PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 19 AUGUST 2014
17. Building Works
It is proposed a new section be added in Part 2, in line with the QPP, to explain how building
work is regulated under the planning scheme and the relationship between the planning scheme,
the Building Act and the Queensland Development Code (QDC). Additionally amendments are
proposed to the Building Works Code and the Detached House Code to explain which solutions
are alternative provisions to the QDC. Accordingly the outdated section on alternative provisions
to the QDC which currently appears in each locality plan should be deleted.
18. Driveways for Detached Houses
Minor amendments are proposed to the Detached House Driveways Code to call up appropriate
standards for driveway designs including for driveway gradients and specifically references
council’s standard drawings and Austroads guidelines.
19. Erosion and Sediment Control
Changes are proposed to the Erosion and Sediment Control Code to clarify the need for suitable
erosion and drainage control and sediment capture and treatment for new developments.
New overall outcomes would state—
a) construction activities are managed to prevent erosion and sedimentation to offsite waters
including stormwater, creeks and rivers;
b) development facilitates erosion control, drainage control and sediment capture and
treatment ; and
c) construction activities within watercourses are planned to prevent erosion, construction
failure and associated sedimentation.
New specific outcomes and probable solutions would state—
Erosion and drainage control, sediment capture and
stormwater runoff S1.1 Construction works are designed,
O1 Development design, density, layout, and staging planned and executed with respect to the
provide for erosion control, drainage control and principles of erosion reduction, drainage
sediment capture and treatment during the construction management and sediment capture in
phase. accordance with Appendix 2, Table A of the
Queensland State Planning Policy and
International Erosion Control Association Best
Practice Erosion and Sediment Control
(BPESC) 2008;
AND
S1.2 Construction works are designed and
managed to restrict the extent of clearing and
soil exposure to that necessary for access,
and safe construction;
S1.3 Clean stormwater is diverted or managed
around or through the site without increasing
the concentration of total suspended solids or
other contaminants in the flow and without
causing erosion (onsite or offsite);
S1.4 Cleared areas are effectively stabilised
prior to rainfall if works are delayed or works
are not intended to occur immediately;
Page 66 of 155
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.