Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2014-08-19 Planning & Organisation Committee Agenda - Pages 1-101

of 101

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                         AGENDA


  Planning & Organisation
    Committee Meeting


              Tuesday, 19 August 2014


                   commencing at 1.30pm
          Council Chambers, 9 Pelican Street, Tewantin



Committee: Crs Frank Wilkie (Chair), Noel Playford, Joe Jurisevic, Tony Wellington
Log in to download the original file

2014-08-19 Planning & Organisation Committee Agenda - Pages 1-101(PDF, 8MB).pdf · 8.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 87 (of 101)

Section 2

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA               19 AUGUST 2014


TABLE OF CONTENTS

ITEM                                                                    PAGE

ATTENDANCE & APOLOGIES                                                      3
PRESENTATIONS                                                               3
PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS                                4
DA Planning & Environment                                                   4
1      PLANNING & ENVIRONMENT COURT APPEAL 2985 OF 2014 DEVELOPMENT
       PERMIT FOR MULTIPLE HOUSING TYPE 4 - CONVENTIONAL AND VISITOR
       ACCOMMODATION TYPE 4                                                 4
2      APPLICATION FOR MATERIAL CHANGE OF USE - SERVICE AND UTILITY
       TYPE 3 (TOWER) SITUATED AT GRAHAMS RD, PINBARREN                     7
3      REQUEST TO CHANGE EXISTING DEVELOPMENT APPROVALS - INCREASES
       TO ONSITE OUTDOOR DINING AREAS AND RETAIL DISPLAY AREAS AT
       LAGUNA ON HASTINGS                                                  18
4      REQUEST TO CHANGE EXISTING DEVELOPMENT APPROVAL & EXTENSION
       TO RELEVANT PERIOD FOR A DEVELOPMENT PERMIT TO RECONFIGURE A
       LOT - 1 INTO 2 LOTS AT 1270 MCKINNON DRIVE, RINGTAIL CREEK          28
5      LEGISLATIVE AMENDMENTS TO TRUNK INFRASTRUCTURE PLAN AND
       CHARGES                                                             37
6      NATIONAL HERITAGE LISTING FOR THE COOLOOLA REGION                   47
Strategic Land Use Planning                                                51
7      PROPOSED AMENDMENTS TO THE NOOSA PLAN                               51
8      UPDATE ON ACCOMMODATING RECREATIONAL VEHICLES IN NOOSA SHIRE        95
CORPORATE SERVICES DEPARTMENT REPORTS                                     102
9      CORPORATE SERVICES DEPARTMENT UPDATE                               102
10     ENTERTAINMENT AND HOSPITALITY EXPENDITURE POLICY                   107
Finance                                                                   112
11     BUDGET REVIEW FOR CARRYOVER FROM 2013/14 INTO 2014/15              112
12     FINANCIAL PERFORMANCE REPORT JULY 2014                             123
EXECUTIVE OFFICE REPORTS                                                  130
13     EXECUTIVE OFFICE UPDATE                                            130
14     COMMUNITY ENGAGEMENT POLICY                                        134
15     EVALUATION OF LIVING SMART PROGRAM                                 143
16     MEMBERSHIP OF COUNCIL OF MAYORS (SEQ)                              151
17     APPOINTMENT OF 2015 SHOW HOLIDAY                                   153
CLOSED SESSION                                                      155




                                                                 Page 2 of 155

Section 3

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014



ATTENDANCE & APOLOGIES




PRESENTATIONS
Nil.




                                                     Page 3 of 155

Section 4

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                              19 AUGUST 2014


PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS
(Planning & Development Sections only)

DA Planning & Environment
1                         PLANNING & ENVIRONMENT COURT APPEAL 2985 OF 2014 DEVELOPMENT
                          PERMIT FOR MULTIPLE HOUSING TYPE 4 - CONVENTIONAL AND VISITOR
                          ACCOMMODATION TYPE 4
DOCUMENT IN FOR MATI ON




Author                           Manager, Planning & Environment – Kerri Coyle
                                 Planning & Infrastructure Department

Index                            ECM/Application/MCU14/0008

Attachments                      Nil.



         APPLICATION DETAILS

         Applicant                           Adamson Town Planning on behalf of Raphill Pty Ltd

         Proposal                            Development Permit for Material Change of Use – Multiple Housing
                                             Type 4 – Conventional and Visitor Accommodation Type 4 -
                                             Conventional

         Appeal Filed                        4 August 2014

         Number of Submissions               2 Properly Made and 1 not properly made


         PROPERTY DETAILS

         Property Address                    226 David Low Way, Peregian Beach

         RP Description                      Lot 12 SP 207105

         Land Area                           1201m2

         Existing Use of Land                Vacant


         STATUTORY DETAILS

         SEQRP Designation                   Urban Footprint

         Locality                            Eastern Beaches

         Zone                                Semi-Attached Housing

         Overlays                            No Overlays Applicable

         Assessment Type                     Impact




                                                                                                  Page 4 of 155

Section 5

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                19 AUGUST 2014


RECOMMENDATION
That Council note the report by the Manager, Planning & Environment to the Planning &
Organisation Committee Meeting dated 19 August 2014 regarding Planning & Environment Court
Appeal 2985 of 2014 and agree to defend the appeal.


REPORT
A report on this application to develop the site for multiple dwellings for use as either visitor
and/or permanent accommodation was considered by Council at its Ordinary Meeting on 31 July
2014. Council resolved to approve the application finding the following grounds were sufficient to
justify the decision despite the conflict with the planning scheme:

1.     The proposed small low cost permanent and visitor accommodation provides housing
       diversity ideally located in close proximity to the Peregian Beach neighbourhood centre and
       other social infrastructure.
2.     The building design is a well-articulated coastal building style that presents as domestic
       scale and integrates well with development in the surrounding area.
3.     The development allows sufficient separation between buildings, neighbouring properties
       and adequate area for soft landscaping, outdoor recreation and clothes drying areas.
4.     The site has been historically used for visitor accommodation.

An appeal was lodged with the Planning and Environment Court on 4 August 2014 by one of the
properly made submitters. The submitter seeks that the Court over turn Council’s decision and
refuse the application as the proposal is in conflict with The Noosa Plan; is likely to adversely
impact on amenity enjoyed by other uses; will visually dominate; has not satisfactorily addressed
drainage; and there are insufficient grounds to justify approval of the application.

While this appeal has been lodged by a submitter and it is largely for the applicant to defend the
appeal where they wish to proceed with the development, it is still appropriate for council to join
the appeal to defend Council’s decision where appropriate, provide information to the Court and
be a party to any proceedings should the applicant present amendments to the development
plans.

It is in order for Council to defend the appeal and the recommendation is worded accordingly.

Previous Council Consideration

A report on this application was considered by Council at its Ordinary Meeting of 31 July 2014.

Finance & Risk

The cost of the appeal will be largely borne by the applicant.

Consultation

External Consultation

Nil.




                                                                                    Page 5 of 155

Section 6

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            19 AUGUST 2014


Internal Consultation

Departments/Sections Consulted:

   Community Services                   X   Planning & Infrastructure
   Disaster Management & Public Order       Building & Plumbing Services
   Waste & Environmental Health             DA Planning
   Community Facilities                     Strategic Land Use Planning
   Cultural Facilities                      Asset Design & Investigations
                                            Asset Planning
                                            Civil Operations
                                            Environment

   Executive Office                         Corporate Services
   Community Engagement                     Finance
   Customer Service                         ICT
   Executive Support                        Procurement & Fleet
   Governance                               Property & Facilities
   Human Resources                          Revenue Services




                                                                              Page 6 of 155

Section 7

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                       19 AUGUST 2014


2                         APPLICATION FOR MATERIAL CHANGE OF USE - SERVICE AND UTILITY TYPE 3
                          (TOWER) SITUATED AT GRAHAMS RD, PINBARREN
DOCUMENT IN FOR MATI ON




Author                               Development Planner, Jack Lewis
                                     Planning & Infrastructure Department

Index                                ECM/ Application/ MCU13/0067

Attachments                          1.     Response by Applicant
                                     2.     Indicative Coverage Map


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 19 August 2014 regarding Application No. MCU13/0067 for a
Development Permit for Material Change of Use for Service & Utility Type 3 Tower situated at
Grahams Road, Pinbarren; and

A.                        Approve the application in accordance with the following conditions:
                          PLANNING
                          When Conditions must be Complied With
                          1.   Unless otherwise stated, all conditions of the Decision Notice must be complied with
                               prior to the use commencing, and then compliance maintained at all times while the
                               use continues.
                          Approved Plans
                          2.   Development authorised by this approval must be undertaken generally in
                               accordance with the Approved Plans listed below, unless otherwise amended by the
                               conditions of approval.

                                Plan No.                 Rev.    Plan Name                                  Date

                                4POM-51-09-COTT-C2       04      Overall Site Plan drawn by Aurecon         15/04/2014

                                4POM-51-09-COTT-C3       04      Site Set out Plan drawn by Aurecon         15/04/2014

                                4POM-51-09-COTT-C4       04      Site Elevation and Details drawn by        15/04/2014
                                                                 Aurecon

                          Building Height
                          3.   The maximum height of the structure must not exceed 31 metres above the finished
                               ground level and the natural ground surface.
                          4.   Certification must be submitted to Council from a Licensed Surveyor which certifies
                               that the monopole structure does not exceed the maximum height requirement of this
                               Decision Notice.
                          5.   No lights are permitted to be attached to the telecommunications facility, except
                               where required for aircraft hazard lighting purposes or similar.




                                                                                                         Page 7 of 155

Section 8

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            19 AUGUST 2014


    Health and Safety
    6.    The development must not, at any time during the life of the development, result in
          human exposure to environmental electromagnetic emissions exceeding the current
          regulations, standards and/or recommendations of the Australian Radiation
          Protection and Nuclear Safety Agency (ARPANSA). The carrier of the infrastructure
          must provide, at any time upon request by Council, written certification to
          demonstrate compliance with this condition. The written certification must assume:
          a.    a maximum number of users over the lifetime of any pole or other supporting
                structure
          b.    full power usage
          c.    a maximum down tilt of antennae.
    7.    Warning information signs and security fencing must be provided on the site to
          prevent unauthorised entry. Fencing must be camouflaged through the use of
          colours, materials and screening vegetation to blend the fence into the visual
          landscape.
    Colours and Finishes
    8.    The monopole and associated panels must be finished in colours that blend in
          visually into the landscape.
    Cessation of Use
    9.    The telecommunications facility must be removed from the site upon cessation of the
          use.
    Landscaping Plan
    10.   Dense screening vegetation shall be established around the enclosure in accordance
          with Council’s Policy on Landscaping Guidelines and a properly prepared landscape
          plan. Such landscaping is to be completed prior to the commencement of the use
          and maintained at all times thereafter. The Landscape Plan shall include at a
          minimum:
          a.    Identify and retain all existing trees within a 100m distance around the fenced
                compound area of the tower. Existing trees shall not be lopped or pruned below
                their existing height.
          b.    Appropriately selected tree species and understorey plantings to achieve dense
                visual screening of the tower and having regard to the soil conditions. Trees
                included shall be able to achieve up to 20m in mature height, though inclusion
                of fast growing species is also desirable to achieve early visual screening.
          c.    The planting areas should maximise the screening opportunities surrounding
                the tower and include appropriate planting for a distance up to 20m beyond the
                perimeter of the lease area, whilst maintaining access and electricity supply.
                A development application for Operational Works shall be required in this
                regard.
    Roadworks
    11.   The developer must provide an access driveway extending from the end of the
          existing driveway servicing 66 Mountain View Road to the site of the
          telecommunications tower. The works must be undertaken in accordance with an
          Operational Works approval and must include:
          a.    A formation sufficient to cater for the vehicle types expected during the
                construction and operational phases of the development
          b.    An alignment that protects significant vegetation and minimises the effects on
                the adjoining properties.



                                                                                Page 8 of 155

Section 9

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  19 AUGUST 2014


      12.   During the construction phase the developer is responsible for maintenance of the
            access driveway extending from the end of the sealed section of Mountain View
            Road to the site of the telecommunications tower.
      13.   During the operational phase:
            a.    The developer is responsible for the ongoing maintenance of the access
                  driveway extending from the end of the existing driveway servicing 66 Mountain
                  View Road to the site of the telecommunications tower,
            b.    The developer must enter into an agreement with the owner of 66 Mountain
                  View Road to share the costs of ongoing maintenance of the access driveway
                  extending from the end of the sealed section of Mountain View Road to the end
                  of the existing driveway servicing 66 Mountain View Road.
B.    Find the following are sufficient grounds to justify the decision despite the conflict with the
      Planning Scheme:
      1.    The telecommunications facility will provide coverage for the NBN fixed wireless
            network, allowing for the delivery of higher speed data to households in the area;
      2.    The proposal is screened by substantial vegetation buffers and does not adversely
            impact the existing visual qualities of the area.



PREVIOUS COUNCIL CONSIDERATION
At the Ordinary Meeting on the 31 July 2014, Council resolved to defer to the next round of
meetings consideration of Application No. MCU13/0067 for a Development Permit for Material
Change of Use for Service & Utility Type 3 Tower situated at Grahams Road, Pinbarren and
request the applicant to:
1.    Investigate alternative sites to locate the tower that minimise visual impacts for residents
      and impacts on the views of Mt Cooroora.
2.    Provide a site plan detailing the likely area of service for the tower for the current location
      and alternative sites investigated.

REPORT
On Friday 8 August the applicant responded to Council’s resolution.                A summary and
assessment of the response is included below:

Investigate Alternative Sites
The applicant highlights their previous advice, suggesting that the alternative locations west of
Pomona Kin Kin Rd would require a facility at least 50m in height. This assertion is qualified by
transmission assessments for three alternative sites along Greenridge Pinbarren Road, based on
the terrain and obstructions (trees) limitations blocking a direct line of site transmission link back
to the approved National Broadband Network (NBN) facility at Pioneer Road, Pomona.

The applicant contends that a 50m+ tower along Greenridge Pinbarren Road would have more of
a visual impact on the surrounding residents than the proposed site. This part of Pinbarren is
zoned Rural Settlement and includes a greater number of houses than the proposed site, which
enjoy views south to Mt Cooroora, west to Mt Cooran and east to Mt Pinbarren. Greenridge
Pinbarren Road also forms part of the Major Road Network and is the main road connecting
Cooran to the east. While this part of Pinbarren already includes 25m high electricity stanchions,
it is agreed that a 50m+ tower along these relatively low lying areas adjacent to Pinbarren Creek
would be more prominent than the proposed tower and contrary to The Noosa Plan, which seeks
for Telecommunication Towers to not degrade views from the major road network.



                                                                                      Page 9 of 155

Section 10

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 19 AUGUST 2014


The applicant also highlights that the alternative locations to the north of Pomona Kin Kin Road
would require a substantial tower located between the road and Mt Pinbarren, and would not be
an appropriate visual outcome. While the areas along Binalong Road (situated on the southern
slopes of Mt Pinbarren) were also identified within the original application, this area was
discounted due a lack of landowner agreement, and is surrounded by a number of houses within
the Rural Settlement zone, that would view any tower in this location.

The applicant contends the current proposal is in the best location to provide service to the
surrounding residents. The applicant notes that they have redesigned the entire NBN fixed
wireless network for the Sunshine Coast and Gympie areas, so as to reduce the height of this
tower from 40m to 30m and take advantage of the existing screening vegetation on the subject
site. The applicant has also actively consulted with community information sessions and consider
they have achieved the right balance between providing appropriate coverage and minimising the
visual impacts of the tower.

Network Coverage Map
The applicant highlights that the tower will provide service to approximately 230 houses in the
Pinbarren area. This is achieved by direct line of site from the top of the tower to surrounding
houses within a 3-5km radius around the antennas. The proposed plans indicate that there is to
be three antennas on the tower, providing coverage to the north, south and east. NBN Co
indicate that Cooran and the Rural Settlement zoned areas of Pinbarren have been planned to
be serviced with the NBN by either Fibre to the Premises or Fibre to the Node.

The applicant reiterates their previous response, outlining they do not issue coverage maps to
show which areas/houses will directly benefit from this service until the network has been
physically built and tested. This is because there may be areas on the fringe that may
alternatively benefit from satellite services. Rather, the development would provide a competitive,
reliable broadband to over 200 houses, where communication services are often poor, consistent
with the Overall Outcomes of the Infrastructure Uses Code of The Noosa Plan, which seeks
residents have access to adequate levels of infrastructure to meet their needs.

While the applicant still has not provided detailed coverage maps for the likely tower
infrastructure, attachment 2 has been generated by officers to provide a graphical overview of
the coverage areas based on the above mentioned parameters.

CONCLUSION
The applicant has responded to Council’s request for further information on alternative sites
within the Pinbarren area to locate the tower, concluding that the alternative sites would require a
50m+ tower, located closer to the major road network and Rural Settlement zoned properties.
The current proposal is considered to strike the most appropriate balance in terms of providing
appropriate levels of coverage, while minimising the visual impacts on adjoining residents.

Although the applicant has declined to provide coverage maps for the proposed tower, a
coverage map has been generated by officers based on the parameters mentioned in the
application. This map indicates that the applicant’s assertion of approximately 230 houses
gaining coverage from the infrastructure is roughly accurate.

The proposed tower at Grahams Road is set amongst existing vegetation and is an acceptable
distance away from neighbouring properties and the major road network, so as not to be visually
dominant or obtrusive. It is considered the following grounds are sufficient to support the
proposal:

                               



                                                                                   Page 10 of 155

Section 11

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  19 AUGUST 2014


     The telecommunications facility will provide coverage for the NBN fixed wireless network,
       allowing for the delivery of higher speed data to households in the area; and
     The proposal is screened by substantial vegetation buffers and does not adversely impact
       the existing visual qualities of the area.
The application is therefore recommended for approval, subject to conditions.


Departments/Sections Consulted:

     Community Services                       x   Planning & Infrastructure
     Disaster Management & Public Order           Building & Plumbing Services
     Waste & Environmental Health             x   DA Planning
     Community Facilities                         Strategic Land Use Planning
     Cultural Facilities                          Asset Design & Investigations
                                                  Asset Planning
                                                  Civil Operations
                                                  Environment

     Executive Office                             Corporate Services
     Community Engagement                         Finance
     Customer Service                             ICT
     Executive Support                            Procurement & Fleet
     Governance                                   Property & Facilities
     Human Resources                              Revenue Services




                                                                                    Page 11 of 155

Section 12

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014




                                                     Page 12 of 155

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                      19 AUGUST 2014

                                                                                                       ATTACHMENT 1

                    Dear Kerri Coyle,
                    NBN Co is writing in response to Council's resolution of 31 July 2014 to defer DA MCU13/0067
                   for a proposed NBN Fixed Wireless facility at Grahams Rd, Pinbarren. NBN Co notes that the
                   grounds for the Development Application deferral were:
                        1. Investigate alternative sites to locate the tower that minimise visual impacts for residents
                           and impacts on the views of Mt Cooroora.
                       2.  Provide a site plan detailing the likely area of service for the tower for the current location
                           and alternative sites investigated.
                    Before addressing these two issues individually, we wish to highlight to Council that this
                    Development Application has been the subject of a lengthy and rigorous investigation spanning
                   one year and four months.
                    Since lodging the Development Application with Sunshine Coast Regional Council on 18 April
                   2013, Council has requested an Information Request, and NBN Co has twice requested an
                   extension to the Information Request to enable us to undertake detailed site assessments and an
                   entire network re-design to facilitate alternative sites. Council has also twice extended the
                    Decision Making period to consider this Development Application.
                   We are disappointed to read the sentiments expressed this week in the Noosa News, considering
                   our continued cooperation with Council and residents regarding alternatives at Pinbarren. We
                    believe that Council has sufficient information to determine the Development Application that is
                    before it, including a detailed response to the Information Request relating to alternative sites.
                    1. Investigate Alternative Sites
                    NBN Co highlights that the Development Application currently before it already represents an
                   amendment to both the design and location of the original proposal, albeit within the same
                    property. It is nevertheless an alternative proposal to the original Development Application, which
                    has been carefully considered, and has previously required extensive network-wide revisions to
                   develop it.
                    NBN Co responded in good faith to an individual resident’s objection to the original Development
                   Application, by not only investigating alternative sites, but further, by re-designing the entire local
                   transmission network in both the newly formed Noosa Shire Council and Gympie Regional
                   Council to enable any alternative to be made.
                   To be specific, to ensure the validity of a 30m pole at a lower ground elevation, in a location
                   which takes effective advantage of existing tree screening off Grahams Rd, NBN Co has had to
                    remove transmission dishes from this proposal and relocate them to others facilities. NBN Co
                   also has had to re-direct transmission away from the Pinbarren proposal to other network
                   facilities. This was no small undertaking, both technically and commercially, and represented a
                    meaningful and significant response to the concern raised by the immediate neighbour.
                   We would reiterate that before proposing this particular alternative to Council, NBN Co did
                   consider a number of alternative sites west of Pomona Kin Kin Rd. A detailed consideration of
                   these alternative sites was previously discussed in our Response to the Information Request,
                   dated 8 May 2014.
                   We highlight to Council our advice in the Response to the Information Request, that alternative
                    locations west of Pomona Kin Kin Rd would require a facility at least 50m tall. Following Council's
                    resolution of 31 July 2014, NBN Co has requested a more detailed technical assessment from
                   our radio and transmission engineers of the necessary heights required at the three alternative
                    locations west of Pomona Kin Kin Rd, where the local ground elevation is highest. These
                    locations are:

                       e   Alternative Location 1 — 1347 Greenridge Pinbarren Road, Pinbarren
                       e   Alternative Location 2 — 1298 Greenridge Pinbarren Road,

                       8                                                                            Ss
                        qaurecon                                                                ERICSSON

                                                                                                          Page 12 of 155

Section 13

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014




                                                     Page 13 of 155

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                        19 AUGUST 2014

                            Cooran
                        e   Alternative Location 3 — 1344 Greenridge Pinbarren Road, Pinbarren
                    We advise Council that the minimum necessary height required at Alternative One would be 55m,
                    and the minimum necessary height required at Alternatives Two and Three would be 85m to clear
                    obstructions  including vegetation.  These   heights  are required to make a_      point-to-point
                    transmission link back to the adjoining (and approved) NBN facility at Pomona, to connect
                    Pinbarren back to the main NBN network.

                    Therefore, there is no question of proposing a lower height with a compromised service area —
                    this transmission height requirement represents an absolute technical pass or fail. Either the
                    transmission dish sees the adjoining network facility (to connect the community), or it doesn’t
                    (cutting off the community). Unfortunately a transmission link cannot be made at heights lower
                    than 55m at these alternative locations, and there are no other higher locations west of Pomona
                    Kin Kin Rd that offer elevations which could enable a shorter structure.

