PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  19 AUGUST 2014



                                                       S1.5 For buildings,
                                                       a)    upstream runoff must be diverted around
                                                             the construction site; and
                                                       b)    sediment      barriers     are   provided
                                                             downslope of disturbed areas to prevent
                                                             sediment washing into gutters, drains and
                                                             watercourses either on or off the site;
                                                             and
                                                       c)    exposed soil and construction access
                                                             must be managed in accordance with the
                                                             International Erosion Control Association
                                                             Best Practice Erosion and Sediment
                                                             Control (BPESC) document 2008; and
                                                       d)    temporary or permanent downpipes are
                                                             connected to the stormwater system
                                                             before laying the roof; or
                                                       e)    localised erosion is avoided by directing
                                                             flow from downpipes over non-erosive
                                                             areas.
Works in a watercourse                                 S2.1 Work within waterways must be
O1 Construction activities within watercourses are     undertaken in accordance with Best Practice
planned to prevent erosion, construction failure and   Erosion and Sediment Control, Appendix I –
associated sedimentation.                              Instream works, Sections 14 and 16
                                                       International Erosion Control Association 2008.

                                                       S2.2 Temporary vehicular crossings of
                                                       waterways must be designed and constructed
                                                       to convey flows for the 50%AEP event and
                                                       remain stable for all rainfall events up to
                                                       10%AEP event.


20.   Water and Sewerage

Given that Council no longer administers the Water Supply & Sewerage Reticulation Code, and
the network assets are not its responsibility, it should be removed from the planning scheme. As
a consequence however it is suggested that statements be added to the use codes to ensure
that development in urban zones or within service areas connect to reticulated sewerage, water
supply and stormwater drainage at no cost to Council.


21.   Water Sensitive Urban Design

Various amendments are proposed to the Water Sensitive Urban Design Code to bring the
provisions in line with current best practice for stormwater and water quality management
including the following overall outcomes:

a)    development is designed, constructed and operated in a manner that contributes to, and
      does not impede, long term attainment of relevant Environmental Values and Water Quality
      Objectives as specified in the Environmental Protection Policy 2009;
b)    development avoids adverse impacts on downstream ecosystems, properties and
      infrastructure due to changes to stormwater flow, water quality or ecosystem health;




                                                                                    Page 67 of 155
Log in to download the original file

2014-08-19 Planning & Organisation Committee Agenda - Pages 1-101(PDF, 8MB).pdf · 8.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.