Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2019-01-14 General Committee Meeting Agenda

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

GENERAL COMMITTEE MEETING AGENDA                                             14 JANUARY 2019


           and constructed to grades that prevent vehicles from scraping and/or bottoming.
           Should any driveways be constructed to grades that do not comply with
           ASINZS2890.1:2004 and AS2890.2-2002, Council will require that the driveway be
           removed and reconstructed to levels that do comply.
           B1.   The road reserve opposite the site access must be landscaped. The works must
                 be undertaken in accordance with an Operational Works approval and the Noosa
                 Plan for that specific area and must include in particular:
                 a.   An accurate account of trees removed for the works including species,
                      amount visual dominance in the landscape and approximate age.
                 b.   Replacement planting of trees removed in a minimum pot size of 45L.
                 c.   landscaping treatment to the northern road reserve including the provision
                      of advanced tree stock of local native species to provide and maintain
                      visually the rural nature of the road corridor.
                 d.   A 36 months maintenance program to ensure the growth of the
                      replacement plantings.
           B2.   All landscape works must be established and maintained in accordance with the
                 approved design for the life of the development, and in a manner that ensures
                 healthy, sustained and vigorous plant growth. All plant material must be allowed
                 to grow to full form and be refurbished when its life expectancy is reached.
           B3.   All landscape works must be maintained generally in accordance with the
                 approved design for the life of the development.
C.   Refer the proposed upgrade of Cooroy Mountain Road and Topaz Street to the Director of
     Infrastructure Services to determine the timing of the upgrade works within the 10 year
     Capital Works Program.

REPORT
1.   PROPOSAL
The applicant has requested Council provide a pre-request response notice to change conditions
of a Development Permit for a Material Change of Use for a Resource Based Bottling Plant issued
by the Planning & Environment Court. The Planning Act allows an applicant to seek a pre-request
response notice from Council before making their change application to the Planning and
Environment Court. Under the Planning Act changes to Court Orders where submissions were
previously received can only be made by the Court.
The owner of the site is looking to modify the current freight arrangements for the business
operating on the site. Currently the number of vehicles is restricted by condition 5C as per the
judgement ref: 4884 of 2014:
     5C.   Trucks attending the site must not exceed a total of 8 trucks per day and must not
           include B-Doubles.
The current owner wishes to alter this condition to allow additional trucks to the site per day,
proposing to differentiate volumes based on the completion of the upgrade works to Cooroy
Mountain Road.
The applicant seeks to re-introduce condition 5B (with some amendment) and change condition
5C to now read:
     5B.   Prior to the Council completing the staged upgrade works to Cooroy Mountain Road,
           weekly Trucks shall be limited as follows:
           a)    60 Trucks (namely all semi-trailers, tankers and other trucks, but excluding B-
                 doubles) per week


                                                                                   Page 5 of 40
Log in to download the original file

2019-01-14 General Committee Meeting Agenda(PDF, 2MB).pdf · 2.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.