                    Please refer to Figures 1 to 3 below for the transmission assessment of the facility heights
                    required for the alternative locations west of Pomona Kin Kin Road. These figures illustrate the
                    terrain and obstruction (trees) limitations blocking a transmission link back to Pomona and
                    provide justification as to why these facility heights are required.
                    -  Nome 1 =x                          7                           Og]
                    @®@ame ¥ ELF]                                                                               (3) #
                        oc                             =__—_—_—_—_—_—_—_—_—_—_——_—_—_—_—_—_—_—9
                     GL0> ie  E2 tet ST/42=067)—    97-94%
                                          Ss
                      140                                                                                           =
                                                              terrain and obstructions                              =
                                                               (e.g. trees)                                         Fa
                      120                                                          i
                      100             Approved NBN Pomona      ;                      H    S
                             :        South Facility Location
                         ee                                JS                                   £4“)       y ™
                        0        0s       10      1.5      20       26       3.0     3.5       40       45        61
                         Pomona South                             Distance (km)                               Council_1
                                    Figure 1: Transmission Assessment at Alternative Location 1
                       =    caaaameemaas                           .                  -                             0
                     ame k HF                                                                                   Gin 4
                       san —————————— 100008 (1 97                                                                .
                        . Diesrence?? (et2 4 S7/k2=080)8 hg                                              =
                       160

                       140                                                                                         =
                                                                                                                   ;
                      120                                                                                          =
                      100                                        oy       y              .      rs
                         PO                                         SS                            YN        a
                       Ry        os       1.0      16      2.0       25       30       35       40       45       5.0
                         Pomona South                             Distance(km)                               Council_2
                                    Figure 2: Transmission Assessment at Alternative Location 2

                       é                                                                              Ss
                        qaurecon                                                                  EHIESSON

                                                                                                            Page 13 of 155

Section 14

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014




                                                     Page 14 of 155

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                    19 AUGUST 2014

                      —                                       i               _—                                o
                    @®@awe & HIE]                                                                          ain #
                        ———— | F202 Kr 1 57
                      i Totat Loss = 126.4268                             ————___—_—_—_                       | —
                    (570) [EES AE     cence   er ae                                                            asd)
                      160

                      140                                                                                     e
                      7                                                                                       i
                      "t         7           |
                      EEE                                                                                   yo
                        Pomona South                           Distance(km)                              Council_3
                                   Figure 3: Transmission Assessment at Alternative Location 3
                   We remind Council that the Development Application does include a discussion of additional
                   alternatives sites that NBN Co considered north of Pomona Kin Kin Rd, and we highlight that
                   those locations were either inaccessible (due lack of landowner agreement) or prominently placed
                   along the major road network. Council’s Planning Director had previously counselled NBN Co not
                   to propose facilities directly adjacent to Pomona Kin Kin Rd, or faciltiies that required significant
                   tree clearing.
                   NBN Co advises that having already re-designed the broader local transmission network to
                   enable a 30m pole off Grahams Rd, and having progressed the surrounding network over the last
                   twelve months, NBN Co does not intend to carry out another re-design of the Sunshine Coast and
                   Noosa transmission network.

                   1.1 Relative Planning Merit of Alternative Sites at 55m
                   We understand that some Councillors have suggested that a 50m+ structure west of Pomona Kin
                   Kin Rd may be a preferable outcome to the 30m structure proposed off Grahams Rd. In
                   response, NBN Co respectfully submits that a lattice tower structure, approximately twice the
                   height of the monopole structure proposed at Grahams Rd, and at least four times the width,
                   would not represent a better planning outcome at Pinbarren.
                   NBN Co appreciates that while an alternative site west of Pomona Kin Kin Rd may satisfy
                   individual residents located on Grahams Rd, we maintain that an objective assessment of the
                   visual impact would not support this alternative. Importantly, we do not believe it would meet with
                   the approval of the broader community — considering that Alternative Location 1, at 1347
                   Greenridge Pinbarren Rd, is in relatively close proximity to a substantial cluster of residences.
                   Please see Figure 4 below for an aerial image illustrating the proximity of Alternative Location 1 to
                   surrounding residences.

                       @                                                                          S
                        qaurecon                                                               ERICSSON

                                                                                                       Page 14 of 155

Section 15

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014




                                                     Page 15 of 155

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                      19 AUGUST 2014

                                                    }                                  i     :    eo
                                                                                       i         e.   - ,  i‘ o> .
                                                                                              y         en   oO
                                :              Z                                                ite          9.
                                         1347, ceetee Pinbarren Rd Et lattice towemrequired 9 < 1  ; : = vars z e
                                            a       :                i ad           =           1) ot      aaa! Bee
                         - 28              2,            7             Dis                s              Ree
                              2 |              ee      Ps         ee |    é            ee                    ce
                    .         Te           Fy           ls:      3        Le          are            {        as
                        2                TO             ecg          ee                        eae eS
                                          dL Paes.   ee      4   S       ys     0      ;    Re              +
                                                 eh     ee OE [Sie        ae          M Ze          i
                          ,               rs        geal;    Gull”       ae   SAS)      ae ae                  '
                      we       oe             7 |            fat          .   it      :           a             @
                                ~. oak    Siete   P.         Y ba          b's Ue t   EO}      ie            rela
                        “ie   Faia   aes Mi!     a   ..   Le       DigitalGlobe        3          :
                          Oo        go          pie. a                                a           %
                      7           eee Sie of!  3           Berns rr                oN     fe      Gooaleeart!
                     Puch r ve eld      ane                        Ce ee ee ed Slr     Oat      Ce ee
                                          Figure 4: Aerial Image of Alternative Location 1
                   NBN Co respectfully suggests that any of the three alternative locations would result in a
                   significantly greater visual impact to a large part of the community at Pinbarren, and will meet with
                   wider community objection. We confidently make this assertion, following the positive feedback
                   we received at our Community Information Session on 18 March 2014, during which NBN Co
                   received strong endorsement from participating residents for the alternative 30 m monopole that
                   we have proposed.
                   NBN Co advises that over 16 months, a thorough investigation of alternatives sites has been
                   conducted and documented to Council, taking into account the undulating terrain, technical
                   constraints, and potential visual amenity impacts. This process has been undertaken in good
                   faith, and in absolute cooperation with Council.
                   NBN Co maintains there is no better proposal than the Development Application currently before
                   Council to provide effective service to Pinbarren that minimises visual intrusion to the community.
                   For this reason, NBN Co does not intend to further pursue an investigation of alternative sites.
                   We request that Council determine the Development Application currently before it on its planning
                   merits.

                   2. Provide a Site Plan of proposed site and alternatives
                   NBN Co always seeks to strike a balance between maximising the reach of our service while
                   minimising the planning impacts of our infrastructure.
                   As above, NBN Co has advised Council that the alternative sites provide an analogous service to
                   the community as the facility proposed in our Development Application — but that they require
                   significantly greater structures to do so to connect back to Pomona. This is not a question of how
                   many properties are serviced — it is a question of whether the dish can see the Pomona facility or
                   not. We maintain that the alternative sites, requiring very large lattice towers, do not best strike
                   that balance between service provision and planning impacts.
                   NBN Co also advises Council that the proposed structure will introduce an NBN Fixed Wireless
                   service to ~230 premises in the Pinbarren community where presently this service is not
                   available. NBN Co believes this represents a clear public good — the provision of competitive,
                   reliable broadband    to hundreds   of houses    in  an  area  where

                       2                                                                           Ss
                        qaurecon                                                                ERICSSON

                                                                                                          Page 15 of 155

Section 16

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014




                                                     Page 16 of 155

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                      19 AUGUST 2014

                   communications services are often poor, or even unavailable. As previously advised to Council,
                   NBN Co does not issue coverage maps, and alternatively we identified the number of properties
                   that will benefit from the service provision to assist Council in its assessment of the public good
                   inherent in this Development Application.
                   We respectfully request that Council assess the Development Application we have submitted
                   against its planning merits, and not against hypothetical alternatives that NBN Co does not intend
                   to pursue for the valid planning reasons outlined above.
                   We believe that NBN Co has demonstrated a record of real cooperation and flexibility with both
                   Council and residents in Noosa Shire, and that this approach is evident at Pinbarren, where an
                   alternative site has been submitted to Council in response to community feedback and Council’s
                   Information Request, and was also put to widespread community consultation, in a process
                   lasting well over a year.
                   NBN Co continues to believe that we have put our best foot forward at Pinbarren, and that the
                   Development Application submitted to Council does have genuine planning merit. This we believe
                   is reflected in the Council Planner’s assessment, which recommends approval of the proposed
                   facility.
                   We respectfully urge Council to determine the Development Application submitted at its upcoming
                   August meeting.
                   Please    contact    Claire   Harris   on    3173    8738     or   alternatively  by    e-mail
                   [email protected] if you require further information.
                   Yours Sincerely,

                        Set
                      Qa
                   James Irwin
                   Project Leader (Aurecon)

                       a                                                                           Ss
                        qaurecon                                                               ERICSSON

                                                                                                         Page 16 of 155

Section 17

                                                                                                                                        Attachment 2
                                                                                Indicative Coverage Map (with terrain, land boundaries and zones overlayed)




*Generated by Jack Lewis 11 August 2014 using Google Earth and QLD Government Overlays
                                                                                                                                        Page 17 of 155

Section 18

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  19 AUGUST 2014



3      REQUEST TO CHANGE EXISTING DEVELOPMENT APPROVALS - INCREASES TO
       ONSITE OUTDOOR DINING AREAS AND RETAIL DISPLAY AREAS AT LAGUNA ON
       HASTINGS
Author             Senior Development Planner, Denis Wallace
                   Planning & Infrastructure

Index              ECM Applications 51997.2384.03 (12506 TC) & 132009.1102.03 (09/1102)

Attachments        1.    Proposal Plan



APPLICATION DETAILS

Applicant                      Never Holdings Pty Ltd
                               C/- Martoo Consulting Pty Ltd

Proposal                       Request to Change Existing Development Approvals – Expansion of
                               Onsite Outdoor Dining, Retail Display Areas

Original Approval Type         Town Planning Consent (Multiple dwelling (115 units), shops,
                               restaurants, outdoor dining areas and ancillary facilities)

Properly Made Date             05/02/13


PROPERTY DETAILS

Property Address               Units 1, 6 & 7 Laguna On Hastings Arcade, 32 Hastings Street, Noosa
                               Heads

RP Description                 Lot 15 N21848

Existing Use of Land           Multiple Dwellings, Shops and Restaurants


STATUTORY DETAILS

SEQRP Designation              Urban Footprint

Locality                       Noosa Heads

Zone                           Visitor Mixed Use

Assessment Type                Permissible Change to Existing Approvals




                                                                                     Page 18 of 155

Section 19

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    19 AUGUST 2014


RECOMMENDATION
That Council approve applications No. 51997.2384.03 (12506 TC) & 132009.1102.03 (09/1102)
requesting changes to existing development approvals for Material Change of Use (Multiple
dwellings (115 units), shops, restaurants, outdoor dining areas and ancillary facilities), situated at
32 Hastings St Noosa Heads, in accordance with the following:
A.    Change the approval description/type for 132009.1102 to Entertainment & Dining Business
      - Type 1 (Food & Beverages).
B.    Change Condition 1 (of 132009.1102) and Condition 38 (of 51997.2384) to read as follows:
      Condition 1
      Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are listed in the following table and as
      may be amended by these conditions.

        Plan No.              Rev    Plan / Document Name            Consultant               Date

        326 – D01             D      Floor Plans Existing and        Thompsett                24/08/2011
                                     Proposed                        Architecture

        D-C01376-01- B        _      Proposed Additional             Martoo Consulting        29/01/2013
                                     Exclusive Use Areas             Pty Ltd

      Condition 38
      Outdoor dining areas shall be limited to those areas shown on approved Plan No. D-
      C01376-01-B titled “Proposed Additional Exclusive Use Areas” drawn by Martoo Consulting
      Pty Ltd dated 29/01/2013.
C.    Include an additional Condition to 51997.2384 to read:
      The existing “green wall” garden beds that have been established in the locations identified
      as “Existing Vertical Green Wall” and “Proposed Vertical Green Wall” on approved Plan No.
      D-C01376-01-B titled “Proposed Additional Exclusive Use Areas”, shall be maintained in
      good condition, with plants of poor health replaced when required.
D.    Amend the list of Approved Plans.
E.    Agree to Execute the associated Infrastructure Agreement for Contributions in Lieu of On-
      Site Parking Spaces, prior to the issue of the Decision Notices.



REPORT
1     PROPOSAL
The application seeks approval for a Permissible Change to two existing development approvals
for the Laguna on Hastings development. The requested changes involve a change of use from a
shop to a restaurant for one tenancy and increases to designated onsite outdoor dining areas,
retail display areas or utility areas of three commercial tenancies that surround a common
courtyard/plaza area. Details of the commercial tenancies and the proposed changes are
detailed below. Note all areas described are within the site and are not footpath dining or the like.
A full site proposal plan is also included as Attachment 1.




                                                                                      Page 19 of 155

Section 20

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               19 AUGUST 2014


Tenancy 1 – Noosa Heads Pharmacy
19m2 increase to the outdoor display area associated with the Chemist, with the additional area
located to the front and side of the existing premises. This area has been used by the chemist for
an extended period of time (>10years).




                    Figure 1 - Display Area in Front of Noosa Heads Chemist




          Figure 2 - Proposal Plan of Additional Display Area to Noosa Heads Chemist




                                                                                  Page 20 of 155

Section 21

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             19 AUGUST 2014


Tenancy 6 – Shop/Restaurant (previously Sandy’s Deli)
Change of use for the internal space from shop to restaurant, 76m 2 of additional outdoor dining
area and a new 22m2 utility area at the rear of the premises (for storage/back of house
purposes).




                 Figure 3 – Vacant Tenancy at Unit 6, Previously Sandy’s Deli




                        Figure 4 - Proposed Utility Area to rear of Unit 6

                                                                                Page 21 of 155

Section 22

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              19 AUGUST 2014




         Figure 5 – Proposed Plan of Additional Outdoor Dining & Utility Area to Unit 6
Tenancy 7 – Aromas Café
56m2 increase to the existing designated outdoor dining area. The increase expands the outdoor
dining westward and to the rear of the café. The expanded area has been used by Aromas for
some time (2 years +).




                        Figure 6 - Outdoor Dining Area at Aromas Café




                                                                                 Page 22 of 155

Section 23

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               19 AUGUST 2014




             Figure 7 – Proposed Plan of Additional Outdoor Dining Area to Aromas


2     BACKGROUND
Council issued town planning consent TC12506 (51997.2384) in 1998 for 115 units, 8 Shops, 2
restaurants, outdoor dining and ancillary facilities on the site. The applicant subsequently
submitted plan amendments that included a reduction in the number of units from 115 to 112,
deletion of a restaurant, reduction in dining areas, and reduction in height of buildings fronting
Hastings Street.
On the 22 January 2010, Council issued development approval 132009.1102 for a change of use
to a shop with outdoor dining areas at Unit 6. Subsequent changes to this approval were issued
on the 30 September 2011 allowing part of the outdoor dining area to be enclosed.
A change approval (51997.2384.01) was issued in 2012 allowing security screening to outdoor
dining areas to Unit 7 (Aromas).
3     ASSESSMENT
3.1   Statutory Process
The proposed change to the development approval requested by the applicant is considered to
constitute a permissible change because:
    The changes would not result in a substantially different development as the additions are
      to existing approved uses on the site;
    The change would not trigger a new referral to the State Assessment and Referral Agency;
    The original application was impact assessable and the proposed changes would not likely
      cause a person to make a properly made submission as the changes remain consistent
      with the character of the approved development on the site; and
    The changes do not involve prohibited development.
On this basis, the applicant is considered to be following the lawful process in making the
request.
3.2   State and Other Statutory Instruments
The proposal is generally consistent with current State planning and statutory instruments
applicable to the site.

                                                                                  Page 23 of 155

Section 24

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     19 AUGUST 2014


3.3    Statutory Provisions - Planning Scheme
The site is located in the Visitor Mixed Use zone of the Noosa Heads Locality Plan area under
The Noosa Plan. The approved retail and dining uses within the subject tenancies are listed as
consistent uses within the zone and contribute to the desired mix and character of Hastings
Street. In particular, the outdoor dining areas contribute to the street’s vibrancy and appeal as a
restaurant and tourist destination.
The Planning Scheme codes applicable to the proposal comprise:
Assessment against these raises some planning concerns, detailed below.
     Car Parking Noosa Heads Locality Code
     Business Uses Code
     Landscaping Code
     Engineering Works Codes
The increased use areas of the tenancies will generate additional parking demand.                   The
applicable planning scheme requirements for parking are:
Tenancy 1 =      19m2 x 1 space/20m2 (retail)                           = 1.9 spaces
Tenancy 6 =      76m2 x 1 space/10m2 (dining)                           = 7.6 spaces
                 Less provision for an internal kitchen area to which
                 parking does not apply - 30m2 x 1 spaces/10m2          =-3.0 spaces
Tenancy 7 =      56m2 x 1 space/10m2 (dining)                           = 5.6 spaces
                                                                Total: = 12 spaces
The applicant is unable to provide additional parking on the site but is willing to pay contributions
in lieu, in accordance with the (now repealed) Planning Scheme Policy PSP13 Contributions in
Lieu of the Provision of Off-Street Parking, which was in place at the time of the application
lodgement.
Monetary Contributions in Lieu of Parking
The applicant has undergone protracted negotiations with Council’s planning section over the
issue of car parking for this proposal. It ultimately agreed to enter into an Infrastructure
Agreement for contributions in lieu of providing 12 car spaces in line with PSP13. The indexed
contribution totals $262,008. Council officers drafted an agreement on this basis and it was
recently returned signed by the applicant. Its full execution is now pending a decision on this
matter. Council is not obliged to sign the agreement.
At its Ordinary Meeting of 26 June 2014 Council resolved:
      That Council note the report by the Senior Strategic Planner to the General Committee
      Meeting dated 23 June 2014 and request Strategic Land Use Planning to prepare a detailed
      report addressing the feasibility of accepting contributions in lieu of the provision of off-street
      parking within each locality and, in the interim, not generally accept monetary contributions in
      lieu of the provision of off-street parking.
The resolution indicates it is inappropriate for Council to adopt a policy position of accepting
payments prior to undertaking a detailed review of the issue and, in the interim, each
development application must be assessed on merit.
Since Council currently does not have an adopted plan for infrastructure spending (or similar) for
parking contributions, it is problematic to continue to increase parking demand without identified
ways to invest in offsets. However, it is considered some factors exist in favour of this
application, being:



                                                                                        Page 24 of 155

Section 25

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 19 AUGUST 2014


    The application was lodged with Sunshine Coast Council in March 2013 when PSP13 was
      still in place and the applicant subsequently agreed to pay parking contributions in good
      faith.
    The Hastings Street area is generally considered a primary location for future delivery of
      new public transport infrastructure and/or programmes to deliver transport mode shifts
      away from private cars. Some known opportunity exists to deliver new infrastructure (such
      as upgrades to the local transit hub) and Council is currently investigating others (electric
      bus network).
    The majority of the new use areas, associated with the chemist and Aromas, are already
      being used without apparent significant parking impacts.
    Council has historically encouraged outdoor dining on Hastings Street, where appropriate,
      with those areas being a major contributor to the street’s character and vitality.
It is recommended that contributions in lieu of parking provision are accepted for this application.
In the short term, it is considered that the Hastings Street precinct will not be unacceptably
impacted by the potential increased parking demand and, in the longer term, the funds are
expected to be able to be directed toward projects that will deliver real offsets.
Landscaping
The 22m2 utility area expansion at the rear of Unit 6 involves the loss of a garden bed originally
approved in this area. The expanded outdoor dining areas are also proposed in what were
previously considered as hard landscaped areas on the site (i.e. paved). The applicant submits
that a large green wall erected along an approximately 40m length of the courtyard walls and
totalling 110m2 in area (see Figure 8 below) adequately offsets the expanding use areas’ impacts
on landscaping.




                  Figure 8 – New Green Wall to Courtyard Between Units 6 & 7
The small area of softscaping being lost at the rear of Unit 6 is not considered to contribute
significantly to the landscaping on the site and the provision of the green wall is supported,
subject to a condition that it be maintained.
3.4   Changes to Conditions
The requested changes will require some minor amendments to conditions of the existing
approvals, with the amended conditions listed in the recommendation.


                                                                                   Page 25 of 155

Section 26

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    19 AUGUST 2014


4       CONSULTATION
4.1     External Consultation
The draft Infrastructure Agreement was reviewed by Sunshine Coast Council’s Solicitor, Graham
Philips, in 2013.
4.2     Internal Consultation
The application was referred to Council’s Infrastructure Charges Officer for comment and
discussed with Council’s Coordinator - Project Design & Delivery.
5       CONCLUSION
The proposed expansion of use areas on the site raises some planning concerns because the
development is unable to provide additional parking spaces to meet the potential demand
increase the additional areas will create. The application was lodged at a time when Council’s
Planning Scheme Policy to accept contributions in lieu of parking provision for development in
Hastings Street was still in place. This Policy is no longer in place but it is considered that there
are grounds to accept contributions for this application.

