMMITTEE MEETING AGENDA 14 JANUARY 2019
a. An accurate account of trees removed for the works including species, amount visual
dominance in the landscape and approximate age.
b. Replacement planting of trees removed in a minimum pot size of 45L.
c. landscaping treatment to the northern road reserve including the provision of advanced
tree stock of local native species to provide and maintain visually the rural nature of
the road corridor.
d. A 36 months maintenance program to ensure the growth of the replacement plantings.
B2. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
B3. All landscape works must be maintained generally in accordance with the approved design
for the life of the development.
With regard to the number and composition of trucks proposed to visit the site the external traffic
consultants advises:
(i) Prior to upgrading of Cooroy Mountain Road west of the access, until which time sections of
the road will remain with sealed widths of only 5.5-6.0m, there are traffic safety and
operational issues associated with having large vehicles using the road. In that regard, the
narrow sections of road, combined with its undulating nature, means that provision for
passing of large vehicle and cars in the opposing direction is substandard, such that one of
the vehicles will occasionally have to travel off the narrow sealed pavement area. The larger
the trucks, the greater the issue. Thus, prior to the upgrading of the road, truck numbers
should be limited as much as possible, and in particular the number of articulated vehicles
should be limited as much as possible.
(ii) After Cooroy Mountain Road has been upgraded west of the access, the safety and
operational issues will be largely eliminated, and the impacts of trucks would then be amenity
related. The amenity impacts will be on the residential streets in Cooroy used to connection
to Cooroy Mountain Road, and on the rural part of Cooroy Mountain Road. For the original
appeal, that limit as far as it was influenced by the development, was agreed to be 50 water
carrying trucks (including AV’s) plus 25 ancillary trucks (not including AV’s) per week.
(iii) Rigid vehicles are much more common on the road than articulated vehicles. Rigid vehicles
(such as a refuse truck, and furniture truck) regularly travel on residential streets, but the
occurrence of articulated vehicles on residential streets is rare. Thus, amenity impacts of
articulated vehicles on residential streets are perceived as being greater than the amenity
impacts of rigid vehicles.
Having regard for the above, in my opinion, until Cooroy Mountain Road is upgraded west of the
access, the number and composition of trucks should be limited as much as possible, for traffic
safety and operational reasons. Thus, it would not be appropriate to approve an increase in the
number and composition of trucks as was required in the original approval prior to the upgrade of
Cooroy Mountain Road.
After Cooroy Mountain Road is upgraded, the truck impacts are amenity related. However, in the
original appeal, that limit was agreed to be up to 50 AV’s and up to 25 rigid vehicles per week. The
amenity impacts of AV’s are greater than the amenity impacts of rigid vehicles, so simply limiting
the number of vehicles to 75, with all potentially AV’s, would increase amenity impacts. Whether
or not that is acceptable is a matter of resident perception… a 50% increase in the number of AV’s
per week is a substantial increase.
With regards to B-Doubles accessing the site the external consultant notes that the access route
passes along Miva Street which is a residential street environment. Thus, under no circumstances
should Council consider approval of the route for B-Doubles, nor should they consider increasing
Page 12 of 40
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.