03.1 - Decision Notice s63
Attached to the e-mail Operational Works Application OPW21/0120 - DA Form 1, Plans, Civil Plans, Surveyor Plan, Certifier DA.
ATTACHMENT A
BUILDING CONDITIONS
1 1. HOURS OF WORK
Environmental Protec on Agency requires:
A builder or building contractor must not carry out building work on a building site in a way that makes or causes
audible noise to be made from the building work-
a) On a Sunday or public holiday, at any me; or
b) On a Saturday or business day, before 6.30am or a er 6.30pm.
2. SILT MANAGEMENT
Provision shall be made during the construc on phase to ensure that no silt, other building waste or soil leaves the
allotment. Reten on devices such as silt fences, straw bales or the like are required to be installed on-site.
3. ACCESS CHAMBERS
Where sewerage and stormwater access chambers occur on-site they are to remain visible at all mes. If an
access chamber is required to be altered in height to accommodate proposed site works, contact the relevant
Council’s Sewerage Department.
4. ACID SULPHATE SOILS
Where works are located within the Acid Sulphate Overlay, compliance with applicable Acid Sulphate Code applies.
Attachment A Ref: 00011210 Page 6 of 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.