Internal Consultation

Departments/Sections Consulted:

      Community Services                        X   Planning & Infrastructure
      Disaster Management & Public Order            Building & Plumbing Services
      Waste & Environmental Health                  DA Planning
      Community Facilities                          Strategic Land Use Planning
      Cultural Facilities                           Asset Design & Investigations
                                                    Asset Planning
                                                    Civil Operations
                                                    Environment

      Executive Office                              Corporate Services
      Community Engagement                          Finance
      Customer Service                              ICT
      Executive Support                             Procurement & Fleet
      Governance                                    Property & Facilities
      Human Resources                               Revenue Services




                                                                                      Page 26 of 155

Section 27

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014


                                                                      ATTACHMENT 1




                                                     Page 27 of 155

a        .
               *
        LE                                                                                                                   HASTINGS                      STREET
          hs
                                                                                                                             re cnn                                                                                                      a ee

                                     PROPOSED EXCLUSIVE
                                     USE AREA (19m?)
                     A                                                                                                                                              =               .|.|=—r—
                        SS                           :          tp                        o                         o                                                        ee                                              ee
                        a                                                                                                                                                    |      | eevee
                         See                                                                                                                                                 ee                        ARBAeey
                         pS                                                                                                                                                        SS Se
                             eer                                                                                                                                        WATER | foe bess
                         Sees                                                                                                                                          FEATURE | |p                                                          8
                        Poi                                                                                                                                                         ee
                      EXCLUSIVE                                                                                                                                                   ES
                       USE AREA 1                                                                                                 COMMON PROPERTY                   f               Sos                                                  SPIZO366
                    ee                                                                                                              CTS "LAGUNA ON                                       ee                                                                        9
                   ES                                                                                                              HASTINGS ARCADE”                 |                eS eS
                                                                                                                                       (SP120366)                                    —                                                                            ay
                                           /                                 e                                                                                                      -                             7
                                                                        SPIZ0366                                                                                    \               eee
                                      Same                                                             3                                PROPOSED EXCLUSIVE          _|                       Ss               lal
                                                                                                 SPI20366                                   USE AREA (56m?)         |           fe
                                                                                                                                                                be                  ae
                                                                                                                                                                            t       eS
                                                                                                                                                                            t       Reese saan
                                                                                                                                                                            f       peteemceceenoears
                                                                                                                                                                            i       Pasa
                      \                                                                                                                                                    OS                                                                                                 o
                       \                                                                                         4                                                             |     mi                     | PROPOSED VERTICAL GREEN WALL
                       ,                                                                                                                                                WATER                               | (30m?)
                                                                                                            SPIZOH66                                                   aaa)                                 |
                                                                                                                                                                     L            we eee ee ee ee ee
                                                                                                                                                                                    =                                              ee errr                                 |
                                                                                                                                                                                }                            EXCLUSIVE USE                  Peet             EXCLUSIVE |)
                                                                                                                      eae                                                       a                            AREA 6A                        EXCLUSIVE,       USE AREA
                                                                                                                                                                                 ‘a                                                          Se                (76m?)
                                                                                                                                                                                                                6                             BREA OH
                                                                                                                                                                                                         snes                                           7                   |
                                                                                                                                                                                                                                                        ee,
                                                                                                                                                        PROPOSED EXCLUSIVE                                                                   ee                             |
                                                                                                                                                        USE AREA — UTILITY           _“                                          |               ee
                                                                                                                                                                SPACE (22m?)          \                                    aa                 —_                                Fe
                                                                                                                                                                                                             ines 00038
                                                                                                                                                     PROPOSED OPENING IN                _\\\\
                                                                                                                                                               EXISTING WALL

    IMPORTANT NOTE:                                                                                                                                                                                                                             .
    This plan was prepared for Never Holdings Pty Ltd as a proposal plan to accompany a                                                                                                                                                Scale 1:200 - Metres.
    development application to Sunshine Coast Regional Council and should not be used for any                                                                                                  ae                                                 ——                                      —eey
    other purpose. The dimensions, areas and total number of lots shown hereon are subject to                                                                                             10                                    0                                     10                                   20
    the issue of all relevant development permits by Sunshine Coas Regional Council; a field
    survey by a Consulting Cadastral Surveyor and also any additional requirements of Sunshine                                                                                    a                                         s                                   #
    Coast Regional Council and any other authority which may have requirements under any                                                                R.P.D                           .      DEVELOPMENT                ow           PROJECT                      uy
    relevant legislation. In particular, no reliance should be placed on the the information on this             S            eens                                                 a           [oe                            #          Ou
    plan for any financial dealings involving the land. This note is an integral part of this plan.                         Boba
                                                                                              .                                 eee                    Lot 1, 6 & 7 on SP120366
    Boundaries of Building Format Lots 1-3, 6-9 are the centreline of walls (not defined by                                 Ph: 07 54555425. “ser                                                                                      Proposed Additional Exclusive Use     Scale:           Date:
   Boundaries of Building Format Lots 1-3, 6-9 are the centreline of walls (not defined by                                     :                                 ;                                                                                                                :              ,
    dimensions) and have been plotted by scaling from SP120366 only.                            martoo                      Fax: 07 54555725            8-32 Hastings Street,                                                         Areas                                   1:200 (A3)      29/01/201
                                                                                                         Ii                 symp:                       NOOSA HEADS
    Boundaries of existing exclusive use areas have been plotted from sketch plan “B" contained in consu   Ing a             38 Nash Street                                                                                           Applicant:                              Drawn By:
    the Community Managemant Statement for the "Laguna on Hastings Arcade" Community Titling                ply Itd         P.O, Box 391                Local Authority:                                                               Never Holdings Pty Ltd                 LM - MARTOO CONSULTING
    Scheme. As the dimensions on the sketch are related to building elements which have been    town planners +             Sab ately                   SUNSHINE COAST
    altered this the sketch was prepared, the outline of the exclusive use areas is approximate only urban designers        Fax: 07 54824952            REGIONAL COUNCE.                                                               oe                                     Rolerence Na:       ShastNoz
                                                                                                + surveyors                                                                                                                            Proposal Plan                         D-C01376-01-B        2of2

Section 28

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                19 AUGUST 2014



4                         REQUEST TO CHANGE EXISTING DEVELOPMENT APPROVAL & EXTENSION TO
                          RELEVANT PERIOD FOR A DEVELOPMENT PERMIT TO RECONFIGURE A LOT - 1
                          INTO 2 LOTS AT 1270 MCKINNON DRIVE, RINGTAIL CREEK
DOCUMENT IN FOR MATI ON




Author                            Senior Development Planner, Denis Wallace
                                  Planning & Infrastructure Department

Index                             ECM/ Application/ 152006.862.02

Attachments                       1.   Approved Subdivision Plan
                                  2.   Approved Material Change of Use Plan



         APPLICATION DETAILS

         Applicant                           Mr J Franz

         Proposal                            Request to Change Existing Development Approval and Extension to
                                             Relevant Period

         Original Approval Type              Development Permit to Reconfigure a Lot – 1 into 2 Lots

         Properly Made Date                  24/4/2014


         PROPERTY DETAILS

         Property Address                    1270 McKinnon Drive, Ringtail Creek Qld 4565

         RP Description                      Lot 26 SP 1047068

         Existing Use of Land                Vacant


         STATUTORY DETAILS

         SEQRP Designation                   Urban Footprint

         Locality                            Cooroibah

         Zone                                Rural

         Assessment Type                     Permissible Change to Existing Approvals




                                                                                                   Page 28 of 155

Section 29

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  19 AUGUST 2014


RECOMMENDATION
That Council note the report by the Senior Development Planner to the Planning & Organisation
Committee Meeting dated 19 August 2014 and approve the request to change a development
approval and extend the relevant period of Application No. 152006.862.02 (06/0862) situated at
1270 McKinnon Drive, Ringtail Creek in accordance with the following:
A.    Delete Conditions 11 and 13.
B.    Amend Conditions 10 & 29 to read as follows:
      10.   Prior to endorsement of the plan of survey by Council, a metes and bounds plan shall
            be submitted to Council indicating the house site and effluent disposal area/s on Lot 1
            and Lot 2.
      29.   Refer to the Department of Natural Resources and Mines’ conditions included as
            Attachment 1 in the Department of State Development, Infrastructure and Planning’s
            letter dated 6 June 2014.
C.    Delete the requirement for a further Development Permit for Operational Works –
      Landscaping.
D.    Agree to extend the relevant period by 4 months to 12 September 2014 and change
      Condition 2 accordingly.



REPORT
1.    PROPOSAL
The application seeks approval to change conditions of approval and extend the relevant period
of the 1 into 2 lot subdivision. The applicant requests:
    Changes to conditions 10, 11, 13 and 29 of the approval that applicant submits are not
      required or are in conflict with a later Material Change of Use approval for a detached
      house issued for the site; and
    Extension to the relevant period of the approval by 4 months.
In support of the changes the applicant’s consultant submits:
The applicant has been progressing with the subdivision approval (2006/862), has lodged an
application for operational works, received approval and paid the relevant bond. However,
following approval of the subdivision approval Council notified the applicant that the Development
Approval for the dwelling (MCU11/0204) was not consistent with conditions of the subdivision
approval. In this regard the conditions of the subdivision approval state that the locations of future
dwellings are to be outside the mapped Remnant Vegetation, whereas the Material Change of
Use approval approves a dwelling within the mapped vegetation area.
The applicant also requests an extension of the currency period for a further four (4) months
based on the following.
    The applicant has been progressing with subdivision approval as evidenced by the
      submission and subsequent approval of the relevant operational works application for the
      development;
    The site was listed for possible purchase by Sunshine Coast and the applicant delayed the
      commencement of the subdivision waiting for confirmation of Council purchase before
      proceeding with the subdivision. The new Noosa Council advised that they were not
      interested in purchasing the site and hence the applicant has proceeded with the
      development;



                                                                                     Page 29 of 155

Section 30

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 19 AUGUST 2014


    The extension of time is required to overcome an inconsistency of conditions associated
      with the subdivision and the later Material Change of Use application for a dwelling;
    The additional time is required to enable State agencies to comment on the requested
      changes to conditions.
    The subdivision is consistent with the form of development in the area and represents a
      logical extension to Riverpark Drive.
2.    BACKGROUND
The original application was made in 2006 under the Superseded Planning Scheme and sought
to subdivide 2 lots into 6 lots. Following a lengthy assessment process, negotiation by the
applicant with a State agency and amendments to the proposal, a Development Permit to
Reconfigure a Lot – 1 Lot into 2 Lots was issued on 22/3/2010 and took effect on 17/5/2010 with
the issue of a Negotiated Decision Notice. The approved lots are 5.6ha and 56.6ha in size,
shown as Lot 1 and Lot 2 respectively on the approved plan at Attachment 1.
In December 2011, Council issued a separate Material Change of Use approval (MCU11/0204)
for a dwelling house on the site within a 2,000m 2 cleared area of the site, approximately 450m
from the riverbank. The approved plan for that development is included as Attachment 2.
3.    STATUTORY PROCESS
Request to Change Conditions of Existing Approval
The applicant has requested to make a permissible change to a development approval under
s369 of the Sustainable Planning Act 2009. A request to change a development approval under
s369 can only be made in circumstances where that change would constitute a ‘permissible
change’.
The proposed change to the development approval requested by the applicant is considered to
constitute a permissible change on grounds that:
    The changes to conditions will not result in a substantially different development because
      they align with the existing development approval for a material change of use;
    The change would not require the application to be referred to additional concurrence
      agencies;
    The original application was code assessable and the change would not cause the
      application to become impact assessable;
    The change would not cause the approval to involve prohibited development.
On this basis, the applicant has followed lawful process in making a request under s369 of the
Act.
Extension to Relevant Period
Section 388 of the Sustainable Planning Act 2009 applies to requests to extend the relevant
period, it states that in deciding a request the assessment manager must only have regard to:
(a)   the consistency of the approval, including its conditions, with current laws and policies
      applying to the development, including, for example, the amount and type of infrastructure
      contributions, or infrastructure charges payable under an infrastructure charges schedule;
(b)   the community’s current awareness of the development approval; and
(c)   whether, if the request were refused-
      (i)    further rights to make a submission may be available for a further development
            application; and
      (ii)   the likely extent to which those rights may be exercised; and
(d)   the views of any concurrence agency for the approval.
Details of the assessment against these provisions are provided later in this report.


                                                                                   Page 30 of 155

Section 31

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               19 AUGUST 2014


4.    ASSESSMENT
Details and assessment of the requested changes to the existing conditions are provided below.
Conditions 10 & 11 – House Site Areas
10.   Prior to endorsement of the plan of survey by Council, a metes and bounds plan shall be
      submitted to Council indicating the house site and effluent disposal area/s on Lot 1 and Lot
      2. The house site and effluent disposal area shall be located on areas outside the Coastal
      Management District, Remnant Vegetation and a 40m buffer from the Remnant Vegetation
      as identified by the Department of Environment and Resource Management (DERM)
      reference IC0706NAM0013 and DERM-Ecoaccess Permit number: IPCC01443109.
11.   There shall be no buildings, structures or civil works (eg earthworks, dams, levies,
      driveways) within the Coastal Management District, Remnant Vegetation and the 40m
      buffer from the Remnant Vegetation as identified by the Department of Environment and
      Resource Management (DERM) reference IC0706NAM0013 and DERM -Ecoaccess
      Permit number: IPCC01443109 or any environmental covenant created on this site.
Applicant’s Request
The applicant seeks deletion of the conditions due to their conflict with MCU11/0204 for a
dwelling which was approved by Council, issued after the subdivision approval and permits a
dwelling within the Remnant Vegetation. The condition is therefore inconsistent with the later
approval and should be deleted.
Assessment
It is agreed that the conditions conflict with the subsequently issued Material Change of Use
approval for a house on the site. The conditions were also generally redundant at the time of
issue because they reference concurrence agency conditions that apply to the approval. The
State and Assessment Referral Agency (SARA) has now amended its conditions through this
application process and removed these requirements.
Condition 11 can be deleted and it is recommended that condition 10 be simplified to read as
follows:
10.   Prior to endorsement of the plan of survey by Council, a metes and bounds plan shall be
      submitted to Council indicating the house site and effluent disposal area/s on Lot 1 and Lot
      2.
Condition 13 – Rehabilitation of Coastal Management District
13.   Prior to any works commencing on the site, an Operational Works (Landscaping)
      application is required, and is to be approved by Council. The plan is for the Vegetation
      Management and Rehabilitation of the Coastal Management District. The rehabilitation plan
      shall include the following:
      13.1 A revegetation layout on A3 plans at a scale of no greater than 1:500, including a
           scale on the plan;
      13.2 A species palette incorporating the species selection of only native indigenous
           species;
      13.3 Maintained free of grazing animals using appropriate fauna friendly fencing;
      13.4 The removal of barbed wire from all fences within or on the boundary of the covenant;
      13.5 Peg the boundary of the covenant area with durable posts at least every 10m with A4
           signs stating “Covenant Boundary, Coastal Management District Area”




                                                                                  Page 31 of 155

Section 32

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                19 AUGUST 2014


      13.6 All Class 1, Class 2 and Class 3 pest plants declared under the Land Protection (Pest
           and Stock Route Management) Act 2002 and including all Camphor Laurel trees on
           the property are to be controlled on the site prior to Council endorsement of the Plan
           of Survey. In this context “controlled” shall mean, for class 1 and 2 pests, completely
           eradicated. For class 3 pests it shall mean removal of the plants where they threaten
           environmentally significant areas of the site such as riparian zones and areas of
           natural vegetation.
           Where class 3 plants are removed as a result of this condition and there is not
           sufficient natural regeneration of native species, the areas shall be replanted with
           endemic native species so that a sustainable natural ecosystem is restored.
           Council’s Environment and Landscaping Unit will not inspect the site until 30 days
           after the weed treatment and replanting is complete
      13.7 Near to equal numbers of appropriate species to be used within the relevant
           revegetation areas of the buffer so that one species of plant is not over or under
           represented on the site;
      13.8 The species densities of at least:
            Sedges, macrophytes and grasses at 0.5 metres centres;
            Shrubs at 1.5 metre centres; and
            Trees at 1.5 metre centres for those species four metres from the boundary of
              rehabilitation works for weed exclusion purposes and 2 metre centres for species
              further from the edge;
      13.9 Measurable and achievable criteria on which the performance of the floristic and
           structural component of the re-vegetation strategy can be assessed annually over
           three years, including no weeds on the entire covenant area for all of the 3 years and
           at the end of the re-vegetation period; and
      13.10 Nominate a total bond amount of 1.5 times the schedule of works estimate of costs
           (plus GST) for the re-vegetation works, including maintenance for three years. This
           plan must also nominate triggers for the release of this bond at 10% for the first year,
           10% for the second year, and 80% in the final year.
Applicant’s Request
The applicant requests deletion of the requirement as the Coastal Management District of the site
is in good condition and does not need any revegetation or rehabilitation. The area is currently
fenced and is in its natural state and there is no need for any further works. The condition is
therefore superfluous, not relevant and should be deleted.
Assessment
The applicant’s submission regarding this area is generally agreed with.            The Coastal
Management District Area is low-lying land (predominantly salt marsh) subject to tidal inundation.
Extensive landscaping works are not considered a reasonable imposition for a 1 into 2 lot
subdivision, particularly since no new property boundaries are proposed through the area.
Condition 29
29.   Refer to the Department of Environment and Resource Management conditions in their
      letter dated 10 February 2010.
Applicant’s Request
The condition is requested to be modified in accordance with anticipated changes from the
relevant referral agencies.




                                                                                   Page 32 of 155

Section 33

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               19 AUGUST 2014


Assessment
Agreed. A response was received from SARA on 6 June 2014 which agrees to the requested
changes to the concurrence agency conditions and the condition can be modified accordingly.


Extension to Relevant Period
The applicant requests an extension of 4 months to the relevant period. An assessment against
the relevant aspects of Section 388 of the SPA is provided below.
Consistency with Current Laws and Policies
The development raises some significant conflicts with current planning instruments. The
approved subdivision proceeded under transitional provisions of the South East Queensland
Regional Plan (SEQRP) (Division 3 (5.3.d) of the 2005-2026 Plan). The site was zoned Rural
Settlement and Open Space Conservation under the Superseded Planning Scheme for Noosa,
which allowed for the subdivision.
The site is in the Regional Landscape & Rural Production Area of the SEQRP and would not be
able to be subdivided if the application were remade. The site is also now zoned Rural under The
Noosa Plan, which does not allow for subdivision of the site. These are substantial conflicts with
primary planning instruments and would normally preclude approval of extension to the currency
period of the approval. However, the following are considered to be grounds in favour of the
request:
   The applicant has taken steps to complete its obligations under the approval and is very
     close to finalising plan sealing (i.e. a matter of days).
   The applicant has obtained an operational works approval required for access/driveway
     works and completed those works.
   The extension will allow time for State agencies to respond to the requested changes to
     conditions of the approval that were made prior to the lapsing date.
   Given 8 years has elapsed from the time of lodgement of the original application, the
     requested 4 month extension is a minor extension that will allow completion of the
     development.
   The completed development will result in 1 additional rural lot of 56ha, which will remain
     consistent with the rural character of the area and will not negatively impact on existing
     residents in the area or cause unacceptable planning outcomes.
The development has also been considered against the provisions of the new Single State
Planning Policy and does not raise any significant new conflicts in that regard.
Infrastructure Charges
On 6 February 2014, Council resolved that in determining applications to extend the relevant
period of approval, Council will require payment of additional contributions via an Infrastructure
Agreement for Trunk Infrastructure Networks not previously applied to the existing approval (but
limited to the maximum Adopted Infrastructure Charge amount).
Under the provisions of the existing approval infrastructure contributions have not been required
for the following relevant networks:
 Transport
 Stormwater
These networks are now applicable to the proposed development. An infrastructure agreement
was drafted for the additional network charges in order for the approval to remain consistent with
current laws and policies applying to the development. The applicant agreed to enter into an
Infrastructure Agreement and provided the signed document on 6 August 2014.

                                                                                  Page 33 of 155

Section 34

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 19 AUGUST 2014


Community Awareness and Likelihood of Submissions
The original application was code assessable and not subject to public notification. Subdivision
under The Noosa Plan remains code assessable and this application, therefore, does not raise
concerns with community awareness or submission rights tests under the Act.
Concurrence Agency Views
The applicant referred the application to SARA to seek its assessment of changes to
concurrence agency conditions and the extension to the relevant period. SARA’s response
dated 26 May 2014 states it has no objection to the extension to the currency period.


5.     CONCLUSION
The proposed extension to an existing development permit for a rural subdivision granted in 2010
raises some planning concerns because the development would be unlikely to be approved
under current planning provisions. Despite this, the 4 month extension sought is considered
relatively minor and there are grounds in favour of the extension.

Internal Consultation

Departments/Sections Consulted:

     Community Services                      x   Planning & Infrastructure
     Disaster Management & Public Order          Building & Plumbing Services
     Waste & Environmental Health                DA Planning
     Community Facilities                        Strategic Land Use Planning
     Cultural Facilities                         Asset Design & Investigations
                                                 Asset Planning
                                                 Civil Operations
                                                 Environment

     Executive Office                            Corporate Services
     Community Engagement                        Finance
     Customer Service                            ICT
     Executive Support                           Procurement & Fleet
     Governance                                  Property & Facilities
     Human Resources                             Revenue Services




                                                                                   Page 34 of 155

Section 35

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014


APPROVED PLAN OF SUBDIVISION (1 INTO 2 LOTS)
                                                    ATTACHMENT 1




                                                     Page 35 of 155

Section 36

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA              19 AUGUST 2014


APPROVED MCU PLAN WITH ALTERNATE HOUSE SITE ON FUTURE LOT 2    ATTACHMENT 2




                                                                Page 36 of 155

Section 37

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                19 AUGUST 2014


5                         LEGISLATIVE AMENDMENTS TO TRUNK INFRASTRUCTURE PLAN AND CHARGES
DOCUMENT IN FOR MATI ON




Author                               Infrastructure Assessment Officer, Oddbjorn Ludvigsen
                                     Planning & Infrastructure Department

Index                                ECM/ Subject/ 66.02 - Infrastructure Charges Instruments & Policy
                                     (Council/State)

Attachments                          Nil


EXECUTIVE SUMMARY
The Adopted Infrastructure Charges regime commenced on 1 July 2011 and replaced all
previous contributions and charges regimes applying to new development. The State
Government’s recent review of the adopted infrastructure charges regime and priority
infrastructure planning introduced amendments to the Sustainable Planning Act 2009 that
commenced on 4 July 2014.

This report provides Council with a summary of the major changes and the subsequent actions
required to be undertaken to satisfy the amended legislation.

RECOMMENDATION
That Council note the report by the Infrastructure Assessment Officer to the Planning &
Organisation Committee Meeting dated 19 August 2014 and:
A.                        Resolve to undertake an amendment to the Priority Infrastructure Plan in accordance with
                          the recent amendments to the Sustainable Planning Act 2009 and corresponding new
                          Statutory Guideline 03/14;
B.                        Request staff to prepare an amendment to Council’s Infrastructure Charges to satisfy the
                          Sustainable Planning Act 2009 for presentation to a future Council meeting; and
C.                        Request the Chief Executive Officer to negotiate with Unitywater regarding a simplified
                          infrastructure “charges breakup” agreement applying a weighted average demand
                          approach for inclusion in the future amendment to Council’s Infrastructure Charges.



REPORT
The State Government’s review of “trunk” infrastructure planning and infrastructure charges has
been an ongoing process for many years. Adopted Infrastructure Charges commenced on 1 July
2011 as a temporary measure replacing all former Council infrastructure contributions policies
and infrastructure charges plans applying to new development. It was intended that further State
Government reviews would provide a new and long term infrastructure charges regime to be in
place by 1 July 2014.

The “Sustainable Planning (Infrastructure Charges) and Other Legislation Amendment Bill 2014”
was released for a limited consultation period in May 2014 and Council provided a
comprehensive submission to the State on 15 May 2014. Some changes were made to the Bill
before being passed by Parliament on 19 June 2014 as the “Sustainable Planning (Infrastructure
Charges) and Other Legislation Amendment Act 2014” with the amendments to the “Sustainable
Planning Act 2009” (SPA) having commenced on 4 July 2014.




                                                                                                   Page 37 of 155

Section 38

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 19 AUGUST 2014


Due to the transitional provisions of the Act, Council has some time to amend its current Adopted
Infrastructure Charges Resolution and Priority Infrastructure Plan to comply with the legislative
amendments. However, the Act overrides any inconsistencies that may now exist regarding
infrastructure charges issued from 4 July 2014.

The planning and charging framework for trunk infrastructure has primarily maintained the current
“capped” adopted charges philosophy, but has brought about some substantial changes in
relation to the definition of trunk infrastructure, valuing of infrastructure, providing offsets and
refunds for constructed infrastructure, converting non-trunk to trunk infrastructure and calculation
of the permissible maximum charge. Many of these items are also subject to compliance with
new Statutory Guidelines.

The major changes, impacts and subsequent actions required to be undertaken by Council to
satisfy the amended legislation is provided as follows:

1.   Continuation of Capped Infrastructure Charges Regime

The existing State Planning Regulatory Provision (adopted charges) dated 1 July 2012 (SPRP),
will continue to be the SPRP (adopted charges) instrument under the transitional provisions of
the amended Act. However, while the current SPRP sets the maximum amount used for
calculating an adopted infrastructure charge this has remained basically unchanged, the
legislative amendments have now stipulated that the permissible maximum charge may only be
issued for additional demand caused by the development.

In working out additional demand, the legislation now specifically excludes an existing lawful use
that is taking place on a premise. It also excludes any use that was lawful but is no longer taking
place and has no time limit as to when this use previously existed or whether any previous
infrastructure contributions were ever made. This consideration was previously at Council’s
discretion which enabled some indexation to occur. This legislative change means that for
infrastructure charges issued from 4 July 2014, indexation of the charge is now solely limited to
the Ministers future decision. It also means that a credit for a previous use must be included even
if no previous contributions were made.

For example, under Council’s resolution, the adopted infrastructure charge applicable for a 2 x 3
bedroom duplex for a development approval issued up to 3 July 2014 would be $29,875 at CPI
March 2014 and subject to indexation until paid. In contrast, approvals issued from 4 July 2014
onwards, the maximum infrastructure charge permitted reverts back to the July 2011 unindexed
amount of $28,000 and is only subject to indexation to the payment date if decided by the
Minister.

