Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2014-08-19 Planning & Organisation Committee Agenda - Pages 1-101

of 101

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                          19 AUGUST 2014


                                                                        Solution 5.2 Buffer areas and buffer elements
                                                                        not less than those calculated in accordance
                                                                        with Section 3 of the 1997 Planning Guidelines:
                                                                        Separating Agricultural and Residential Land
                                                                        Uses are provided and maintained to separate
                                                                        the use and any area identified as Agricultural
                                                                        Land Conservation Area on Overlay Maps
                                                                        OM1.5-OM9.5.

The Specific Outcomes and Probable Solutions for the Extractive Resource Areas are proposed
to read as follows:

Key or Local Resource/processing area
Outcome 1 Development or use of premises within                       Solution 1.1          Development within the
the resource/processing area is compatible with the—                  resource/processing area is for Extractive uses
a)    winning of the extractive resource;                             or directly associated with Extractive uses;
b)    ongoing operation or expansion of existing or                   OR
      potential Extractive uses; and                                  Solution 1.2 Development is for other uses that
c)    safe and efficient transport of materials to and                would not constrain existing or future Extractive
      from Extractive use sites.                                      uses.
Resource/processing separation area
Outcome        2         Development       within    the              Solution 2.1 No additional lots are created
resource/processing separation area—                                  within either Key Resource Areas or Local
a)    does not increase the number of people living in                Resource Areas shown on Overlay Maps
      the separation area; and                                        OM1.5—OM9.5.2
b)    incorporates measures which avoid or mitigate
      adverse impacts from the winning and                            Solution 2.2 Development incorporates design,
      transportation of the extractive resource; and                  orientation and construction materials that
c)    does not compromise the function of the                         mitigate the potential adverse effects from an
      separation area in providing a buffer between                   existing or future extractive industry to acceptable
      Extractive uses and other uses.                                 levels by:
                                                                       a)    locating buildings and structures the
                                                                             greatest distance practicable from the
                                                                             resource/processing area and associated
                                                                             transportation route,
                                                                       b)    designing buildings so the areas where
                                                                             people live, work and congregate (habitable
                                                                             rooms)     are    furthermost  from     the
                                                                             resource/processing area and associated
                                                                             transportation route;
                                                                       c)    minimising openings in walls closest to
                                                                             extractive operations;
                                                                       d)    providing    mechanical          ventilation    to
                                                                             habitable rooms;
                                                                       e)    use of appropriate construction methods
                                                                             and materials including insulation and
                                                                             glazing materials; and
                                                                       f)    providing private outdoor recreation space
                                                                             adjacent to a building façade shielded from
                                                                             the extractive industry or resource.




2
    PSP1 outlines information Council may request for development within either Key Resource Areas or Local Resource Areas

                                                                                                             Page 74 of 155
Log in to download the original file

2014-08-19 Planning & Organisation Committee Agenda - Pages 1-101(PDF, 8MB).pdf · 8.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.