Original source · versioned page text
2014-08-19 Planning & Organisation Committee Agenda - Pages 1-101
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 19 AUGUST 2014
Health and Safety
6. The development must not, at any time during the life of the development, result in
human exposure to environmental electromagnetic emissions exceeding the current
regulations, standards and/or recommendations of the Australian Radiation
Protection and Nuclear Safety Agency (ARPANSA). The carrier of the infrastructure
must provide, at any time upon request by Council, written certification to
demonstrate compliance with this condition. The written certification must assume:
a. a maximum number of users over the lifetime of any pole or other supporting
structure
b. full power usage
c. a maximum down tilt of antennae.
7. Warning information signs and security fencing must be provided on the site to
prevent unauthorised entry. Fencing must be camouflaged through the use of
colours, materials and screening vegetation to blend the fence into the visual
landscape.
Colours and Finishes
8. The monopole and associated panels must be finished in colours that blend in
visually into the landscape.
Cessation of Use
9. The telecommunications facility must be removed from the site upon cessation of the
use.
Landscaping Plan
10. Dense screening vegetation shall be established around the enclosure in accordance
with Council’s Policy on Landscaping Guidelines and a properly prepared landscape
plan. Such landscaping is to be completed prior to the commencement of the use
and maintained at all times thereafter. The Landscape Plan shall include at a
minimum:
a. Identify and retain all existing trees within a 100m distance around the fenced
compound area of the tower. Existing trees shall not be lopped or pruned below
their existing height.
b. Appropriately selected tree species and understorey plantings to achieve dense
visual screening of the tower and having regard to the soil conditions. Trees
included shall be able to achieve up to 20m in mature height, though inclusion
of fast growing species is also desirable to achieve early visual screening.
c. The planting areas should maximise the screening opportunities surrounding
the tower and include appropriate planting for a distance up to 20m beyond the
perimeter of the lease area, whilst maintaining access and electricity supply.
A development application for Operational Works shall be required in this
regard.
Roadworks
11. The developer must provide an access driveway extending from the end of the
existing driveway servicing 66 Mountain View Road to the site of the
telecommunications tower. The works must be undertaken in accordance with an
Operational Works approval and must include:
a. A formation sufficient to cater for the vehicle types expected during the
construction and operational phases of the development
b. An alignment that protects significant vegetation and minimises the effects on
the adjoining properties.
Page 8 of 155
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.