2.   PIP to LGIP

The infrastructure planning instrument required to form part of Council’s planning scheme has
changed from a Priority Infrastructure Plan (PIP) to a Local Government Infrastructure Plan
(LGIP). There is no immediate requirement for a Council to prepare an LGIP, but under the
transitional provisions of the Act, this document is required to be in place by 1 July 2016.

A LGIP’s relevance to Council infrastructure conditioning powers for development approvals
remains unchanged as for a PIP. However, changes have been introduced in relation to the
contents of a LGIP relating to trunk infrastructure and in determining its value.

Under the transitional provisions of the Act, Council’s current PIP becomes a LGIP. Although the
day the PIP was included in the planning scheme determines when the LGIP is required to be
reviewed (i.e. every 5 years), an amendment must still be made to it by 1 July 2016 to fully
comply with the new LGIP requirements under the Ministerial guideline under the prescribed
regulation. Failure to do so will limit Council’s infrastructure conditioning and charging powers.

                                                                                   Page 38 of 155

Section 39

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 19 AUGUST 2014


The Statutory guideline 03/14 “Local government infrastructure plans” was only just released in
late July 2014 and an amendment to a PIP will require a full review process to be undertaken
rather than that of an interim amendment. The review process for an LGIP amendment is
summarised as follows:




It should also be noted that the new process will require Council to engage and pay for an
external consultant’s review and approval prior to undergoing the Minister’s review and approval.
At the current time, the State Government’s panel of approved reviewers is not yet available.

As the current PIP has its base date at June 2006, it means that the amendment will also require
reviews to update the supporting infrastructure planning documentation that underpinned the PIP
to the current time. Many of the reviews required in relation to the transport network, public parks,
community infrastructure and infrastructure asset valuations have already commenced or will
commence by the respective Council branches. While there are no changes planned to the
density provisions of the planning scheme, an update of the population and development data
will also need to address more recent census data and projection requirements.

3.    Infrastructure Charges Resolution

Since 1 July 2011 infrastructure charges have been levied through Council’s adopted
infrastructure charges resolution. The Act continues with that general framework but the
resolution is now called a charges resolution.

Under the transitional provisions in the Act, Council’s existing adopted infrastructure charges
resolution becomes a charges resolution and will continue in effect until 1 July 2015, unless
otherwise repealed. However, the Act overrides the current resolution to the extent of any
inconsistency or omission with the new requirements.

An amendment to the current resolution must be undertaken by 1 July 2015 to address these
inconsistencies and to comply with the new legislative requirements in order to continue issuing
infrastructure charges on development from that date. These requirements relate to calculation of
charges, automatic increase provision (indexation), offset and refunds, conversion applications
and valuing infrastructure.

The process for making a charges resolution have been simplified in that the Council only needs
to upload the resolution and maintain it on its website for it to take effect.

4.    Infrastructure Charges Notices (ICN)

Previously, the Act referred to a number of different notices such as an infrastructure charges
notice, a regulated infrastructure charges notice and an adopted infrastructure charges notice.
The only notice that is now issued by a Council following commencement of the legislative
amendments is an Infrastructure Charges Notice (ICN).

New matters to be incorporated in an ICN include how the infrastructure charge was determined,
any automatic increase provision and whether an offset or refund for constructed trunk
infrastructure applies. The ICN must also include an information notice that states the reasons for
the ICN and also outline rights of appeal. The relevant triggers for payment of the charge and the
‘negotiated’ charge procedure remain relatively unchanged.

                                                                                    Page 39 of 155

Section 40

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  19 AUGUST 2014


These amendments have resulted in Council’s charge notice increasing from 2 to 6 pages.

5.    Permissible Changes and Extension Approvals

The amended legislation now extends infrastructure charges to applications to change an
existing approval and to an extension of relevant period. However, the amendments are limited in
that they only allow for an amendment to a charge notice where one was previously issued on
the original approval.

No consideration has been made regarding applications which relate to old approvals that only
contained infrastructure contributions for limited or no infrastructure networks, and therefore the
current process will need to continue. This means:
 for applications to change an existing approval, continuation of those infrastructure
   contribution conditions applied in the original permit and capture missing networks through
   the building approval process if applicable; and
 for applications to extend the relevant period, continue Infrastructure Agreements to be
   entered for missing networks.

6.    Trunk Infrastructure Definition

An amendment has been made to the definition of ‘trunk infrastructure’. Previously, trunk
infrastructure was development infrastructure identified under a PIP or adopted infrastructure
charges resolution. If development infrastructure is not trunk infrastructure then it is by default
‘non-trunk infrastructure’.

Under the amended Act, trunk infrastructure is infrastructure identified in an LGIP and also
development infrastructure that, because of a conversion application (a new item explained
below), becomes trunk infrastructure. In addition, development infrastructure that is required to
be provided under a condition relating to delivery of necessary trunk infrastructure becomes trunk
infrastructure by definition.

7.    New Definition of Establishment Cost

The establishment cost for existing trunk infrastructure now means the current replacement cost
of the infrastructure as reflected in the relevant local government’s asset register, and the current
value of the land acquired for the infrastructure.

The establishment cost for future infrastructure includes all costs of land acquisition, financing,
and design and construction, for the infrastructure.

The methods for determining establishment costs must also comply with the Statutory guideline
03/14.

8.    Offsets and Refunds

The amended Act requires Council to specify in its infrastructure charges resolution the method
for working out the costs of trunk infrastructure that is conditioned to be provided by
development. Also, any offset is now required to be against the total charge issued and not
limited to a specific trunk network.

The offset & refund must now also be stated in the infrastructure charge notice (ICN) when first
issued, so in order to meet the timeframes required by the Integrated Development Assessment
System (IDAS), the PIP planned estimate will need to be the default amount used to determine
the establishment cost of the infrastructure item for the offset amount.

                                                                                    Page 40 of 155

Section 41

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  19 AUGUST 2014


An applicant who does not agree with the value of the establishment cost may, by notice, require
Council to use the method under the relevant charges resolution to recalculate the establishment
cost. The applicant’s notice must be given before the ICN becomes payable and Council must
amend the existing ICN as applicable. Therefore application of this section of the Act could be
made some time after the approval and original charge notice were first issued (i.e. when the
development nears completion which could be up to 4 or even more years later).

Council’s current resolution already includes a method for calculating offsets and refunds, but it
will need to be reviewed for compliance with the amended Act and Statutory Guideline 03/14.

9.    Conditions Relating to Infrastructure

Whilst most of the previous restrictions about imposing conditions continue, local governments
will no longer be able to impose a condition requiring an applicant to enter into an infrastructure
agreement. The conditioning power now also only relates to development applications and not
requests for compliance assessment.

For a condition about infrastructure, a decision notice for a development approval must now
include a reference to the provision of the Sustainable Planning Act 2009 (SPA) under which the
condition was imposed (i.e. to identify if the condition is about non-trunk or trunk infrastructure).

10.   Conversion Applications

Previously, trunk infrastructure was limited to infrastructure specified in a local government’s PIP.
The amendments to the Act have introduced a new mechanism whereby applicants may seek to
have non-trunk infrastructure converted to trunk and thereby gaining an offset or refund against
the infrastructure charge.

The ability to make a conversion application only exists if:
 a particular condition of a development approval requires non-trunk infrastructure to be
   provided, and
 the construction of the non-trunk infrastructure has not started.

Such an application must be in writing similarly as for offsets and could be made quite some time
after the approval and original charge notice were first issued.

Council’s criteria for deciding conversion applications must be included its charges resolution and
must be consistent with the criteria provided in the Statutory Guideline 03/14.

If the conversion application is approved then Council must amend the Decision Notice to identify
the works as trunk infrastructure and amend the Infrastructure Charge Notice to detail the offset
and refund applicable.

11.   Appeals

Appeals are available to both the Planning and Environment Court and the Building and
Development Dispute Resolution Committee.

The appeal rights about an issued infrastructure charge were previously limited to:
 the charge in the notice being so unreasonable that no reasonable relevant local government
   could have imposed it; and
 an error in the calculation of the charge.


                                                                                    Page 41 of 155

Section 42

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   19 AUGUST 2014


The amended Act provides that appeal rights exist for a decision which involve an error relating
to:
 the application of the relevant adopted charge
 the working out of the additional demand created by the proposed development, and
 an offset or refund;
 there is no decision made about an offset or refund;
 if an ICN specifies that a refund will be given, the timing for the giving of the refund; and
 in relation to the new conversion application process.
However, such appeals cannot be about:
 the adopted charge itself, or
 for a decision about an offset or refund:
      o    the establishment cost of infrastructure identified in an LGIP, or
      o    the cost of infrastructure decided using the method included in the Council’s charges
           resolution (where the method complies with the Minister’s Statutory guideline 03/14).

Appeals to the court may also be lodged against a building and development committee’s
decision but only relating to an error or mistake in law on the part of the committee, or that the
committee had no or exceeded its jurisdiction in making the decision.

12.       Infrastructure Agreements

The changes brought about by the amended Act for infrastructure agreements are largely
insignificant with the exception that a development approval condition can no longer require an
applicant to enter into an infrastructure agreement. The only other change is the requirement for
both Council and the relevant entity to negotiate the infrastructure agreement in good faith.

13.       State Infrastructure Providers

Local Function Charges on State controlled roads have now been removed from the legislation,
with a new provision included for a local government to reimburse a State infrastructure provider
if infrastructure is provided under a State-related condition and has replaced, or is to replace,
infrastructure, for which there has been, or is to be a levied charge by a local government and
provides the same desired standard of service as the replaced infrastructure.

With the exception of the above, the provisions relating to State infrastructure providers remain
largely unchanged and will continue to have powers to impose conditions on a development
approval about infrastructure and works to protect or maintain infrastructure operation.

14.       Distributor-Retailers

The amended Act also brings about a number of significant reforms to the South-East
Queensland Water (Distribution and Retail Restructuring) Act 2009 and Council has been briefed
in an earlier report by Planning & Environment, Manager in relation to the process changes
involved.

Previously, a charges apportionment agreement was required between Council and Unitywater
and this is maintained by the amended Act but translates to mean a breakup agreement for
adopted charges.


                                                                                      Page 42 of 155

Section 43

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               19 AUGUST 2014



The main change that commenced on 1 July 2014 is that Council no longer includes the Water
Supply and Sewerage components in its charge notice issued to the applicant. Instead, the
applicant will now be issued with 2 notices, one from Council and another from Unitywater in
relation the infrastructure network owned by the entity.

Although the current apportionment agreement continues as the breakup agreement, it was
originally anticipated that the adopted charges regime would only be short lived whereby charges
would eventually revert back to linking with the actual cost of providing trunk infrastructure for
each specific network.

The current charges apportionment (breakup) agreement is quite complicated having 12 different
apportionment percentages dependant on the development type and location together with 2
charge reductions (20% per network) should the development not be serviced with either Water
and/or Sewerage.

With the adopted charges system now continuing, and with separation of charge notices issued
by Council and Unitywater, a number of inconsistencies in charges pertaining to different areas
will become evident. For example, Council’s current charge pertaining to its networks for a 3
bedroom dwelling in different areas is shown in the following table:

                  Council Adopted Charge Component for a 3 bedroom dwelling
                                                                                 No Water or
           Location                  All networks         No Sewerage
                                                                                  Sewerage
 Coastal Area (excluding Marcus
                                       $17,920               $14,336
 & Peregian Beaches)
 Marcus & Peregian Beaches             $14,280               $11,424
                                                                                   $16,800
 Cooroy, Pomona                        $11,760                $9,408
 Cooran                                                       $9,408
 Boreen Point, Kin Kin

A suggestion is to simplify the apportionment to a whole of shire area basis using a PIP weighted
averaged demand approach to the 4 development categories according to development type only
and to do away with the reduction factor where Water and/or Sewerage is not supplied.




                                                                                  Page 43 of 155

Section 44

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                       19 AUGUST 2014


Initial calculations, would simplify the charges breakup as identified in the following table:

Table 10.2 (from Council’s current Adopted Infrastructure Charges Resolution)
                                                                                                                               Allocation of
                                                          Allocation of adopted infrastructure between the Council and           adopted




                                      ALLOCATION NUMBER
                                                                           the distributor-retailer (DR)                      infrastructure
                                                                                                                                charge for
                                                                                                                             residential and
                                                                                 Commercial                                  non-residential
                                                            Commercial
 Planning areas                                                                 (Office, Bulk              Industry         development not
                                                              (Retail)
                                                                              Goods, Showroom)                             otherwise specified
                                                                                                                               in column 3

                                                          NSC    Unitywater   NSC      Unitywater   NSC       Unitywater   NSC      Unitywater

                                                          (%)       (%)        (%)        (%)        (%)         (%)         (%)       (%)

           Cooroibah
           Cooroy & Lake MacDonald
           Mary River Catchment
                                         1                68%       32%        61%        39%        39%         61%        42%        58%
           Boreen Point, Kin Kin &
           Cootharaba
 Current




           Noosa North Shore
           Eastern Beaches
           (Sunshine/Sunrise/Castaw
           ays Beach)
                                         2                90%       10%        87%        13%        69%         31%        64%        36%
           Noosa Heads
           Noosaville
           Tewantin & Doonan
           Eastern Beaches
                                         3                85%       15%        80%        20%        60%         40%        51%        49%
           (Marcus/Peregian Beach)
 Proposed Amendment:                                      85%      15%        85%        15%        65%         35%         60%       40%
    All Noosa Areas

Under the above proposal, the infrastructure charge for Council networks for a 3 bedroom
dwelling would then become $16,800 across all areas of Noosa Shire and if not supplied with
Water and/or Sewerage, the development would then not be charged by Unitywater accordingly.

The proposed amendment for a change to the breakup agreement may only be included in an
amendment to Council’s Adopted Infrastructure Charges Resolution on agreement being reached
with Unitywater.

15.        Fair Value Charges and Co-Investment Program

The State Government has introduced a new “Priority Development Infrastructure Co-investment
Program” to encourage local governments to adopt alternative infrastructure charges on
development promoted as “fair value schedule of charges”. This scheme is not governed by the
amended legislation.

To be eligible for this co-investment program, local governments must adopt infrastructure
charges at or below the “fair value charges schedule” which is generally 10% lower for residential
developments and 15% lower for non-residential development than the current maximum
charges.

The scheme is to be managed by Economic Development Queensland who will work with local
governments, water distributor-retailers and developers to identify “Priority Development
Infrastructure” (PDI) projects that will generate or facilitate significant economic benefit through
growth in residential, retail, commercial and industrial developments. The key parameter for
assessing economic benefit is how much future investment does the delivery of the infrastructure
create and how quickly.




                                                                                                                           Page 44 of 155

Section 45

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 19 AUGUST 2014


Assessment may also include:
 the value of the development to be unlocked;
 the number of lots or non-residential gross floor area;
 does the PDI provide access to multiple land owners;
 does the PDI provide better utilisation of existing infrastructure;
 current market conditions and likelihood of investment occurring; and
 other community benefits e.g. existing environmental problems or reduction in travel time.
This scheme is promoted as a “co-investment program” that requires generally 10% to 50% of
the value of the infrastructure to be co-invested by a partner (Council or Distributor-retailer or a
developer) with the balance amount co-funded by the State Government. It is basically an
interest free loan that must be paid back 100% to the State over a timeframe of up to 15 years.

Recent advice from the Department is that local governments will not need to adopt the “fair
value charges” until such time that a co-funding agreement for the specified infrastructure is
reached. The Department has also advised it is prepared to brief local government Councillors in
more detail upon individual request.

On reviewing the scheme as presented by the Department of State Development, Infrastructure
and Planning, it is considered unlikely that Noosa would meet the current selection criteria unless
there was a change to the planning scheme to allow a significant increase in new development.

Previous Council Consideration

Nil.

Finance & Risk

If amendments are not made to Council’s current Adopted Infrastructure Charges Resolution by 1
July 2015 and its Priority Infrastructure Plan by 1 July 2016, Council will no longer be able to
impose conditions about trunk infrastructure or give an infrastructure charges notice for
development approvals.

Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

Preliminary consultation has been undertaken in relation to reviews proposed to the planning
scheme, future infrastructure planning documents and financial asset values with the following
sections:

     Strategic Land Use Planning
     Asset Design and Investigations
     Asset Planning
     Community Facilities
     Finance



                                                                                   Page 45 of 155

Section 46

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             19 AUGUST 2014


Departments/Sections Consulted:

X   Community Services                   X   Planning & Infrastructure
    Disaster Management & Public Order       Building & Plumbing Services
    Waste & Environmental Health             DA Planning
    Community Facilities                     Strategic Land Use Planning
    Cultural Facilities                      Asset Design & Investigations
                                             Asset Planning
                                             Civil Operations
                                             Environment

    Executive Office                     X   Corporate Services
    Community Engagement                     Finance
    Customer Service                         ICT
    Executive Support                        Procurement & Fleet
    Governance                               Property & Facilities
    Human Resources                          Revenue Services




                                                                               Page 46 of 155

Section 47

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                19 AUGUST 2014


6                         NATIONAL HERITAGE LISTING FOR THE COOLOOLA REGION
DOCUMENT IN FOR MATI ON




Author                               Environment Officer, Peter Milne
                                     Planning & Infrastructure Department

Index                                ECM/ Subject/ Environmental Management/ Natural Heritage Trust

Attachments                          1.   Map of Proposed Cooloola National Heritage Place




EXECUTIVE SUMMARY
Not applicable.

RECOMMENDATION
That Council note the report by the Environment Officer to the Planning and Organisation
Committee Meeting dated 19 August 2014 and resolve to authorise the Chief Executive Officer to
write to the Australian Heritage Council, advising of Noosa Council’s support for National
Heritage listing for the Cooloola Region, excluding the Noosa North Shore Beachfront Caravan
Park.


REPORT
In 2007, the Australian Heritage Council undertook an assessment of the Cooloola Region for
possible inclusion in the National Heritage List. At the same time owners and occupiers of the
place, including Noosa Council, and relevant Indigenous people, were invited to provide
comments on the proposal to the Heritage Council and the Minister for Environment. Because of
the time that has elapsed since seeking comments, the Minister for Environment is inviting
Council to provide any further comment on any issues that need to be considered with the
proposed National Heritage listing.

1.                        Background

The Australian Government Department of Environment is proposing that the Cooloola area, part
of Great Sandy Region, be listed as a National Heritage Place. The proposed Australian
Government listing acknowledges that the Cooloola area has natural and scenic values worthy of
national recognition.

The Australian Heritage Council advises that the Cooloola Region has been assessed as
meeting the following National Heritage criteria:

A.                        Events, processes, for its sand geomorphology, and its rivers, lakes and estuarine
                          waterways;
B.                        Rarity for Rainforests growing on sand;
C.                        Research into successional vegetation and the coastal dune chronosequence (i.e. a set of
                          vegetated sites that share similar attributes but are of different ages); and
D.                        Aesthetic characteristics.

In addition, the Heritage Council acknowledges that National Heritage listing would complement
the adjoining internationally recognised Fraser Island World Heritage Place.




                                                                                                  Page 47 of 155

Section 48

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                19 AUGUST 2014


2.    Scope of the proposed Cooloola National Heritage Place

The Cooloola National Heritage Place includes the following public lands (see Attachment 1:
Map):

   Great Sandy Straits
   Cooloola National Park
   Noosa North Shore Council Reserves
   Noosa North Shore Road Reserves
   Noosa North Shore Caravan Park
   Lake Cootharaba
   Lake Cooroibah
   The stretch of Noosa River in-between Lake Cootharaba and Lake Cooroibah
   A stretch of Noosa River below Lake Cooroibah to Tewantin
   Teewah Beach to low tide only.

Private land is excluded from the proposed Cooloola National Heritage area.

3.    Implications for Council

Under the Environment Protection & Biodiversity Conservation Act (Cth) (EPBC Act), approval
must be obtained from the Commonwealth Minister for the Environment before any action takes
place that could have a significant impact on the National Heritage values of a listed place. Under
the EPBC a significant action is where a National Heritage value could be lost, diminished or
destroyed. Council, or developers, need to refer any actions that are likely to have a significant
impact on the proposed Cooloola National Heritage Place to the Commonwealth. Examples of
significant actions include:

 Modification to a dune system for vehicle access
 Dredging of rivers and lakes
 Coastal engineering works and structures
 Roads or drainage construction through a rainforest
 Clearing of coastal dune vegetation
 A new campground or eco-tourism development
 A proposed phone tower
 A new commercial tourism venture
 A major upgrade of the Noosa North Shore Beachfront Campground
 A floating restaurant on a lake
 Water extraction
 Sand mining
 A new utility such as a power line or water infrastructure
 Developments that impact on the scenic landscape qualities of the Noosa River, sand dunes,
   forests and wetlands
 Widening of a road that impacts on endangered plant species or ecological communities

Under the EPBC Act, National Heritage Places are a Matter of National Environment Significance
(MNES). The Australian Government provides guidelines and information on the referral,
assessment and approval process for actions that may impact on a MNES.




                                                                                   Page 48 of 155

Section 49

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                19 AUGUST 2014


4.       Noosa North Shore Beachfront Campground

Internal consultation has highlighted that because the Noosa North Shore Beachfront
Campground, although retaining some natural and scenic values, is being used for recreational
purposes, some redevelopment or expansion may be appropriate in the future. Any proposed
development would require State assessment and approval. National Heritage listing would
require an additional level of assessment, and therefore it is proposed to exclude the Noosa
North Shore Caravan Park from within the boundaries of the National Heritage Place.


Previous Council Consideration

Nil.


Finance & Risk

Nil.


Consultation

External Consultation - Community & Stakeholder

Nil.

