Original source · versioned page text
2014-08-19 Planning & Organisation Committee Agenda - Pages 1-101
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 19 AUGUST 2014
Advisory note
Where lots have land both within and
outside the separation area, a residential
use of the lot may be approved provided
dwellings are located outside the separation
areas. Plans lodged with Council shall include
building envelopes that identify the location
of the dwelling.
Haulage routes separation area
Outcome 3 Development does not adversely affect Solution 3.1 Development does not increase the
the safe and efficient operation of vehicles number of properties with access points to the
transporting extractive materials. haulage routes shown on Overlay Maps OM1.5—
OM9.5.
OR
Solution 3.2 Development access points are
designed to ensure the safe and efficient
operation of vehicles transporting extractive
materials.
Design and operation
Outcome 4 The design and operation of extractive No solution provided
resource uses minimises and mitigates the potential
for adverse impacts on environmentally sensitive
areas and amenity of existing uses.
Extractive Resources
Outcome 5 Industrial business Type 3 Extractive are No solution provided
designed, located and operated to ensure—
a) haulage routes3 associated with extractive
resources—
i) are located on roads where the haulage
route will minimise adverse impacts on
residential and urban residential amenity;
ii) are located on roads which are of
adequate construction, or may be
upgraded, to a standard commensurate
with the volume, type and nature of the
vehicular traffic utilising the haulage
route; and
iii) are adequately maintained as a part of
the utilisation of the extractive resource;
b) the utilisation of any extractive resource does
not result in adverse visual impacts from major
roads; and
c) the rehabilitation of extractive industry sites,
prior to or in conjunction with land use changes
on the site of the resources or within buffers to
the resource.
3
Some haulage routes associated with the Extractive use are identified within either the Key Resource Area or Local Resource Area
shown on Overlay Maps OM1.5-OM9.5.
Page 75 of 155
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.