PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 19 AUGUST 2014
Page 13 of 155
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 19 AUGUST 2014
Cooran
e Alternative Location 3 — 1344 Greenridge Pinbarren Road, Pinbarren
We advise Council that the minimum necessary height required at Alternative One would be 55m,
and the minimum necessary height required at Alternatives Two and Three would be 85m to clear
obstructions including vegetation. These heights are required to make a_ point-to-point
transmission link back to the adjoining (and approved) NBN facility at Pomona, to connect
Pinbarren back to the main NBN network.
Therefore, there is no question of proposing a lower height with a compromised service area —
this transmission height requirement represents an absolute technical pass or fail. Either the
transmission dish sees the adjoining network facility (to connect the community), or it doesn’t
(cutting off the community). Unfortunately a transmission link cannot be made at heights lower
than 55m at these alternative locations, and there are no other higher locations west of Pomona
Kin Kin Rd that offer elevations which could enable a shorter structure.
Please refer to Figures 1 to 3 below for the transmission assessment of the facility heights
required for the alternative locations west of Pomona Kin Kin Road. These figures illustrate the
terrain and obstruction (trees) limitations blocking a transmission link back to Pomona and
provide justification as to why these facility heights are required.
- Nome 1 =x 7 Og]
@®@ame ¥ ELF] (3) #
oc =__—_—_—_—_—_—_—_—_—_—_——_—_—_—_—_—_—_—9
GL0> ie E2 tet ST/42=067)— 97-94%
Ss
140 =
terrain and obstructions =
(e.g. trees) Fa
120 i
100 Approved NBN Pomona ; H S
: South Facility Location
ee JS £4“) y ™
0 0s 10 1.5 20 26 3.0 3.5 40 45 61
Pomona South Distance (km) Council_1
Figure 1: Transmission Assessment at Alternative Location 1
= caaaameemaas . - 0
ame k HF Gin 4
san —————————— 100008 (1 97 .
. Diesrence?? (et2 4 S7/k2=080)8 hg =
160
140 =
;
120 =
100 oy y . rs
PO SS YN a
Ry os 1.0 16 2.0 25 30 35 40 45 5.0
Pomona South Distance(km) Council_2
Figure 2: Transmission Assessment at Alternative Location 2
é Ss
qaurecon EHIESSON
Page 13 of 155See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.