Internal Consultation

 Strategic Land Use Planning
 Asset Planning
 Property & Facilities

Departments/Sections Consulted:

       Community Services                   x   Planning & Infrastructure
       Disaster Management & Public Order       Building & Plumbing Services
       Waste & Environmental Health             DA Planning
       Community Facilities                     Strategic Land Use Planning
       Cultural Facilities                      Asset Design & Investigations
                                                Asset Planning
                                                Civil Operations
                                                Environment

       Executive Office                     x   Corporate Services
       Community Engagement                     Finance
       Customer Service                         ICT
       Executive Support                        Procurement & Fleet
       Governance                               Property & Facilities
       Human Resources                          Revenue Services




                                                                                  Page 49 of 155

Section 50

ATTACHMENT 1
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014




                                                    Page 50 of 155

¥            ff                                                    =,
  }          ((                                                         }                                                                            .
       NY                                                               (                                                       Cooloola Region
       Oo    v                                                          %
       eo   A                                                            ‘,
       ie   \                                                            }                                                     National Heritage List - Nominated place
        LF NX          ~~                                                                                                       Place ID: 105978
         \    \\          ee                                                )
                Wi                     a                                    j
                      i   » b                                             \    ,           ie          ae                            | AHC Assessed Boundary
                      !       K        |                                £                                      7                       National Park
                     !           TS |                                  oi
                     r  Ya           =                                s |                                                              Other Protected Area
                     i   y            fe           =|                S
                   ri)                fh              4             =~    y)                                                    |      Land Parcel
                        |      >      ¥                                                                                         [      Waterbody
                 —,                             |              '                                                                —--—+ Noosa Shire
                                                 |             .               Great
                bee                              |             ‘\              Sandy
                      ——                    CY                   \              NP                         i
          2                 i                 a                  }}                                       f
 Pe                       S                                                                              |
                   B “                                 & N           /  take  ,                        |
.——____         fo                                     \     \\  &    Cooloola                        |
———__.                                                   *     \          —                          {                          DRAFT — area under consideration
 —            {     SY                                        }     i\  ‘                             }                                                 ‘    "
   \                                         Great           \ \\   2       G
    \       ,                                Sandy             YC     A                             }                                                             7
    My                                         NP               \ Ny                                i                           o              2             4km h
“YY J                                                             TN    ‘                          }                                  a                    es |
    “—s                                                              )                             |                                     Scale:1:80,000
         /                          =A           ———              ay    f/f
        f             Banyan a         }      ; LY      es \N  fF       i                         J                             Data Sources
       ?                Creek } 5     Ss                   ai    vk                              |                              National Hertage Let Spatial Database (NHLSDB)
                        3      ———__                         SS    =    '                        |                              World Heritage An
Sy    :                                                   rs            SS.                      j                              ® Commonwealth of Australia
 SS                       4                                                x                    i                               Other data © PSMA
   VN      Eulama Creek _//                                                 y                   }                               Projection : Transverse Mercator
       eS.         LF                                                                           I                               Datum: GDA 1994 MGA Zone 56
             ee       ae                              we                      \                                                 Date: 11/07/2014
 :                    fR                        i                               \              |
                 PS                             q                               \              j                                              sme
  |   My     go <7 _08                   ;               —————                                                                            err
 |    PY oH tt                     noe      sf                                   }                                                      sf
 |    ,  SS   nie       4         I}   \\. ee                                     |          |
 bo              —                 SMG                                           \           |                                                               \
  |  } On eRe             |           fr                                         }           |                                                          ape’
  L  ASS                             f                                          f           |                                   ®
 pm     JOLLA            |         fi        |            om                     =X         {                                                                    q
 /    moh               rh         tg        |          Cootharaba                          f                                    ,
ee    {       =       |         \                                       ty                 i                                                              .  ~
    fe}                 fp      |           |                                  Excluded                                                                    :
     put] |      =     | ae  5 be,                                                   i)                                                                    es
    ET            |   |   rR                                            4             i                                             ¥                      oe
    fy -——~L              |       Aw                                   }             |                                                     oe
EAL             r     If —___ fay iy        |                                        |                                                   Avstralian Government
  AAI               RN         OAS                                                   |                                                    Department of the Environment
  BE           He          >’     Ay                                 /               I
 yn   JL  OStRE     _|—4                                                            {
 CS Li ——          pf                      |                                        {|
 \  ol               pa                               pr                            ;   |
Kk          KA     ASS                                f                             I   i
NN          }   > P-      y                          44                            I    |
NI           |   A>}                       |    a                        ee        I    |                                 Coral
 +   |     /               |               ——                       |         Sl                                            Sea
     ee                   “Vr             |      6|lCUWECT                         |   |
5    copay 7 ot      oJ       i! \ |      |      |      |      |   |               |   f
 L Wye                )     /  | SFR            [Noosa River  |   |                |   i
 LN AK]               ne       |            WF                |   LO              |
 Noms |               a                      hi           ==            ——|            |
Ys                   ABH           a        |                 | “y)                \   |
     JS            ge]                                   Ty                       MJ
                  BEA. ;                                  \  < ji——                 |  |    Noosa North Shore
                  Re        ies                            L fo    W      f         _   9)  Beachfront Campground
                  |                   Sthipe               |<     >       ==        —   9h  exclusion
                      Jee J                  AN                               |  \   Bl
                  I              ELMS                  —- 1      SBN     |    \ \
                /| god?      —— See,     Ran iOS                        \ I    \  \   Vay
                   ge      a       Be   BRO   AL        AS               Wy    OL      \\
         Iv}    ty        |   ERS ¥ AS sy. eas! f p                      Hf     \  \  \v \
    ~    |)     Q>— __ SS SSS 9                             Lake        r       \  \  VA
    | Lisle ——\      AES Saad = ST ES                     Cooroibah    Zr          Ne
               EONS eh                                               NPP                   \
   es         Be =| at        se All\ TRAK          \               yee         S      ctu
             i dopa ee BY Xt Ke —                                — ff J        t       77
               Ee              ei                 SP                   Ga
a                    DNS          eT                 Nw          «   Woes             ;    ie
‘ome =              Been             WE          CLE) wi             \ A             J        "IN
oN                   i       Se   FU                    E      ore   \Wr    i                  IN
BH |      a                  =:  ie Paes Oe                   yy        XS         gf        ope
 fi     |                SY   IO            cel /     MN    2-2                  —__a<                                   f
          |          .      tC Sor     Noe                    ee        )        (                                       fs
  1B     J     Tewantin    Na      forcpelic            S         I                          Vara  y               pad
 i,  Pea. ff     i                       =                          Ri    SB |            (1 \        nN        7,             i
RAG] |                                        eg,         | pene                   Ho             eed Sl                       S
 Oreo ||                  ES     ©       seed _ |                  Seas            Mg          pa      Coat
 =e ep 28 Si          ee ne a         7s #                = ae           h Pamaa, Noosa River pe Mea),  ipl em             Peas
= ft | oY a                                               eee)        "a ye           eyieaen (Po       Gael
 BT       Se             RE                  COS NS       eS        SS Bema ak                        Oise        kama
RVLN   TOR     RL LTT) | NORA            XS       | \ Reese            G7 NE         Pee         v9        BS  aa aaa)
BPS PSL"                  1 SAREE                           el  7      ait i     SOY          Ae.                        ee

                                                                                                                                        Page 50 of 155

Section 51

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                            19 AUGUST 2014


Strategic Land Use Planning

7                        PROPOSED AMENDMENTS TO THE NOOSA PLAN
OCUMENT IN FOR MATI ON




Author                             Senior Strategic Planner, Rowena Skinner
                                   Planning & Infrastructure Department

Index                              ECM/ Subject/ Noosa Plan Amendments;
                                   Project/ Noosa Plan 2014 Scheme Amendments

Attachments                        1.    Amendments to the Biodiversity Overlay
                                   2.    Proposed Zone Changes

                                   Hard copies of the proposed amendments have been provided in revision
                                   format in the Councillors’ room.


EXECUTIVE SUMMARY
This report brings forward various proposed amendments to the Noosa Plan - planning scheme
for the Shire of Noosa.

Proposed amendments have been drafted having consideration to submissions received during
preliminary consultation and advice from State Government agencies as well as internal review
of the plan and prior workshops with Councillors.

Changes that materially affect the rights of land owners such as the rezoning of private land,
extension of urban boundaries or amendments to density or subdivision potential have been
avoided in these amendments and are matters more appropriately left to the preparation of the
next planning scheme.

Proposed amendments affect all parts of the planning scheme and this report outlines
amendments on an issue basis rather than in order of appearance through the document. Minor
amendments of an editorial nature are not necessarily detailed in this report. Complete track-
change versions of the proposed amendments have been provided in the Councillors’ room.


RECOMMENDATION
That Council note the report by the Senior Strategic Planner to the Planning & Organisation
Committee Meeting dated 19 August 2014 and:
A.                       Resolve to amend the planning scheme for the Shire of Noosa in accordance with the
                         proposed amendments as outlined in that report; and
B.                       Request the Chief Executive Officer to write to the Minister for State Development,
                         Infrastructure and Planning requesting a State Interest Review of the proposed
                         amendments and the Minister’s approval for Council to commence public consultation on
                         the proposed amendments.




                                                                                               Page 51 of 155

Section 52

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 19 AUGUST 2014


REPORT
Proposed amendments to the planning scheme are designed to correct a number of anomalies,
reduce unnecessary regulation and reinforce the desired outcomes for Noosa Shire.

The proposed amendments have been drafted having regard to a number of references
including:
 The observations of Councillors and officers about current anomalies, shortfalls and over
   regulation with the current planning scheme;
 Submissions made to the draft Sunshine Coast planning scheme by residents of Noosa Shire
   in 2012;
 Submissions made during the preliminary consultation period in April/May 2014;
 State policy directions in the 2013 State Planning Policy and supporting guidelines;
 The Queensland Planning Provisions (QPP) being the State’s standard planning scheme
   provisions

Importantly, this process is not a comprehensive planning scheme review and matters relating to
the land use zoning of private property or the extent and density of urban development have
largely been deferred until work commences on a new planning scheme.

1.   Relationship between the Planning Scheme and State Legislation/Regulation

It is proposed to include statements that explain the relationship between the planning scheme
and the State planning legislation. The planning scheme was written under, and complies with,
the repealed Integrated Planning Act (IPA). Currently the relevant planning legislation for
Queensland is the Sustainable Planning Act (SPA) however by the time these amendments
would be in force the SPA is likely to have been replaced by the Planning and Development Act
which is currently in a consultation period as a draft bill.

Provisions addressing building work regulated under the planning scheme need replacement as
they do not correctly address the relationship between the planning scheme, the Building Act and
the Queensland Development Code. A new section 2.9 is proposed to be included in Part 2 –
Interpretation (taken directly from the QPP) and the section in each locality plan addressing
Alternative Provisions to the QDC is proposed to be deleted. Minor amendments to the
Detached House Code and the Building Works Code are proposed to explain which provisions
are alternative provisions to the QDC.


2.   Desired higher level outcomes for Noosa Shire and the places within Noosa Shire

To clearly define the extent of developable urban areas across the shire, it is proposed an Urban
Growth Boundary be included on the zoning maps and referred to within the Strategic Framework
in Part 1, in the Desired Environmental Outcomes (DEOs) in Part 3 and in each of the locality
codes. This will reinforce Council’s position regarding areas for further growth in anticipation of
changes of the State Government South East Queensland Regional Plan.

Various minor amendments are proposed to the Strategic Framework and Desired Environmental
Outcomes in an effort to strengthen the statements and clarify preferred outcomes, including that
urban uses not be located outside the Urban Growth Boundary.

Likewise additional statements have been added to the overall outcomes within the locality
codes, particularly in relation to the character and extent of towns and villages and to the role of
rural lands in supporting agriculture and rural industries.

                                                                                   Page 52 of 155

Section 53

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                19 AUGUST 2014


3.    Agricultural Uses

It is proposed the Agricultural land use definitions be amended as follows:
 The definition of Cultivation be amended to qualify that it includes harvesting and the storage
   and packing of produce and plants grown on the site and the ancillary repair and servicing of
   machinery used on the site.
 The definition of Cultivation Type 1 Traditional be amended to clarify that it involves the
   growing of plants or plant material where dependent on the cultivation of soil and at a scale
   exceeding 20 fruit or nut trees or more than 100m 2 of any other crop. Cultivation of a lesser
   scale is exempt from the planning scheme.
 The definition of Cultivation Type 2 Intensive be edited to qualify that it involves growing
   plants on an imported media or requiring multiple applications of fertilisers, pesticides,
   fungicides or herbicides each season or where artificial lights or containers are used. Further
   examples of the use are greenhouse and shade-house plant production, hydroponic farms,
   wholesale plant supply, sugar cane farming, turf farming and mushroom farming.
 The definition of Animal Husbandry Type 1 Traditional be amended to include free-range
   poultry (including chickens, ducks, geese, guineafowl and turkeys) and that poultry and egg
   production not be classified as Type 2 Intensive until the scale exceeds 1,000 birds or a
   density of 250 birds per hectare. This is in keeping with the recent State Interest Guideline
   for Agriculture.
 Also under the definition of Animal Husbandry, the keeping of one pet pig or one rooster be
   exempt and therefore not subject to the planning scheme, however local laws will still prevent
   these in urban areas. Two or more pigs or roosters would still be considered a land use
   subject to the planning scheme.

Both Cultivation Type 1 and Animal Husbandry Type 1 are proposed to be consistent and self -
assessable in the Rural Settlement Zone and the self-assessment criteria will determine if the lot
is large enough for the use (they are already self-assessable in the Rural Zone). For traditional
cultivation if the acceptable solutions cannot be met, code assessment would be required. For
traditional animal husbandry if the solution cannot be met, impact assessment would be required.

New code provisions are proposed as follows:

Cultivation:

Lot Size for Cultivation Type 1
Outcome: Cultivation occurs on a lot that is of a       Solution: The cultivation use is conducted
sufficient size to reasonably accommodate the use and   on a site at least 1 hectare in area.
mitigate potential nuisance arising from noise, dust,
odour and other emissions or contaminants generated
by the use.




                                                                                   Page 53 of 155

Section 54

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      19 AUGUST 2014


Animal Husbandry:
Lot Size for Animal Husbandry
Outcome 1: The lot is of sufficient area to enable       Solution 1 The minimum area of the lot is—
establishment of the use and associated uses.            a)   for grazing of poultry—4ha
                                                         b)   for breeding or boarding kennels or
                                                              pounds—4ha;
                                                         c)   for intensive poultry farms, piggeries or
                                                              stockyards—20ha;
                                                         d)   for cattle feedlots—40ha
                                                         e)   for aquaculture with a combined surface
                                                              area of all ponds or tanks of less than
                                                              200m2—1ha;
                                                         f)   for other aquaculture—5 ha.
                                                         g)   for all other animal husbandry—2ha

Noise & Nuisance
Outcome 2: Noise from the operation of the animal        Solution 2.1 Access points and roads are
husbandry use does not cause unlawful environmental      located to minimise noise and dust impacts on
nuisance.                                                neighbouring sensitive land uses; and

                                                         Solution 2.2 The design and siting of all
                                                         mechanical      equipment,      including     fans,
                                                         pneumatic feed systems and other equipment,
                                                         minimises the generation of mechanical noise,
                                                         odour and the likelihood of off-site vibration.

                                                         Solution 2.3 For breeding or boarding
                                                         kennels—the kennels are constructed of brick,
                                                         concrete or masonry.
Runoff
Outcome 3: The design and operation of the animal        Solution 3.1 Buildings used to house animals,
use incorporates integrated water management             as well as waste storage areas, are located on
elements such that                                       land that is not subject to flooding by the 100
a)   stormwater is prevented from entering sheds and     year ARI event;
     waste storage areas;                                AND
b)   stormwater peak discharges and run-off volumes      Solution 3.2 The base of all sheds is elevated
     are not increased; and                              above natural ground level to ensure that
c)   natural drainage lines and hydrological regimes     stormwater run-off does not enter the sheds;
     are maintained as far as practicable.               AND
                                                         Solution 3.3 All waste water, including water
                                                         used to clean animal sheds, is managed so that
                                                         contaminants will not reach nearby waterways.
Aquaculture
Outcome 4: Water is managed on site such that it will    Solution 4.1 & S5.1: Aquaculture occurs in
not reach Queensland waters via overland or              tanks or ponds where water is fully reticulated
stormwater flows.                                        within the facility with no discharge property or
                                                         waterways.
AND
                                                         Solution 5.2 & S5.2: Tanks or ponds used to
Outcome 5: Development is located and designed to        cultivate aquaculture fisheries resources or for
avoid, or otherwise minimise, impacts to areas host to   treatment or settlement of water are constructed
fisheries resources.                                     with the lowest point of the top of wall at least
                                                         the height of the Q50 flood level.
AND
                                                         Solution 6.1: Ponds are designed and
Outcome 6: Tanks or ponds are designed to avoid          constructed in accordance with Department of
leakage.                                                 Agriculture, Fisheries and Forestry's policy
                                                         Guidelines for Constructing and Maintaining
                                                         Aquaculture Containment Structures.



                                                                                         Page 54 of 155

Section 55

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                         19 AUGUST 2014


New separation distances are proposed for poultry farms as follows:
 From frontage:─ 100m
 From side and rear boundary: ─ 100m if Animal Husbandry Type 1 Traditional
 From land included in a residential zone other than the Rural Settlement Zone, commercial
   zones or Open Space Recreation zone: ─ 1,000m
 From land included in the Rural Settlement Zone: ─ 200m if Animal Husbandry Type 1
   Traditional
 From any dwelling unit on other premises: ─ 150m if Animal Husbandry Type 1 Traditional
 From watercourses: ─ 60m

4.    Home-based businesses

It is proposed to reduce the level of assessment for Home-Based Business Type 2 Evident from
code assessment to self-assessment in the Rural Settlement Zone and the Rural Zone. In the
urban residential zone it will remain code assessable but with clarification added that it is only
consistent when operated from a detached house (not from multiple housing).

The self-assessable solutions are proposed to be changed for Home-Based Business Type 2 so
that whether in town or in the hinterland there could be a maximum of two employees (other than
the resident business operator) and that if the business involves classes, up to four classes can
be held per week with no more than 10 people in a class.

5.    Roadside stall
It is proposed that the use definition of roadside stall (which is a sub-use within Retail Business
Type 1 Local) be amended to “the use of premises exceeding 5m2 but no more than 25m2 for the
display and sale of goods in rural areas”. In this regard it would no longer be limited to
agricultural produce.
The use would be made self-assessable in the Rural Zone. Specific Outcomes and Solutions for
the use would be amended substantially to read as follows:

Outcome 1 The stall is limited in scale appropriate to a     Solution 1.1 Produce for sale at the roadside
rural setting and provides only for the sale of locally      stall is limited to that which is grown or
grown and manufactured goods;                                produced on the site or in the surrounding area.
                                                             AND
AND                                                          Solution 1.2 The roadside stall does not
                                                             involve the sale of manufactured goods other
                                                             than where manufactured on the site.

                                                             Solution 2.1 The stall is not located on a
Outcome 2 The stall does not have an adverse effect          property adjoining the Bruce Highway.
on the safety and functioning of the major road network.     AND
                                                             Solution 2.2 The roadside stall is located on a
                                                             site with sufficient area to park 3 cars clear of
AND                                                          the road reserve and within 20 metres of the
                                                             roadside stall.
                                                             AND
                                                             Solution 2.3 Safe sight distances are provided
                                                             for vehicular crossovers in accordance with
                                                             Council’s Standard Drawing for rural driveways.

                                                             Solution 3.1 Not more than 1 sign is erected
Outcome 3 Signage associated with the roadside stall         on the premises and the sign:-
                                                                                                     2
is small, unobtrusive and appropriate to a rural location.   (a) has a maximum signface area of 0.5m per
                                                             side; and
                                                             (b) is not illuminated or in motion.



                                                                                            Page 55 of 155

Section 56

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      19 AUGUST 2014


6.    Granny Flats
It is proposed the Residential land use definition of Multiple Housing Type 1 Relative or
Employee be deleted from the scheme. Instead, the definition of Detached House is proposed
to be amended to specify it “may include a secondary dwelling not exceeding 65m2 in area.” An
administrative definition would be added as follows: “secondary dwelling means a dwelling used
in conjunction with, and subordinate to, a detached house on the same lot. A secondary dwelling
may be constructed under a detached house, be attached to a detached house or be free
standing. For clarity a detached house could not include more than one secondary dwelling.”
These changes are generally in line with the QPP standards. As the use is already self-
assessable in the Detached Housing Zone and the Rural Settlement Zone, the most significant
change would be in the Rural Zone or the Semi-Attached and Attached housing Zones where it is
currently subject to code assessment.

Only minor changes are proposed to the code solutions so the secondary dwelling will still be
small and attached to, or close to, the house.

7.    Community Residence

When amendments were made some years ago to accommodate the hospice use of community
residence there were some flaws created in the assessment tables that should be corrected.
The use code should also be corrected to reflect the expected maximum height limit of 8m and
acknowledge that reticulated water & sewerage is not expected outside the urban settlements.

8.    Detached House setbacks

Following community concern regarding the negative impact on neighbouring amenity caused by
a large highset home close to the common boundary, Councillors and staff have reviewed in
detail the allowable building setbacks for houses.

The Detached House Code calls up building setbacks in Schedule 1. It is proposed to amend
Schedule 1 for the Detached Housing Zone to require the following minimum setbacks:


Frontage—6m
One other boundary with a length of at least 11.0m (either sides or rear)─
a) where the lot has an area of at least 600m 2─
    i) 3.0m setback up to 4.5m height; and
    ii) 6.0m setback between 4.5m - 8.5m height
b) Where the lot area is less than 600m 2─ no part of the building protrudes beyond a projection line that
    rises from 1.8m above the ground at the property boundary to a point 8m in height 6m in from the
    property boundary as shown in Figure 1 below




                                                                                        Page 56 of 155

Section 57

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   19 AUGUST 2014


Figure 1




Other boundaries—
a) 1.5m setback up to 4.5m height;
b) 2m setback between 4.5m - 7.5m height; and
c) 2m plus 0.5m for every 3m or part thereof above 7.5m height.


9.    Camp Grounds

It is proposed to amend the Community land use definition of Open Space Type 2 Camp Ground
to “the use of premises for pitching a tent for the purpose of providing overnight accommodation
to the travelling public”. It may include toilet and shower facilities for the convenience of visitors.
It may include the ancillary use of parking an RV overnight. It does not include cabins or similar
structures. The use includes a Self-contained RV Overnight Area. It does not include Visitor
Accommodation or Multiple Housing Type 5 Relocatable as separately defined.
The administrative definition of caravan is proposed to be deleted and replaced with an
administrative definition of RV (Recreational Vehicle) being “a motorized or towable vehicle that
combines transportation and temporary living quarters for travel, recreation and accommodation.
The term includes caravans, campervans, motorhomes, camper trailers, truck mounted camper.
The term does not include a cabin or transportable building as separately defined”.
An administrative definition is proposed for a self-contained RV overnight area being “premises
used for the parking of self-contained RVs, for a maximum of 4 consecutive nights, where no
water is provided and no liquid or solid waste is left or disposed of on site”. Self-contained RVs
are those that can hold fresh water, greywater and/or blackwater and have on board cooking and
sleeping facilities.

                                                                                      Page 57 of 155

Section 58

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                       19 AUGUST 2014


It is proposed that the use of Open Space Type 2 Camp Ground be made consistent in both the
Rural Settlement Zone and the Rural Zone, the applicable level of assessment being self-
assessment where it is a self-contained RV overnight area and impact assessment otherwise. It
would remain consistent in the Open Space Recreation Zone and the Open Space Conservation
Zone, subject to impact assessment. It is proposed that any requirement for the use to be near
the Noosa Trail Network be removed.


The relevant code provisions for camp grounds would be as follows:
Site suitability
Outcome 1 Camp grounds are located on premises             Solution 1.1 The minimum site area for a
that are large enough to accommodate the use without       Camp ground is 1ha;
causing impact on other uses of the subject site or        AND
adjacent sites and provide for adequate separation from    Solution 1.2 Camp sites and associated
neighbouring Residential Uses.                             amenities are located at least 50m from any
                                                           dwelling unit on the subject or adjacent
                                                           properties.
                                                           AND
                                                           Solution 1.3 Parked recreational vehicles are
                                                           visually screened from any dwelling unit on
                                                           adjoining properties.
Vehicular access and circulation
Outcome 2 Vehicular access and parking does not            Solution 2.1 All camping or overnight parking of
adversely impact on the safety, capacity and operation     recreation vehicles occurs on site and not within
of the road network or pedestrian environment.             the road reserve.
                                                           AND
                                                           Solution 2.2 Adequate parking and vehicular
                                                           manoeuvring area is provided on site so all
                                                           vehicles enter and leave the site in a forward
                                                           gear.
Density
Outcome 3 Outside of urban settlements the scale and       Solution 3.1 Outside of the urban settlements:-
density of the camp ground is appropriate to its setting   a) For camp grounds, other than a self-
and does not detract from the rural or environmental            contained RV overnight area−
character of the local area.                                     i) the site density does not exceed 20
                                                                     camp sites per hectare
                                                                 ii) the maximum number of camp sites
                                                                     on any site does not exceed 100; and
                                                           b) For self-contained RV overnight areas−a
                                                                maximum of 5 caravans or recreational
                                                                vehicles are parked on site at any one
                                                                time.

