ECM_22150383_v5_Pre-Lodgement Notes PLM22 0055
d. Council officers will need to engage geotechnical & hydrological engineer to peer
review the above mentioned reports, which will need to be paid for by applicant.
e. The pool and part of the building extends out beyond the coastal line which is not
the existing situation. This is not supported.
4. Confirmation of setback requirements to The Esplanade.
Comment: as per the coastal building line
a. There is no support for structures seaward of the coastal building line.
5. Other
a. The location of the new driveway may impact on the health of the existing Norfolk
Pine tree. It is recommended to include an arborist report with the application that
details recommendations for the location and construction of the driveway to ensure
the its roots and long term health is protected.
b. It is understood from the modelling shown that the existing roof top terrace is over
height. Please note that the roof top terrace approved in 2018 was conditioned as
follows:
Building Height
3. The maximum height of the development must not exceed 8 metres above the
finished ground level and the natural ground surface. In this regard the landing
balustrade to the roof terrace must be reduced in height to comply with this
condition.
This means that any modifications to the building should ensure the roof top terrace
complies with this approval. There is no support for the roof top terrace and
associated balustrade to exceed 8 metres.
Mark Lewis - Comments
1. Access.
a. The location and extent of the proposed new driveway will need to ensure that the
construction and ongoing use does not reduce the available carparking on the street
or negatively impact on the significant vegetation in the road reserve.
b. The extent of earthworks in the road reserve must be kept to the minimum required.
The finished levels must match smoothly with the adjoining verge areas. Please note
that Council will not support private retaining structures in the road reserve.
2. Stormwater and site stability.
a. The site is mapped in part as being effected by the landslide hazard overlay of the
Noosa Plan 2020. Stormwater runoff from the proposed development has the
potential to impact on the stability of the subject site and the adjoining lands. Any
application will need to include a stormwater management plan and a geotechnical
report which are consistent in regard to the recommendations for stormwater
collection and disposal.
6. INFRASTRUCTURE CHARGES
A request for written advice for an Infrastructure Charges Contribution Estimate relevant to
your proposal may be obtained for a fee.
7. FURTHER ADVICE TO BE SOUGHT
You are advised to contact Unitywater and any relevant Queensland Government Agencies
for their specific requirements in respect of your proposal.
This document is a record of prelodgement discussions and will not be made available for public viewing. Prelodgement
discussions are conducted to explore development options and requirements, identify issues and provide guidance to prospective
applicants about Council’s policies for development. The recorded discussion items and outcomes in no way imply or commit to
an approval of the proposal on the part of Council or Council officers, nor guarantee that all potential issues associated with a
development proposal have been raised / identified. When a formal development application is lodged, the proposal will be
assessed on its planning merits in accordance with Council’s policy framework existing at the time of the assessment.
Document Set ID: 22150383