and constructed to grades that prevent vehicles from scraping and/or bottoming.
Should any driveways be constructed to grades that do not comply with
ASINZS2890.1:2004 and AS2890.2-2002, Council will require that the driveway be
removed and reconstructed to levels that do comply.
B1. The road reserve opposite the site access must be landscaped. The works must
be undertaken in accordance with an Operational Works approval and the Noosa
Plan for that specific area and must include in particular:
a. An accurate account of trees removed for the works including species,
amount visual dominance in the landscape and approximate age.
b. Replacement planting of trees removed in a minimum pot size of 45L.
c. landscaping treatment to the northern road reserve including the provision
of advanced tree stock of local native species to provide and maintain
visually the rural nature of the road corridor.
d. A 36 months maintenance program to ensure the growth of the
replacement plantings.
B2. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed
to grow to full form and be refurbished when its life expectancy is reached.
B3. All landscape works must be maintained generally in accordance with the
approved design for the life of the development.
C. Refer the proposed upgrade of Cooroy Mountain Road and Topaz Street to the Director of
Infrastructure Services to determine the timing of the upgrade works within the 10 year
Capital Works Program.
REPORT
1. PROPOSAL
The applicant has requested Council provide a pre-request response notice to change conditions
of a Development Permit for a Material Change of Use for a Resource Based Bottling Plant issued
by the Planning & Environment Court. The Planning Act allows an applicant to seek a pre-request
response notice from Council before making their change application to the Planning and
Environment Court. Under the Planning Act changes to Court Orders where submissions were
previously received can only be made by the Court.
The owner of the site is looking to modify the current freight arrangements for the business
operating on the site. Currently the number of vehicles is restricted by condition 5C as per the
judgement ref: 4884 of 2014:
5C. Trucks attending the site must not exceed a total of 8 trucks per day and must not
include B-Doubles.
The current owner wishes to alter this condition to allow additional trucks to the site per day,
proposing to differentiate volumes based on the completion of the upgrade works to Cooroy
Mountain Road.
The applicant seeks to re-introduce condition 5B (with some amendment) and change condition
5C to now read:
5B. Prior to the Council completing the staged upgrade works to Cooroy Mountain Road,
weekly Trucks shall be limited as follows:
a) 60 Trucks (namely all semi-trailers, tankers and other trucks, but excluding B-
doubles) per week
Page 5 of 40
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.