Length of stay
Outcome 4 On-site accommodation is not used as             Solutions 4.1 Resident guests of the
permanent residential accommodation.                       campground stay no longer than 30 nights in a
                                                           year




                                                                                          Page 58 of 155

Section 59

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                        19 AUGUST 2014


Amenities
Outcome 5 Camp grounds other than a self-contained         Solution 5.1 For camp grounds other than a
RV overnight area are provided with a potable water        self-contained RV overnight area, a potable
supply and toilet facilities for guests.                   water supply of 10,000 litres per Camp ground
                                                           or 1,000 litres per camp site (whichever is the
OR                                                         greater) is provided with a bib cock tap fitting;
                                                           AND
Outcome 6 Where no power, potable water or effluent        Solution 5.2 For camp grounds other than a
disposal is provided on site only self-contained           self-contained RV overnight area, a minimum of
caravans or RVs with their own fresh water, grey water     one unisex toilet is provided on-site for every 10
and black water storage are accommodated on site.          camp sites.
                                                           AND
                                                           Solution 5.3 The total gross floor area of all
                                                           buildings associated with the operation of the
                                                                                                  2
                                                           camp ground does not exceed 350m



10.   Caravan Parks

The Residential land use definition of Visitor Accommodation Type 2 Caravan Park is proposed
to be amended to be “Premises used to provide for accommodation in RVs, self-contained
cabins, tents and similar structures for the public for short-term holiday purposes. The use may
include, where ancillary, a manager’s residence and office, a kiosk, amenity buildings or the
provision of recreation facilities for the use of occupants of the caravan park and accommodation
for staff.” The definition of Multiple Housing Type 5 Relocatable is also proposed to be amended
to reflect the QPP and better distinguish it from a caravan park.
It is proposed caravan parks be consistent uses in the Rural Settlement Zone, the Rural Zone
and the Open Space Recreation Zone, subject to impact assessment in each case. The
following have been added to the use code provisions to address rural circumstances:
Siting
Outcome 1 Caravan parks are located on                Solution.1 The minimum site area for a caravan
premises that are large enough to accommodate         park is 2ha.
the      anticipated    number     of    occupants,
administrative functions, amenities, recreational
facilities carparking and landscaped area.

Outcome 2 Caravan Parks are appropriately sited       Solution 2 Where located outside of the urban
so as not to generate land use conflicts with         settlements the caravan park buildings, recreational
neighbouring residents and Agricultural Uses;         facilities and sites are situated not less than
                                                      a)   50m from Agricultural Uses on adjoining
                                                           premises; and
                                                      b)   40m from the property boundary of any
                                                           property over 4ha in area located in the Rural
                                                           Zone

Outcome 3 Caravan parks are located so as to          Solution 3 The caravan park is not located on land
conserve the productive characteristics of            within the Agricultural Land Conservation Area as
agricultural land                                     shown on the Natural Resources Overlay Maps.




                                                                                           Page 59 of 155

Section 60

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                       19 AUGUST 2014


11.   Home Hosted Visitor Accommodation (B&B’s)

It is proposed that the level of assessment for Visitor Accommodation Type 1 Home Hosted,
which is limited to accommodating up to 6 guests within up to 3 bedrooms within an owners
home, be reduced from code assessable to self-assessable in the Rural Zone. It would remain
code assessable in the Rural Settlement Zone and Impact assessable in the Detached Housing
Zone. The code provisions are proposed to be modified as follows to accommodate self -
assessment:

Site Suitability
Outcome 1 The site has adequate area for the           Solution 1 The site has an area of at least
proposed use, including necessary visitor parking,     a)   4,000m2 in the Rural Settlement or Rural Zone
without adverse impact on neighbouring properties.          or
                                                       b)   800m2;in any other zone
Outcome 2 Home-hosted accommodation is
sited to avoid land use conflicts with residents and   Solution 2.1 The detached house used for the
Agricultural Uses on adjacent or surrounding           purpose of Home hosted accommodation is
premises.                                              situated not less than 50m from Agricultural Uses
                                                       on adjoining premises;
                                                       AND
                                                       Solution 2.2 The detached house used for the
                                                       purpose of home hosted accommodation is
                                                       situated at least 40m from the property boundary of
                                                       any property over 4ha in area located in the Rural
                                                       Zone.
                                                       AND
                                                       Solution 2.3 The home hosted accommodation is
                                                       directly accessible from a sealed road or a good
                                                       standard gravelled road.
Visual amenity and character
Outcome 3 Building works to the dwelling unit—         Solution 3.1 The use is carried out within a
a)   are of a scale and character consistent with      detached house or where it is in a separate wing or
     surrounding residential buildings; and            pavilion it is no more than 25m from and connected
b)   visually integrate and are compatible with any    to the living and dining areas of the detached house
     existing building, the topography and             by a covered walkway.
     vegetation on-site.
                                                       Solution 3.2 No more than 3 guest bedrooms are
                                                       provided for a total of no more than 6 guests.
Guest facilities
Outcome 4 An acceptable standard of privacy and        Solution 4.1 Guests are provided with a bedroom
facilities is provided for guests                      capable of being enclosed to prevent visual or other
                                                       intrusion by members of the host family or other
                                                       guests.
                                                       AND
                                                       Solution 4.2 A separate bathroom and toilet facility
                                                       is provided within the detached house for the
                                                       exclusive use of guests.

Outcome 5 Guest accommodation is not self-             Solution 5 Guests do not have their own laundry or
contained                                              food preparation facilities

Outcome 6 Sufficient parking spaces are provided       Solution 6 One on-site car parking space per guest
on the site to cater for guests                        bedroom is provided in addition to the car parking
                                                       space required for the detached house.




                                                                                          Page 60 of 155

Section 61

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                       19 AUGUST 2014


12.   Rural Visitor Accommodation

Visitor Accommodation Type 3 Rural is proposed to remain consistent, subject to impact
assessment in the Rural Settlement and Rural Zones. While applications will be assessed on
their merit rather than compliance with solutions, it is proposed to amend the code provisions to
read as follows:

Rural amenity
Outcome 1: Rural accommodation is established         Solution 1: Rural accommodation is located on
in the rural areas of the Shire in a manner that      sites—
protects the amenity of the rural areas while         a)   located in the Rural Zone or Rural Settlement
offering moderate to high levels of access to urban        Zone; and
facilities.                                           b)   which have an area of at least 4 ha

                                                      Solution 2: Rural accommodation does not exceed
Outcome 2: Rural accommodation is associated          a site density of —
with rural production, agricultural pursuits and      a) 2 cabins per hectare; or
promoting the natural environment and takes the       b) 2 guest bedrooms per hectare, providing the
form of farmstays, bed and breakfasts, cabins,              overall number of cabins and guest bedrooms
cottages or a small guest lodge.                            does not exceed 6.

Outcome      3:     Rural   accommodation        is   Solution 3.1 Rural accommodation buildings are—
appropriately sited so as not to generate land use    a)   situated no less than 50m from Agricultural
conflicts with neighbouring residents and                  Uses on an adjoining property; and
Agricultural Uses;                                    b)   situated no less than 40m from the property
                                                           boundary of any property over 4ha in area
                                                           located in the Rural Zone; and
                                                      c)   situated no less than 6m from the property
AND                                                        boundary of land in the Rural Settlement Zone.
                                                      AND
                                                      Solution 3.2 Rural accommodation is located so as
                                                      not to overlook the living areas of neighbouring
                                                      properties.

                                                      Solution 4 Buildings and other structures—
                                                      a)    take the form of small separate buildings
                                                            which are visually separated;
Outcome 4: The scale, design and external finish      b)    comprise a mix of lightweight (low mass) and
of buildings:-                                              textured external materials, such as timber
a) Complements the rural character and/or natural           cladding and corrugated iron roofs;
     character of the area and integrates with the    c)    reflect the line, form, colour and texture found
     surrounding landscape; and                             in the existing landscape and do not replicate
b) Incorporates colours and finishes that allow the         artificial or imported themes;
     buildings to blend in with the natural and/or    d)    use muted earth/environmental tones that
     rural landscape.                                       blend with the rural and/or natural
                                                            environment; and
                                                      e)    incorporate low reflective roofing.



13.   Entertainment & Dining Uses

Given there is currently some inconsistency in the scheme, it is proposed that Entertainment and
Dining Type 1 Food and Beverage be consistent in the Community Services Zone, where it is in
conjunction with a Community Use. In such circumstances it would be subject to code
assessment.




                                                                                          Page 61 of 155

Section 62

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  19 AUGUST 2014


Likewise, Entertainment and Dining Business Type 2 Recreation, Amusement & Fitness would
be added as a consistent use in the Community Services Zone, where it is in conjunction with a
Community Use. This use would require impact assessment in this zone.

Entertainment & Dining Type 2 would also be added as a consistent use in the Open Space
Recreation Zone subject to code assessment.

For clarity the definition of Entertainment & Dining Type 3 Bar is proposed to be amended to
“premises primarily for the serving of liquor for consumption on the premises. The use may
include ancillary sale of food for consumption on the premises and may include amplified music,
live entertainment and a dance floor. The use includes a hotel, tavern, bar or nightclub but does
not include a restaurant.”


14.   Residential units in Business Centres

It is proposed that the Assessment Table for the Business Centre Zone and the list of consistent
uses in that zone, in Cooroy, Noosa Heads, Noosaville and Tewantin be amended to clarify that
Multiple Housing is only consistent where it is part of a mixed use development. It has never
been intended to allow stand-alone residential units in the business centres.

Within the Residential Uses code a new outcome and associated solutions are proposed
specifically for mixed use development, as follows:

Mixed Use Developments
Outcome: Where the multiple dwelling units form part   Solution 1 Entry areas for the residents of, and
of a mixed use development, the development provides   visitors to, dwellings units are provided
residents with reasonable privacy and security.        separately from entrances for other building
                                                       users and provide for safe entry from streets,
                                                       car parking areas and servicing areas.
                                                       Solution 2 Clearly marked, safe and secure
                                                       parking areas are provided for residents and
                                                       visitors which are separate from parking areas
                                                       provided for other building users.
                                                       Solution 3 Security measures are installed
                                                       such that building users do not have access to
                                                       areas that are intended for the exclusive use of
                                                       residents of, and visitors to, residential
                                                       accommodation.


15.   Shire Business Centre

In 2008/09 a review of the Shire Business Centre was carried out that revealed a number of
shortfalls with how development over the site is regulated through the planning scheme. While
the Sunshine Coast Council did resolve to amend planning scheme provisions, priority was given
to preparing what was to be the new Sunshine Coast Council planning scheme and the
amendments did not occur.

It is recommended that a number of amendments be made to the planning scheme provisions for
the Shire Business Centre to fix current anomalies within the scheme and to better reflect current
approvals. The assessment table for MCUs in the Shire Business Centre Zone would read as
follows:




                                                                                     Page 62 of 155

Section 63

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                       19 AUGUST 2014



          Column 1                              Column 2                               Column 3
   Defined use or use class                Assessment category             Relevant assessment criteria -
                                                                           applicable code if development
                                                                            is self-assessable or requires
                                                                                   code assessment
AGRICULTURAL USES—
Consistent use                        Impact assessable
No Agricultural uses                  All Agricultural Uses

Inconsistent use
All Agricultural Uses
BUSINESS USES—
Consistent use                        Self-assessable if in Precinct B1    If code assessable—
Commercial business Type 1            and one of the following and not     a)    Noosaville Locality Code;
Office if located in Precinct E1-     involving any new buildings or the         and
E7 or B1-B3; or Types 2 Medical       expansion of buildings or outdoor    b)    Business Uses Code; and
or 3 Veterinary if located in         use area providing the building      c)    Landscaping Code; and
Precinct B1-B3, E1, E2, E6 or E7;     has already been approved for        d)    Engineering Works Codes.
or                                    one of these uses and no
Entertainment       and     dining    additional tenancies are being
business if located in Precinct       created —
B1 or B2                              a) Commercial            business
or                                        Types 1 or 2; or
Industrial business Type 1            b) Entertainment and dining
Warehouse        or     Type      2       business Type 1; or
Production,             alteration,   c) Retail business Types 1 or 2
repackaging & repairing, if               if not exceeding 2,000m 2 GFA
located in Precinct E3, E4 or E5;     Code assessable if—
or                                    a) Located in Precinct B1 and
Retail business Type 1 Local,             one of the following and not
or Type 2 Shop & salon if                 involving any new buildings
located in Precinct B1 or B2; or          or the expansion of buildings
Type 4 Showroom if located in             or outdoor use area but not
Precinct B3; or Type 5 Vehicle            complying with Column 2 of
uses if located in Precinct B3 or         Table      14.5,    Acceptable
E6; or Type 6 Hardware if                 Solutions S1.1 to S9.2 of the
located in Precincts B3 , E4 or           Business Uses Code—
E5; or Type 7 Garden and                 i) Commercial         business
Lifestyle Centre if located in                Types 1 or 2; or
Precinct B3, E4 or E5                    ii) Entertainment and dining
                                              business Type 1; or
Inconsistent use
                                         iii) Retail business Types 1
Those Business Uses listed in
                                              or 2 if not exceeding
Section 11.37
                                              2,000m2 GFA; or
                                      b) Commercial business Type
                                          1, if not in Precinct RES or
                                          REC/MU; or
                                      c) Commercial business Type
                                          2 or 3, if in Precinct B1-B3,
                                          E1, E2, E6 or E7; or
                                      d) Entertainment and dining
                                          business Type 1 or 3 in
                                          Precinct B1; or
                                      e) Entertainment and dining
                                          business Type 2 in Precinct
                                          B1 or B2; or
                                      f) Industrial business Types 1
                                          or 2 in Precinct E3, E4 or E5;
                                          or

                                                                                          Page 63 of 155

Section 64

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    19 AUGUST 2014


          Column 1                             Column 2                             Column 3
   Defined use or use class               Assessment category           Relevant assessment criteria -
                                                                        applicable code if development
                                                                         is self-assessable or requires
                                                                                code assessment

                                     g) Retail business Type 1 in
                                        Precinct B1 and B2; or
                                     h) Retail business Type 2 if not
                                        exceeding 2,0002 GFA in
                                        Precinct B1; or
                                     i) Retail business Type 4 in
                                        Precinct B3; or
                                     j) Retail business Type 5 in
                                        Precinct B3 or E6; or
                                     k) Retail business Type 6 in
                                        Precinct B3, E4 or E5; or
                                     l) Retail business Type 7 in
                                        B3, E4 or E5

                                     Impact    assessable—if      not
                                     otherwise self-assessable     or
                                     code assessable


COMMUNITY USES—
Consistent use Education Type        Impact assessable
1 Childcare if located in Precinct    All Community Uses
E1, E2, E7 or REC/MU, Type 3
Adult if located in Precinct E1-E7
or Type 4 Information if located
in Precinct E1, E2, E6 or E7;
or
Emergency Services Type 1
Station if located in Precinct
REC/MU;
or
Open Space Type 1 Sport &
Recreation if located in REC/MU;
or
Wellbeing Type 2 Social if
located in Precinct E1, E2, E6 or
E7; Type 3 Worship if located in
Precinct E1, E6 or REC/MU

Inconsistent use
Those Community Uses listed in
Section 11.37

INFRASTRUCTURE USES—
Consistent use                       Impact assessable
Transport Type 1 Passenger           All Infrastructure Uses
terminal if located in Precinct E6
or E7; or Type 2 Carpark if
located in Precinct E6

Inconsistent use
Those Infrastructure Uses listed
in Section 11.37



                                                                                       Page 64 of 155

Section 65

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      19 AUGUST 2014


             Column 1                          Column 2                               Column 3
      Defined use or use class            Assessment category             Relevant assessment criteria -
                                                                          applicable code if development
                                                                           is self-assessable or requires
                                                                                  code assessment
RESIDENTIAL USES—
Consistent use                       Code assessable if                   If code assessable—
Ancillary dwelling unit if located
                                     ancillary dwelling unit located in   a) Noosaville   Locality   Code;
in E1-E7, RES or REC/MU; or
                                            Precincts E1-E7, RES or          and
Multiple housing Type 4
                                            REC/MU
Conventional       where     small                                        b) Residential Uses Code; and
dwelling units located in Precinct   Multiple housing Type 4 where
RES or                                                                    c) Landscaping Code; and
                                            small     dwelling    units
Multiple housing Type 4                     located in Precinct RES       d) Engineering Works Codes
Conventional       where     small
dwelling units located in Precinct   Impact assessable ─ if        not
E1 or E7 where subordinate or        otherwise code assessable
ancillary to a Business or
Community Use
Visitor accommodation Type 4
Conventional if located in
Precinct RES

Inconsistent use
Those Residential Uses listed in
Section 11.37
OTHER USES—
Uses not otherwise defined           Exempt if a road

                                     Impact assessable—otherwise

Slight amendments are proposed to the Noosaville locality code in respect to development within
the Shire Business Centre Zone to reflect the consistent / inconsistent uses. Additionally, the
allowable height for precincts E3, E4 and E5 would be raised from 8m to 10m in keeping with the
adjoining industrial estate and to better accommodate the industrial and trade related uses
planned for these precincts.


16.     Advertising Devices

While the intent of the Advertising Devises Code remains the same it is proposed to make
amendments to clarify definitions and update policy around changing technologies and
commercial circumstances. It is proposed to change the way allowable signage is calculated for
multiple tenancy premises on both the primary and secondary frontages.

A clearer definition of the sign face area and types of signs is also proposed

The assessment table for development other than a material change of use within each locality
plan is also proposed to be amended so advertising devices are called up whether associated
with an MCU or not.




                                                                                          Page 65 of 155

Section 66

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    19 AUGUST 2014


17.   Building Works

It is proposed a new section be added in Part 2, in line with the QPP, to explain how building
work is regulated under the planning scheme and the relationship between the planning scheme,
the Building Act and the Queensland Development Code (QDC). Additionally amendments are
proposed to the Building Works Code and the Detached House Code to explain which solutions
are alternative provisions to the QDC. Accordingly the outdated section on alternative provisions
to the QDC which currently appears in each locality plan should be deleted.


18.   Driveways for Detached Houses

Minor amendments are proposed to the Detached House Driveways Code to call up appropriate
standards for driveway designs including for driveway gradients and specifically references
council’s standard drawings and Austroads guidelines.


19.   Erosion and Sediment Control

Changes are proposed to the Erosion and Sediment Control Code to clarify the need for suitable
erosion and drainage control and sediment capture and treatment for new developments.

New overall outcomes would state—
a)   construction activities are managed to prevent erosion and sedimentation to offsite waters
     including stormwater, creeks and rivers;
b)   development facilitates erosion control, drainage control and sediment capture and
     treatment ; and
c)   construction activities within watercourses are planned to prevent erosion, construction
     failure and associated sedimentation.

New specific outcomes and probable solutions would state—

Erosion and drainage control, sediment capture and
stormwater runoff                                        S1.1 Construction works are designed,
O1 Development design, density, layout, and staging      planned and executed with respect to the
provide for erosion control, drainage control and        principles of erosion reduction, drainage
sediment capture and treatment during the construction   management and sediment capture in
phase.                                                   accordance with Appendix 2, Table A of the
                                                         Queensland State Planning Policy and
                                                         International Erosion Control Association Best
                                                         Practice Erosion and Sediment Control
                                                         (BPESC) 2008;
                                                         AND
                                                         S1.2 Construction works are designed and
                                                         managed to restrict the extent of clearing and
                                                         soil exposure to that necessary for access,
                                                         and safe construction;

                                                         S1.3 Clean stormwater is diverted or managed
                                                         around or through the site without increasing
                                                         the concentration of total suspended solids or
                                                         other contaminants in the flow and without
                                                         causing erosion (onsite or offsite);

                                                         S1.4 Cleared areas are effectively stabilised
                                                         prior to rainfall if works are delayed or works
                                                         are not intended to occur immediately;

                                                                                      Page 66 of 155

Section 67

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  19 AUGUST 2014



                                                       S1.5 For buildings,
                                                       a)    upstream runoff must be diverted around
                                                             the construction site; and
                                                       b)    sediment      barriers     are   provided
                                                             downslope of disturbed areas to prevent
                                                             sediment washing into gutters, drains and
                                                             watercourses either on or off the site;
                                                             and
                                                       c)    exposed soil and construction access
                                                             must be managed in accordance with the
                                                             International Erosion Control Association
                                                             Best Practice Erosion and Sediment
                                                             Control (BPESC) document 2008; and
                                                       d)    temporary or permanent downpipes are
                                                             connected to the stormwater system
                                                             before laying the roof; or
                                                       e)    localised erosion is avoided by directing
                                                             flow from downpipes over non-erosive
                                                             areas.
Works in a watercourse                                 S2.1 Work within waterways must be
O1 Construction activities within watercourses are     undertaken in accordance with Best Practice
planned to prevent erosion, construction failure and   Erosion and Sediment Control, Appendix I –
associated sedimentation.                              Instream works, Sections 14 and 16
                                                       International Erosion Control Association 2008.

                                                       S2.2 Temporary vehicular crossings of
                                                       waterways must be designed and constructed
                                                       to convey flows for the 50%AEP event and
                                                       remain stable for all rainfall events up to
                                                       10%AEP event.


20.   Water and Sewerage

Given that Council no longer administers the Water Supply & Sewerage Reticulation Code, and
the network assets are not its responsibility, it should be removed from the planning scheme. As
a consequence however it is suggested that statements be added to the use codes to ensure
that development in urban zones or within service areas connect to reticulated sewerage, water
supply and stormwater drainage at no cost to Council.


21.   Water Sensitive Urban Design

Various amendments are proposed to the Water Sensitive Urban Design Code to bring the
provisions in line with current best practice for stormwater and water quality management
including the following overall outcomes:

a)    development is designed, constructed and operated in a manner that contributes to, and
      does not impede, long term attainment of relevant Environmental Values and Water Quality
      Objectives as specified in the Environmental Protection Policy 2009;
b)    development avoids adverse impacts on downstream ecosystems, properties and
      infrastructure due to changes to stormwater flow, water quality or ecosystem health;




                                                                                    Page 67 of 155

Section 68

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                         19 AUGUST 2014


c)   stormwater conveyance channels use natural channel design principles to convey external
     catchment stormwater through development and support landscape, passive recreation and
     ecological values;
d)   urban development captures and utilises run-off from appropriate areas for use on site; and
e)   water reuse facilities have no adverse impact on the quality of the town mains water.

Specific outcomes and probable solutions would state—

Maintenance of environmental values and water
quality objectives
Outcome 1 Downstream ecosystems, properties and             Solution 1.1 Development meets the applicable
infrastructure are not adversely impacted by either         performance outcomes of the State Planning
changes to flow, water quality or ecosystem health          Policy Appendix 2 SPP Code: Water Quality;
caused by development.                                      AND

                                                            Solution 1.2 Design and construction methods
                                                            for stormwater quality treatment assets are in
                                                            accordance with Healthy Waterways Water By
                                                            Design Guidelines;
                                                            AND

                                                            Solution 1.3 Commitments are made to
                                                            implement a cost effective maintenance
                                                            strategy for the life cycle of any engineered
                                                            water quality treatment device;
                                                            AND

                                                            Solution 1.4 Water quality nutrient load
                                                            modelling is undertaken in accordance with
                                                            Water by Design Music Modelling Guidelines to
                                                            demonstrate compliance with the SPP nutrient
                                                            reduction requirements;
                                                            AND

                                                            Solution 1.5 Stormwater outlets that directly
                                                            discharge to naturally acidic environments are
                                                            managed to prevent eutrophication;
                                                            AND

                                                            Solution 1.6 Suitable methods are incorporated
                                                            to prevent the spread of invasive environmental
                                                            weed species at stormwater outlets.
Water demand
Outcome 2 Urban development reduces the need for            S2.1 Captured water is plumbed to be available
mains water by capturing and utilising run-off from         for all external uses including gardening,
appropriate areas on site;                                  irrigation, ponds and outdoor cleaning.
AND
                                                            S3.1 Planting is in accordance with PSP 3
Outcome 3 Urban development reduces the need for            Landscaping Plans and Guidelines.
mains water by eliminating requirement for irrigation via
the use the endemic plant landscaping design;
AND                                                         S4.1 A suitable backflow prevention device is
                                                            installed to protect the drinking water within the
Outcome 4 Backflow devices or similar systems are           reticulated water supply in accordance with
installed, where necessary, to ensure water reuse           AS/NZS 3500:2003 Plumbing and Drainage.
facilities have no impact on the quality of the town
mains water.




                                                                                            Page 68 of 155

Section 69

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      19 AUGUST 2014


Shire Business Centre
Outcome 5 Within the Shire Business Centre site, as       No probable solution
shown on Map SBC run-off treatment is contained
within the developable areas of the site and drainage
lines are only used for final polishing of run-off;
AND

Outcome 6 Within the Shire Business Centre site, on-
site detention measures are contained within the
developable areas of the site, clear of drainage lines
and Open Space Precincts.

Use of natural treatments and systems
Outcome 7 Natural treatment strategies, including         S7.1 No probable solution
grass swales and bio-retention systems, vegetated
filtration strips and gross pollutant traps, are used
wherever possible;
AND

Outcome 8 Development design including density and        S8.1 Integration of stormwater quality treatment
scale provides adequate footprint to integrate all        is in accordance with Healthy Waterways Water
elements of stormwater quality and quantity treatment     Sensitive Urban Design Guidelines for South
infrastructure including, where relevant, bio-retention   East Queensland and the Water by Design Bio-
basin batters and maintenance access, without the         retention Technical Design Guideline.
need for retaining walls;
AND
                                                          S9.1 Landscape and ecological features (e.g.
Outcome 9 Stormwater conveyance channels use              plant species and habitat types) used in
natural channel design principles to convey external      stormwater     conveyance   channels      are
catchment stormwater through the development site         complementary to the local context, including
and support landscape, passive recreation and             natural waterways.
ecological values.                                        AND

                                                          S9.2 Planting densities result in a stable
                                                          channel over the long term and minimize
                                                          potential for invasive weed growth.

Outcome 10 Development design and operation               S10.1 Methods to prevent gross pollutants
facilitates nil increase in gross pollutants entering     entering stormwater systems and waterways
stormwater systems.                                       are adopted that—
                                                          a)    are low maintenance;
                                                          b)    prevent nutrient leaching in the event
                                                                scheduled maintenance is delayed; and
                                                          c)    facilitate human behaviour change (e.g.
                                                                signage, bins).


22.   Biodiversity and vegetation protection
Amendments are proposed to the Biodiversity Overlay Code to incorporate vegetation protection
requirements into the planning scheme from the now expired Temporary Local Planning
Instrument (Vegetation Protection Overlay). These amendments mean that tree clearing activities
that are not otherwise exempt and that sit outside the Biodiversity Overlay mapped areas would
be assessed to determine whether they are reasonably necessary and whether they would
adversely impact on ecological important areas, riparian vegetation, visual buffers, scenic
amenity, water catchment areas, cultural heritage, or a person or industry reliant on maintaining
the vegetation.
There is concern that the incremental loss of vegetation over time will erode important shire
values unless there is a mechanism in place that can ensure that reasonable and necessary tree
clearing occurs and that compensatory plantings are provided as part of tree clearing approvals.

                                                                                        Page 69 of 155

Section 70

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 19 AUGUST 2014


Other amendments are also proposed to increase the clarity of outcomes for ecologically
important areas, koala habitat and open space connectivity. A number of related definitions are
also proposed within the Biodiversity Overlay. Amendments to the Biodiversity Overlay are
included as Attachment 1.

The Biodiversity Overlay provides for a common assessment process for tree removal on public
and private lands. A separate supporting policy can also be prepared that outlines the broad
strategic direction and principles for vegetation management consistent with the Biodiversity
Overlay. This policy could outline a simple risk assessment method for public and private land
and criteria for removing trees that pose danger to public safety.

Other administrative definitions are proposed in Part 2 - Interpretation to assist with interpreting
the Biodiversity Overlay as follows:

ecologically important areas means—
a)   a natural waterway or wetland;
b)   riparian vegetation;
c)   an area of remnant or non-remnant native vegetation identified on a Biodiversity,
     Waterways and Wetlands Overlay Map; or
d)   an area which otherwise—
     i      contains or is likely habitat for scheduled species under the Nature Conservation
            (Wildlife) Regulation (Qld) 2006;
     ii     contains or is likely to contain listed threatened species and/or ecological
            communities, protected habitat or listed migratory species as defined by the
            Environmental Protection and Biodiversity Conservation (Cth) Act 1999;
     iii    contains a spring as defined under the Water Act (Qld) 2000; or
     iv     contains habitat for flora and/or fauna species of local ecological significance.

exotic weeds means a species of plant occurring in an area outside its historical natural range
and which has a negative impact for the environment or people.

23.   Heritage

The table of development with the Heritage Overlay Code is proposed to be amended to trigger
assessment against the Heritage Overlay Code for not just extensions to buildings within
character areas but for new buildings in character areas also. A new provision has been added to
the code to state that “New buildings incorporate building elements, materials and styles that
reflect the desired built form character of the street or character area”.

24.   Natural Hazards (flooding)

Given that one of the greatest threats to people and property in Noosa Shire is natural disaster
from flooding, it is important that the community is provided with the best available flood
information and appropriate measures to mitigate flood risk and disaster having regard to not
only current climate but potential future climate conditions that take account of the lengthy asset
life of new developments.

Amendments are proposed to the flood hazard mapping for the Natural Hazards Overlay to
include:

    new areas modelled for Pomona, Kin Kin, Cooroy, Six Mile Creek and Noosa Daintree
    modelling updates for the Noosa River
    latest climate change predictions.


                                                                                   Page 70 of 155

Section 71

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 19 AUGUST 2014


Legal advice suggests that council should be taking climate change into account when planning
for flood hazard. The current planning scheme includes a 300mm sea level rise for the Noosa
River flood hazard area based on modelling prepared in 1996. Experts advise that this region
could expect sea levels to rise as much as 800mm by 2100 and an increase in extreme weather
events including more severe and frequent flooding.

The amended mapping is based on a 1%AEP (Annual Exceedance Probability) flood event
(Q100) and adopts an 800mm sea level rise and 20% increase in rainfall intensity by the year
2100. These mapping amendments increase the extent of the area shown as being potentially
affected by flooding for the 1% AEP flood event. Larger, less frequent flood events will inundate
land beyond these extents.

If adopted, the mapping would also increase the height properties are required to be developed
to achieve the desired flood standard of immunity. To compensate for the increased flood height,
it is proposed to reduce the freeboard for minimum habitable floor levels for dwellings from
500mm (or 800mm for new development close the Noosa River) to 300mm. This will amount to a
modest overall increase in flood level of around 300mm in some areas. This means that the
habitable rooms such as bedrooms, kitchens and living rooms of new or extended properties in
these areas may need to be built 300mm higher than currently. This additional floor height is
considered to be readily achievable through appropriate design and site layout.

The 300mm freeboard is considered an appropriate safety factor given the conservative climate
change allowance. This approach will ensure the desired level of flood immunity of new
development is preserved for the life of the asset (say for the next 50 years) and will provide
important preparatory action to reduce Council and the community’s flood risk exposure.

By taking into account predictions for future sea level rise, in the short term this will provide an
additional level of flood immunity to new/redevelopment, enabling those developments to
possess greater resilience to extreme events.

As currently, the revised mapping would trigger assessment against the flood provisions in the
natural hazards code and would only apply to applications for new development, extensions over
50m2 and redevelopments.

Various changes are proposed to the flood provisions in the natural hazards code to ensure—
   development provides for an effective evacuation route or safe refuge areas on site;
   development does not alter the flood characteristics external to the development site based
     on current and future climate conditions;
   buildings are designed to provide for an attractive street front address appropriate to the
     intended use; and
   building materials used below the defined flood event have a high water resistance.
New definitions are proposed to be added to Part 2 Interpretation as follows:

defined flood event means the event, measured in terms of the likelihood of occurrence, and
associated inundation level adopted by the Council to manage development as identified in Table
13.12 (Flood levels and flood immunity requirements) of the Natural Hazards Overlay Code. The
DFE incorporates an allowance for future climate change over the design life of the development,
through increased rainfall intensities, mean sea level rise and a greater frequency of extreme
weather events.




                                                                                    Page 71 of 155

Section 72

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                           19 AUGUST 2014


essential community infrastructure means any one or more of the following—

(a)   emergency services infrastructure;
(b)   emergency shelters;
(c)   police facilities;
(d)   hospitals and associated facilities;
(e)   stores of valuable records or heritage items;
(f)   power stations and substations;
(g)   major switch yards;
(h)   communication facilities;
(i)   sewage treatment plants; and
(j)   water treatment plants.

probable maximum flood means the largest flood that could reasonably occur at a particular
location, resulting from the probable maximum precipitation. The PMF defines the extent of flood-
prone land. Generally, it is not physically or financially possible to provide general protection
against this event.


25.   Natural Resources Overlay Code

As the State Interest Guidelines to support the State Planning Policy have recently become
available, it is proposed to amend the overall outcomes, specific outcomes and probable
solutions for the Natural Resources Code to reflect the outcomes within these guidelines,
specifically in relation to agricultural land, extractive resources and water supply catchments.
These reinforced overall outcomes are proposed to read as follows:

       The overall outcomes sought for the Natural Resources Overlay Code are—
         a)    for agricultural land conservation areas—
                i      agricultural land in the rural zone is protected from fragmentation, alienation or
                       diminished agricultural productivity
                ii     good quality agricultural land in the rural zone is protected for agricultural uses;
                iii    the use of good quality agricultural land for agriculture is not adversely affected by
                       other forms of development; and
                uses that are able to be located elsewhere do not locate within agricultural land
                     conservation areas;
         b)    for extractive resource areas—
                i      development ensures that resource/processing areas and transport routes are
                       protected from encroaching development that is not a compatible extractive industry
                       use of the extractive resource area.
                ii     development for a sensitive or incompatible use maintains an effective separation
                       from a key resource area and does not encroach within a key resource area’s
                       separation area and its transport route separation area.
                iii    development, other than for an extractive industry, is buffered from and is able to
                       mitigate impacts likely to occur as a result of an extraction of resources from a
                       extractive resource area.
                iv     a high level of amenity for residents and land uses in the vicinity of extractive
                       resources, extractive industry operations and transportation routes is maintained;

                                                                                              Page 72 of 155

Section 73

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                           19 AUGUST 2014


           c)      for water supply catchment areas—
                   i       Lake Macdonald and Cedar Pocket dam water supplies are not adversely affected
                           by development or the effects of development;
                   ii      any development that is unavoidable within the catchment is planned, designed,
                           constructed and operated to manage stormwater, wastewater and any other
                           pollutants in ways that protect the water quality of Lake Macdonald and Cedar
                           Pocket dam;
                   iii     costs of water treatment and infrastructure maintenance are minimised;
                   iv      the expected life of dam infrastructure is maximised; and
                   v       the visual amenity of Lake Macdonald is not adversely affected by development; and

The Specific Outcomes and Probably Solutions for the Agricultural Land Conservation Area are
proposed to read as follows:


Reconfiguring a Lot
Outcome 1 Development does not result in the                            Solution 1.1       Land located within the
fragmentation of agricultural lands.                                    Agricultural Land Conservation Areas identified
                                                                        on Overlay Maps OM1.5—9.5 is not further
                                                                        subdivided.

Outcome 2       Boundary realignments maintain or                       Solution 2.1 Realignment of boundaries of a
improve the opportunity for sustainable agricultural                    lot on, or adjacent to, Agricultural Land
production on Agricultural Land Conservation Areas.                     Conservation Area:
                                                                          i)   results in a number of lots equal to or less
                                                                               than the total number of original lots;
                                                                          ii) results in a more productive use and
                                                                               management of agricultural land and
                                                                               water for agricultural uses;
                                                                          iii) does not lead to increased fragmentation
                                                                               of agricultural land;
                                                                          iv) does not increase potential conflict
                                                                               between agricultural and non-agricultural
                                                                               uses; and

Outcome 3 Lots created for urban settlement or rural                    Solution 3.1 An adequate buffer area is
settlement in the vicinity of Rural Zone land, provide                  designed and located in accordance with the
sufficient separation and other buffering to ensure that                State Interest Guideline on Agriculture and the
potential impacts from agricultural activities do not                   1997 Planning Guidelines – Separating
adversely affect—                                                       Agricultural and Residential Land Uses;
a)     community health, safety and amenity; and
b)     the continuing use of the agricultural land
       resource;

Location of incompatible uses
Outcome 4 Uses that permanently alienate agricultural                   No solution provided1
land from production are not located within the
Agricultural Land Conservation Areas identified on
Overlay Maps OM1.5—9.5.
Separation of incompatible uses
Outcome 5 Adequate separation is provided between                       Solution 5.1 A distance of not less than 500m
existing or potential Agricultural Uses on land within an               separates the use and any area identified as
Agricultural Land Conservation Area and incompatible                    Agricultural Land Conservation Area on Overlay
land uses.                                                              Maps OM1.5—OM9.5;
                                                                        OR

1
 PSP1 Details information Council may request to assist in the assessment of whether or not the application achieves the relevant
specific outcomes.

                                                                                                               Page 73 of 155

Section 74

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                          19 AUGUST 2014


                                                                        Solution 5.2 Buffer areas and buffer elements
                                                                        not less than those calculated in accordance
                                                                        with Section 3 of the 1997 Planning Guidelines:
                                                                        Separating Agricultural and Residential Land
                                                                        Uses are provided and maintained to separate
                                                                        the use and any area identified as Agricultural
                                                                        Land Conservation Area on Overlay Maps
                                                                        OM1.5-OM9.5.

The Specific Outcomes and Probable Solutions for the Extractive Resource Areas are proposed
to read as follows:

Key or Local Resource/processing area
Outcome 1 Development or use of premises within                       Solution 1.1          Development within the
the resource/processing area is compatible with the—                  resource/processing area is for Extractive uses
a)    winning of the extractive resource;                             or directly associated with Extractive uses;
b)    ongoing operation or expansion of existing or                   OR
      potential Extractive uses; and                                  Solution 1.2 Development is for other uses that
c)    safe and efficient transport of materials to and                would not constrain existing or future Extractive
      from Extractive use sites.                                      uses.
Resource/processing separation area
Outcome        2         Development       within    the              Solution 2.1 No additional lots are created
resource/processing separation area—                                  within either Key Resource Areas or Local
a)    does not increase the number of people living in                Resource Areas shown on Overlay Maps
      the separation area; and                                        OM1.5—OM9.5.2
b)    incorporates measures which avoid or mitigate
      adverse impacts from the winning and                            Solution 2.2 Development incorporates design,
      transportation of the extractive resource; and                  orientation and construction materials that
c)    does not compromise the function of the                         mitigate the potential adverse effects from an
      separation area in providing a buffer between                   existing or future extractive industry to acceptable
      Extractive uses and other uses.                                 levels by:
                                                                       a)    locating buildings and structures the
                                                                             greatest distance practicable from the
                                                                             resource/processing area and associated
                                                                             transportation route,
                                                                       b)    designing buildings so the areas where
                                                                             people live, work and congregate (habitable
                                                                             rooms)     are    furthermost  from     the
                                                                             resource/processing area and associated
                                                                             transportation route;
                                                                       c)    minimising openings in walls closest to
                                                                             extractive operations;
                                                                       d)    providing    mechanical          ventilation    to
                                                                             habitable rooms;
                                                                       e)    use of appropriate construction methods
                                                                             and materials including insulation and
                                                                             glazing materials; and
                                                                       f)    providing private outdoor recreation space
                                                                             adjacent to a building façade shielded from
                                                                             the extractive industry or resource.




2
    PSP1 outlines information Council may request for development within either Key Resource Areas or Local Resource Areas

                                                                                                             Page 74 of 155

Section 75

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                         19 AUGUST 2014



                                                                         Advisory note
                                                                         Where lots have land both within and
                                                                         outside the separation area, a residential
                                                                         use of the lot may be approved provided
                                                                         dwellings are located outside the separation
                                                                         areas. Plans lodged with Council shall include
                                                                         building envelopes that identify the location
                                                                         of the dwelling.


Haulage routes separation area
Outcome 3 Development does not adversely affect                     Solution 3.1 Development does not increase the
the safe and efficient operation of vehicles                        number of properties with access points to the
transporting extractive materials.                                  haulage routes shown on Overlay Maps OM1.5—
                                                                    OM9.5.
                                                                    OR
                                                                    Solution 3.2 Development access points are
                                                                    designed to ensure the safe and efficient
                                                                    operation of vehicles transporting extractive
                                                                    materials.
Design and operation
Outcome 4 The design and operation of extractive                    No solution provided
resource uses minimises and mitigates the potential
for adverse impacts on environmentally sensitive
areas and amenity of existing uses.

Extractive Resources
Outcome 5 Industrial business Type 3 Extractive are                 No solution provided
designed, located and operated to ensure—
a)    haulage routes3 associated with extractive
      resources—
       i)      are located on roads where the haulage
               route will minimise adverse impacts on
               residential and urban residential amenity;
       ii)     are located on roads which are of
               adequate construction, or may be
               upgraded, to a standard commensurate
               with the volume, type and nature of the
               vehicular traffic utilising the haulage
               route; and
       iii)   are adequately maintained as a part of
               the utilisation of the extractive resource;
b)     the utilisation of any extractive resource does
       not result in adverse visual impacts from major
       roads; and
c)     the rehabilitation of extractive industry sites,
       prior to or in conjunction with land use changes
       on the site of the resources or within buffers to
       the resource.




3
 Some haulage routes associated with the Extractive use are identified within either the Key Resource Area or Local Resource Area
shown on Overlay Maps OM1.5-OM9.5.

                                                                                                            Page 75 of 155

Section 76

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              19 AUGUST 2014


26.   Zone Changes

A complete list of zoning changes is included as Attachment 2. In general they can be
summarised as either correcting the zones of a new residential estate where the lot layout was
not finalised when the zone was applied; applying a conservation zone to land purchased
through the conservation levy; or changing the zone of Council land to reflect the established or
preferred use.


State Interest

Council Officers have met with officers of various State Agencies during July to gain an
appreciation of State Interests. No formal response has been received to date. A complete
State Interest Review will occur once Council has proposed amendments to forward to the
Minister.


Previous Council Consideration

At its meeting of 29 May 2014, Council resolved:

That Council note the report by Strategic Planner, Strategic Land Use Planning to the Planning
and Organisation Committee dated 20 May 2014, and respond to persons who made
submissions to the preliminary consultation on the proposed scheme amendments advising them
of the process going forward.

It is proposed that once Council has draft amendments available submitters can be informed of
Council’s intentions, ahead of formal public notification within the coming months.

At its meeting of 6 March 2014, Council resolved:

That Council note the report by Project Leader, Strategic Planning, Planning & Development to
the Planning & Organisation Committee dated 25 February 2014 and:
A.     Resolve not to proceed with the previous Sunshine Coast Regional Council Draft
       Planning Scheme process which applied to the Noosa Shire area;
B.     Resolve to commence the process of making planning scheme amendments to the
       Noosa Plan;
C.     Authorise the Chief Executive Officer to advise the Minister of Council’s proposal to
       commence the process of making planning scheme amendments; and
D.     Respond to persons who made Noosa-relevant submissions to the draft Sunshine Coast
       Planning Scheme in 2012 to advise them of Council’s intention regarding a planning
       scheme review.


Finance & Risk

A weak or flawed planning scheme is harder to rely on in development assessment or to defend
in planning appeals. Each time a development approval is granted in conflict with the planning
scheme it erodes the strength of the scheme and erodes the community’s confidence in the
planning scheme. Therefore it is considered timely to update the planning scheme to strengthen
it and better reflect the expectations of the Noosa Shire Community and the planning policies of
the State.


                                                                                 Page 76 of 155

Section 77

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 19 AUGUST 2014


Consultation

External Consultation - Community & Stakeholder

Preliminary consultation on the planning scheme review occurred during April/May 2014. During
this period 78 submissions were received from consultants, community organisations, business
owners and private individuals. These submissions were previously reported to Council and
have been considered in the drafting of the proposed amendments.

Meetings with officers of various State Departments has led to the proposed update of various
parts of the scheme including aspects of economic development, biodiversity, natural hazards
and natural resources.

Internal Consultation

Various parts of Council either use or are affected by the Planning Scheme and widespread
internal consultation has occurred to highlight issues and potential solutions with the scheme.

Departments/Sections Consulted:

X   Community Services                       X   Planning & Infrastructure
X   Disaster Management & Public Order       X   Building & Plumbing Services
    Waste & Environmental Health             X   DA Planning
X   Community Facilities                     X   Strategic Land Use Planning
    Cultural Facilities                      X   Asset Design & Investigations
                                                 Asset Planning
                                                 Civil Operations
                                                 Environment
                                             X
X   Executive Office                         X   Corporate Services
    Community Engagement                         Finance
    Customer Service                             ICT
    Executive Support                            Procurement & Fleet
    Governance                               X   Property & Facilities
    Human Resources                              Revenue Services




                                                                                   Page 77 of 155

Section 78

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014


                                                   ATTACHMENT 1




                                                     Page 78 of 155

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                       19 AUGUST 2014

                                                                                                       ATTACHMENT 1

                                                 PART 13 -          OVERLAYS                                            ex
                                                                                                                           So
                                                                                                                        xs
                                                  Division 1—        Preliminary                                        os
                                                                                                                        DE
                      13.1     Overlays                                                                                 3 g
                                                                                                                            2
                      13.1.1.  The provisions of this part comprise the following—                                      = =
                               Division1—      Preliminary                                                    13-1      s 8
                                                                                                                _           a
                               Division 2—     General Provisions of the Biodiversity Overlay                 13-1         a
                                                                                                                            ©
                               Division 3—     Assessment table for the Biodiversity Overlay                  13-2
                               Division 4—     Biodiversity Overlay Code                                      13-4
                               Division 5—     General Provisions for the Heritage Overlay                   13-11
                               Division 6—     Assessment tables for the Heritage Overlay                    13-13
                               Division 7—     Heritage Overlay Code                                         13-16
                               Division 8—     Assessment tables for the Natural Hazards and Natural         13-22
                                               Resources Overlays
                               Division 9—     Natural Hazards Overlays Code                                 13-30
                               Division 10—    Natural Resources Overlay Code                                13-39

                        Division 2—         General Provisions of the Biodiversity Overlay
                      13.2.    Definitions
                               The following definitions are applicable to this code—
                               category 1 lot means a freehold lot of 0.3 hectares or less in the protected
                               vegetation overlay area.
                               category 2 lot means a freehold lot of more than 0.3 hectares but less than 2
                               hectares in the protected vegetation overlay area.
                               category 3 lot means a freehold lot of 2 hectares or more, other than a category 4
                               lot, in the protected vegetation overlay area.
                               category 4 lot means a freehold lot of 2 hectares or more which is subject to a
                               property vegetation management plan in the protected vegetation overlay area.
                               critical habitat has the same meaning in the Nature Conservation Act 1992.
                               destroy has the same meaning in the Sustainable Planning Act 2009.
                               fire management activity means the controlled use of fire for pasture management,
                               to manage the risk of wild fire and to assist with the maintenance of ecological
                               processes in vegetation communities that are ecologically adapted to fire.
                               forest practice has the same mean as in the Sustainable Planning Act 2009.
                               former local law means Interim Local Law No. 8 (Protection of Vegetation) 2011
                               and includes Interim Subordinate Local Law No. 8 (Protection of Vegetation) 2011.

                                                                  13-1
                                                            Biodiversity Overlay

                                                                                                          Page 78 of 155

Section 79

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014




                                                     Page 79 of 155

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                          19 AUGUST 2014

                          heathland means a vegetation community of local origin that is characterised by
            +             high species diversity and a canopy height generally less than 1.5 metres, growing
         oS 3             on sandy soils and or soils subject to periodic inundation or waterlogging.
        — >
        Oo  a             exempt clearing means—
            3
         Oo 3
         Oo 3             a)    clearing which is a property maintenance activity,
         Os
            =
        = s               b)    clearing which is reasonably necessary for emergency access or work or is
        2 8                     immediately required in response to an accident or emergency;
            Q
        be a             Cc)    clearing on a category 4 lot identified as exempt clearing for a property
            oO
                                vegetation management plan prepared and approved in accordance with
                                Local Law No. 10 (Vegetation Management)’;
                          d)    clearing which is reasonably necessary for carrying out work that is—
                                 (1)      authorised or required under an Act, regulation or local law; or
                                  (ii)    specified in a notice given by the local government or another
                                          regulatory authority;
                          e)    clearing in accordance with a development approval;
                         f)     clearing on a category 1 lot, where—
                                 (1)      the vegetation is within three (3) metres of an existing building or
                                          structure; and
                                 (ii)     the clearing is reasonably necessary for access to the building or
                                          structure or has been approved in a landscape plan; and
                                  (iii)   the vegetation is not otherwise required to be retained in
                                          accordance with a development approval:
                          g)    clearing on a category 2 or 3 lot, where—
                                 (1)      the vegetation is within ten (10) metres of an existing building or
                                          structure; and
                                  (ii)    the clearing is reasonably necessary for access to the building or
                                          structure or has been approved in a landscape plan; and
                                  (iii)   the vegetation is not otherwise required to be retained in
                                          accordance with a development approval:
                          h)    clearing on a category 3 or 4 lot greater than ten (10) hectares in area,
                                where—

                                 (1)      the vegetation is within 30 metres of a building or within ten(10) metres
                                          of a structure; and
                                 (ii)     the clearing is reasonably necessary for the control of fire risk to the
                                          building or structure; and

                1 Copies of property vegetation management plans can be obtained from the Noosa Council offices

                                                              13-2
                                                        Biodiversity Overlay

                                                                                                              Page 79 of 155

Section 80

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014




                                                     Page 80 of 155

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                        19 AUGUST 2014

                                       (iii)   the vegetation is not otherwise required to be retained in accordance
                                               with a development approval;                                                   ~
                                                                                                                           Ss
                                i)    clearing vegetation within the path of a utility service;                            = =
                                                                                                                              3
                               j)     clearing on a category 1, 2 or 3 lot, where the clearing —                           3 :
                                       :                                                                                   Os
                                      (i) _ is pruning of native vegetation for the purpose of tree maintenance or          9S 2
                                            hazard management; and                                                         = 7
                                       -                                                                                   28
                                      (ii)  results in no more than 20% loss of the live canopy volume of a tree within    = g
                                            a 12 month period; and                                                            a
                                      (iii) does not involve /opping or topping;
                                k)    the clearing is on a category 1, 2 or 3 lot, where the clearing is to vegetation
                                      that is regrowth other than the following—
                                      (i)   vegetation in an area identified as a landslide hazard area on the Natural
                                            Resources Overlay maps;
                                      (ii) | vegetation which is an endangered, vulnerable and near threatened plant
                                            as defined by the Nature Conservation (Wildlife) Regulation 2006;
                                      (1i1) vegetation which is critically endangered or vulnerable flora as defined by
                                            the Commonwealth Environment Protection and Biodiversity Conservation
                                            Act 1999;
                                      (iv)  heathland;
                                      (v)   riparian vegetation;
                                      (vi)  vegetation in a critical habitat,
                                      (vil) vegetation in an area that has been cleared in contravention of a local law
                                            including the former local law;
                                l)    clearing on land in the Agricultural Land Conservation Area (ALCA)
                                      identified on the Natural Resources Overlay maps;
                                m)    clearing in the course of a fire management activity;
                                n)    clearing in the course of a forest practice;
                              0)      clearing in accordance with a permit under the former local law.

                               land degradation means the following—
                               a)     soil erosion;
                                b)    a rising water table;
                               Cc)    the expression of salinity;
                               d)     mass movement by gravity of soil or rock;
                               e)     stream bank instability;

                                                                    13-3
                                                             Biodiversity Overlay

                                                                                                           Page 80 of 155

Section 81

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014




                                                     Page 81 of 155

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                        19 AUGUST 2014

                        f)     a process that results in declining water quality in a river stream, creek or
        ek                     watercourse or natural wetland.
           S
        x =              clearing means destruction of vegetation or interference with its natural growth, by—
           3
        o z              a)    cutting down, or
        a §              b)    cutting or tearing branches, stems or roots, topping, pruning or lopping as per
         oO 2                  Australian Standard AS 4373-2007 — Pruning of Amenity Trees; or
        = x              c)    poisoning, including contamination; or
        2 2              d)    releasing oil, petroleum, paint, cement, mortar or other deleterious substances to
        Ks                     a root zone; or
           x                   :       .
                         e) — ringbarking; or
                        f)     scar barking; or
                         g) _ fixing any object into living tissue or surrounding trunk or branches that may
                               destroy or seriously affect the vegetation; or
                         h) — using any tree climbing spikes in healthy trees that may destroy or seriously
                               affect the vegetation, other than in accordance with AS 4373-1996; or
                        i)     damaging a root zone by compaction, excavation or filling in a way that may
                               destroy or seriously affect the vegetation; or
                        j)     attaching guy rope, cable or other contrivances that may destroy or seriously
                               affect the vegetation; or
                         k)    uprooting or displacing that may destroy or seriously affect the vegetation but
                               not including destroying standing vegetation by stock.

                         Jopping, a tree, means cutting or pruning its branches, but does not include—
                         a)    removing its trunk; and
                         b)    cutting or pruning its branches so severely that it is likely to die.
                         property maintenance activity means clearing protected vegetation which is
                         reasonably necessary for property maintenance including the following—
                         a)    construction and maintenance of a farm track, fence and shed on site
                         b)    maintenance of crops
                        Cc)    slashing of grass
                         d)    harvesting of crops
                         e)    maintenance of pasture and cleared land areas
                        f)     pruning, felling and clearing of orchard vegetation species
                         g)    surveying purposes
                         h)    collection of firewood for non-commercial purposes
                        i)     removal of an exotic weed
                         j)    removal of undesirable plant species®
                         k)    any other maintenance activity specified in a property vegetation management
                               plan.
                         property vegetation management plan is a specific program of vegetation
                         management for a category 4 lot approved under the former Local Law No. 10
                         (Vegetation Management).

                         protected vegetation means vegetation protected from clearing in the Protected
                         Vegetation Overlay Area as follows—
                         a)    Category 1, 2 and 3 lots — all vegetation

                3 Undesirable Plant Species is defined in the Dictionary (Part 2 Interpretation).

                                                             13-4
                                                       Biodiversity Overlay

                                                                                                           Page 81 of 155

Section 82

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014




                                                     Page 82 of 155

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                     19 AUGUST 2014

                               b)    Category 4 lots — vegetation to be retained as part of a property vegetation
                                     management plan                                                                        ~
                                                                                                                        Cs
                               Protected Vegetation Overlay Area applies to the whole of the planning scheme            & S
                               area of the Noosa Plan.                                                                  Os
                                                                                                                        of
                               pruning has the meaning given in the AS 4373-2007 Pruning of Amenity Trees.              3 §
                                                                                                                            wal
                               reasonably necessary means vegetation clearing for a particular purpose where            Ss &
                               there is no alternative way of achieving the purpose that is prudent and feasible and    ® 3
                               that would avoid clearing or significantly reduce the extent of vegetation clearing.   Rw 3
                                                                                                                        Mm &
                               regrowth means any vegetation that is less than seven (7) years of age.                      *
                               sequential clearing means—
                               a)    a method of clearing trees whereby felling operations are conducted in discrete
                                     stages such that wildlife is provided sufficient time and space to enable them to
                                     move from the clearing site of their own volition without the need for human
                                     intervention to remove or relocate them; and
                               b)    the felling of limited numbers of trees at any one time at the clearing site and
                                     not clearing where native wildlife is present; and
                               Cc)   not the clearing of all trees on site in a single, uninterrupted operation.

                               topping means reducing the height of a tree through the practice of lopping (AS 4373-
                               2007 Pruning of Amenity Trees)

                         Division 3—        Assessment table for the Biodiversity Overlay
                      13.3.    Assessment categories for the Biodiversity Overlay

                      13.3.1   The assessment category for development on land subject to the Biodiversity Overlay
                               is identified in column 2 of Table 13.1 as follows—
                               a)    Making a material change of use;
                               b)    Carrying out building work not associated with a material change of use;
                               Cc)   Carrying out building work not associated with a material change of use if
                                     relocation or removal of a building;
                              d)     Carrying out operational work; or
                               e)    Reconfiguring a lot.

                                                                  13-5
                                                            Biodiversity Overlay

                                                                                                         Page 82 of 155

Section 83

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014




                                                     Page 83 of 155

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                          19 AUGUST 2014

                13.4     Relevant assessment criteria for development affected by a
        cz               Biodiversity Overlay
        oO &
        = >
        QO. 5   13.4.1   The relevant assessment criteria for development on land subject to the Biodiversity
         wo €            Overlay is referred to in column 3 of Table 13.1.
        He
        © 8     Table 13.1 Assessment Categories And Relevant Assessment Criteria For The
       Ss g     Biodiversity Overlay—All Development
        ® 8              Column 1                         Column 2                        Column 3
        — a        Type of Development             Assessment category              RCN CEC CRTC CI aL
           a                                                                              criterion
                Making a material change of     Exempt if—                      If code assessable—
                use— all uses and use classes; | a)  Detached house or          Biodiversity Overlay Code
                Carrying out building work not       community pesigence
                associated with a material           where loca e wi    nan
                change of use;                       approved building
                                                     envelope designated for
                Carrying out building work not       that use’: or
               Change fuse /reoeaton or         |)   involving development
                removal of a building;               within an EPA Estate’;
                Carrying out operational work; or | c) exempt clearing’; or
                Reconfiguring a lot.            d)   if the criteria for code
                                                     assessable do not
                                                     otherwise apply.
                                                Code assessable if
                                                involving—
                                                a)   clearing vegetation’ on
                                                     premises identified as
                                                     Environmental
                                                     Protection Area,
                                                     Environmental
                                                     Enhancement Area or
                                                     Riparian Buffer Area on
                                                     Biodiversity Overlay
                                                     Maps OM1.1 to OM9.1;
                                                     or
                                                b)   development on
                                                     premises identified as
                                                     Riparian Buffer Area on
                                                     Biodiversity Overlay
                                                     Maps OM1.1 to OM9.1,
                                                     except for demolition
                                                     works; or
                                                c)   Reconfiguring a lot
                                                     where the premises
                                                     contains vegetation on
                                                     land identified as
                                                     Environmental
                                                     Protection Area,
                                                     Environmental
                                                     Enhancement Area or

               * Building envelopes are included on property notations on council's rates records for affected lots.
                ° Development within an EPA Estate is managed in accordance with the Nature Conservation Act 1992 (NCA) and the
               provisions of any management plan or conservation agreement under the NCA.
                 As defined in section 13.2 above
                ” As defined in section 13.2 above

                                                             13-6
                                                       Biodiversity Overlay

                                                                                                             Page 83 of 155

Section 84

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014




                                                     Page 84 of 155

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                    19 AUGUST 2014

                               Column 1                       Column 2                       Column 3
                         Type of Development            Assessment category            RGEC lae eee als                   ~
                                                                                             criterion                 2s
                                                          Riparian Buffer Area on                                     & S
                                                          Biodiversity Overlay                                        as
                                                          Maps OM1.1 to OM9.1.                                         © =
                                                     d)   clearing of protected                                        a £
                                                          vegetation.                                                  0 §
                   pomer                              emt                                                              9 3
                                                                                                                      a
                                      Division 4—         Biodiversity Overlay Code                                       *
                     13.5     Biodiversity Overlay Code
                              The provisions in this division comprise the Biodiversity Overlay Code. They are:
                              e    compliance with the Biodiversity Overlay Code (Section 13.6);
                              e   overall outcomes for the Biodiversity Overlay Code (Section 13.7);
                              e    specific outcomes and probable solutions for the Biodiversity Overlay Code
                                   (Sections 13.8—13.10).
                     13.6     Compliance with the Biodiversity Overlay Code
                              Development that is consistent with the specific outcomes in sections 13.8—13.10
                              complies with the Biodiversity Overlay Code.
                     13.7     Overall outcomes for the Biodiversity Overlay Code

                     13.7.1.  The overall outcomes are the purpose of the Biodiversity Overlay Code.

                     13.7.2.  The overall outcomes sought for the Biodiversity Overlay Code are the following—
                              a)    The natural resources of Noosa Shire are conserved including—
                                    i      land which is of scenic, cultural, historical, educational, recreational,
                                          scientific, ecological, biodiversity, economic, social or aesthetic value;
                                    ii    soil or landforms such as watercourses, drainage lines, foreshores,
                                          dunes and steep siopes;
                                    ili   the ecosystem health and quality of the water, land and other natural
                                           resources; and
                                    iv    the extent and condition of native and remnant vegetation, including
                                          ecologically important areas, wetlands and areas of significant regrowth
                                          of local origin;
                              b)    The terrestrial and aquatic biodiversity of native flora and fauna and their
                                    habitats is maintained;
                              Cc)   Ecologically important areas, wildlife corridors, ecological linkages and riparian
                                    vegetation are conserved, managed, enhanced and rehabilitated to ensure the
                                    long term ecological viability, integrity and sustainability of native flora and fauna
                                    species, and to improve biodiversity, landscape stability, and resilience;
                              d)    Development is managed so as to avoid, or where avoidance is not practicable,
                                    minimises or mitigates the impacts upon the Shire’s biodiversity values and
                                    natural resources, including—

                                                                 13-7
                                                           Biodiversity Overlay

                                                                                                       Page 84 of 155

Section 85

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014




                                                     Page 85 of 155

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                      19 AUGUST 2014

                               i     ecologically important areas;
        o =                    il    the ecological values of water catchment areas;
           N
        o =                    iti   the water quality of waterways, the Noosa River system and ground and
        o£                           surface waters;
        Qe
        Ox                     iv    that part of the natural environment that may be environmentally harmed
        Oo £                         by vermin, pests, noxious plants or threats such as fire, development and
        = x                          inappropriate land management;
        O 3
        < 8                    Vv    vistas and scenic amenity of the landscape;
           a
                              vi     coastal resources and values including coastal foreshores, near shore
                                     marine environments, beaches, dunes, rocky headlands, beaches and
                                     river mouths; and
                              vii    koala habitat areas and ecological linkages that provide for connectivity
                                     and safety for the long term viability of koala populations.
                         e)   The replanting or rehabilitation of degraded ecosystems and habitat is achieved;
                        f)     In the case of urban areas, urban amenity, quality of life and ecosystem health is
                              maintained and enhanced;
                         g)   Clearing of protected vegetation only occurs where it is reasonably necessary
                              and in an environmentally sensitive manner that provide for suitable replacement
                              plantings.

                13.8     Specific outcomes for the Biodiversity Overlay Code
                         The specific outcomes sought for the Biodiversity Overlay Code are included in
                         column 1 of Table 13.2.   Probable solutions for code assessable development are
                         included in column 2 of Table 13.2.

               Table 13.2
                                 column 1                                        column 2
                            Specific outcomes                    Probable solutions (if code assessable)
                13.9     Vegetation retention and conservation”
               Environmental Protection Area &
               Environmental Enhancement Area
                Vegetation & Riparian Buffer Area              $1.1 An Ecological Assessment Report
                O01 Vegetation of local origin? on premises    prepared in accordance with Planning Scheme
               identified as—                                  Policy 18 — Ecological Assessment Guidelines
                a)   Environmental Protection Area’? or        demonstrates that the flora on the premises
                     Riparian Buffer Area on the Biodiversity | does not constitute Environmental Protection
                     Overlay Maps OM1.1 to OM9.1, is           Area or Environmental Enhancement Area
                     retained and conserved in its present     vegetation.”
                     form or improved to ensure its ongoing    OR
                     contribution to the natural resources and
                     biological diversity of the Noosa Shire; | $7.2 Where constructing a Detached House;
                     and                              4        or Community residence interference with
                b)   Environmental Enhancement Area’     on | vegetation does not extend beyond—
                     Biodiversity Overlay Maps OM1.1 —

               8 PSP18 Ecological Assessment Guidelines details information Council may require as part of an information request.
               ° Local origin is defined in the Dictionary (Part 2 Interpretation)
               ® Refer to Council's Vegetation of Noosa Shire study for further details on what constitutes Environmental Protection
               vegetation.
               " Refer to Council's Vegetation of Noosa Shire study for further details on what constitutes Environmental
               Enhancement vegetation.

                                                            13-8
                                                      Biodiversity Overlay

                                                                                                          Page 85 of 155

Section 86

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014




                                                     Page 86 of 155

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                         19 AUGUST 2014

                                        column 1                                        column 2
                                   Specific outcomes                    Probable solutions (if code assessable)
                            OMS.1, is protected from the impacts of | a)  30mofa building or 10m of a structure on         [2s
                            development by—                               lots greater than 10ha; or                      & =
                           i.     avoiding edge effects;              b)  10m ofa building or structure on lots 10ha      as
                            il.   avoiding fragmentation; and             or less but more than 0.3ha; or                  oO g
                            ili.   maintaining vegetation in          c)  3mofa building or structure on lots 0.3ha        C g
                                   manageable and viable                  or less.                                         Os
                                  configurations.                                                                         =é&
                      AND                                                                                                  ® 3
                      02 For the purpose of Reconfiguring a Lot       §2.1 Where clearing vegetation on the               <8
                      new lots are only created where they minimise   premises is for the purpose of Reconfiguring        Mm  &
                      the fragmentation and maximise the retention | a Lot—
                      of existing vegetation.                         a)    new boundaries to lots do not transect
                                                                            and fragment existing vegetation;
                                                                      b)    new lots are created to allow for suitable
                                                                            house site areas or other future buildings
                                                                            and works to be located within existing
                                                                            cleared areas or areas of low ecological
                                                                            value; and
                                                                      c)    building envelopes are designated for
                                                                            each lot.
                      O3 Clearing vegetation only occurs where— | $3.7 No solution provided
                      a)    no other suitable cleared or partially
                            cleared area is available on the
                            premises;
                      b)    the development minimises the total
                            footprint within which all activities,
                            buildings, structures, driveways and
                            other works are contained; and
                      Cc)   the development is located in areas of
                            low ecological value over other areas,
                            to the greatest extent practicable.

                      Environmental Protection category
                      Vegetation that falls within the Environmental
                      Protection category comprises regional
                      ecosystems that possess at least one of the
                      following environmental values or criteria—
                      °     The regional conservation status under
                            the Queensland Vegetation Management
                            Act 1999 is "Endangered";
                      .     It forms habitat for threatened or
                            protected fauna species, as identified in
                             Vegetation of Noosa Shire,
                      °     It is ‘rare’ or naturally restricted
                            regionally or locally, as identified in
                             Vegetation of Noosa Shire; or
                      e     The extent reserved within protected
                            areas in Noosa is ‘low’, as identified in
                             Vegetation of Noosa Shire.

                      ” This solution does not apply to the Riparian Buffer Area.

                                                                   13-9
                                                             Biodiversity Overlay

                                                                                                             Page 86 of 155

Section 87

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   19 AUGUST 2014




                                                     Page 87 of 155

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                       19 AUGUST 2014

                                 column 1                                       column 2
           x                Specific outcomes                    Probable solutions (if code assessable)
        & & | Environmental Enhancement category
        o =    Vegetation that falls within the Environmental
         wo 2  Enhancement category comprises regional
        Y 2 | ecosystems that possess at least one of the
        & S    following environmental values or criteria—
        = Ele        The regional conservation status under
        ® 3          the Queensland Vegetation Management
        — 3          Act 1999 is “Of Concern"; or
        b Ele        The extent reserved within protected
                     areas in Noosa is ‘medium’, as identified in
                      Vegetation of Noosa Shire.
                Wetlands
               04 Wetlands are protected from removal or | 54.7 A minimum separation distance of 100m
               degradation and any adverse impacts on          is provided between a wetland and any
               wetlands are prevented, minimised or            adjacent development or use.
               mitigated by—
               a)  maintaining adequate separation between
                   the wetland and any adjacent
                   development or use"*;
               b)  minimising any modification of the natural
                   characteristics of the wetland, including
                   the topography, surface and groundwater
                   hydrology, water quality and flora and
                   fauna species;
               Cc) preventing any new development within
                   wetlands;
               d)  minimising access to the wetland;
               e)  minimising impacts associated with pest
                   insect control and invasion by undesirable
                   plant species; and
               f)  providing for the rehabilitation and
                   replanting of degraded wetlands.
               Riparian Zones
               O5 The biodiversity and ecosystem values of | $9.7 No new development occurs on, or partly
               watercourses, drainage lines, wetlands and      on, premises indicated as Riparian Buffer Area
               adjacent riparian zones are protected by—       on Biodiversity Overlay Maps OM1.1 to
               a)    avoiding any new development in the       OM8.1, except for—
                      riparian buffer area;                    a) temporary use of the land; or
               b)     retaining aquatic and terrestrial habitat b) Infrastructure which provides access to a
                         oe           .                           watercourse for recreational purposes;
                      in riparian zones;                       OR
               c)     maintaining wildlife corridors along     §5.2 Where constructing a Detached house
                      watercourses and drainage lines for      or Community residence and on an allotment
                      native fauna movement;                   situated wholly within the Riparian Buffer Area,
               d)    avoiding edge effects and incompatible | a)    fronting the Noosa River — development
                      uses in riparian zones;                       is setback a minimum of 40m from mean
               €)     maintaining bank stability by minimising      high water spring or as otherwise
                      bank erosion and slumping:                    prescribed by the Environmental
                         a                 :         .              Protection Agency’s Erosion Prone Area
               f)     maintaining water quality by filtering        Maps;
                     sediments, nutrients and other                      ,                  .
                                                               b) __ not fronting the Noosa River —
               "8 The extent of separation will be determined from the size, values and vulnerability of the wetland, likely natural
               fluctuations, and the nature of potential threats to its integrity and functions.
               ™ The Erosion Prone Area map for the Noosa River is reproduced in Schedule 5.
                                                            13-10
                                                      Biodiversity Overlay

                                                                                                          Page 87 of 155

The text continues on section 88.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.