Original source · versioned page text
ECM_21899255_v1_Information Request MCU22 0054
Attached to the e-mail Information Request MCU22 0054.
b. an on-site stormwater management system that is capable of servicing the proposed
development, and
c. stormwater and effluent management plans that are consistent with a site specific
geotechnical report
Issue
An emergency flood plan has not been provided.
Information Required
6. Provide an emergency flood plan that demonstrates how occupants will act in the event
of a flood event, cutting access to the township of Kin Kin and surrounding towns. The
emergency flood plan is to be prepared by a suitably qualified person.
3. DUE DATE FOR RESPONSE TO INFORMATION REQUEST
The due date for providing the requested information is 27th July 2022. Email your response
to [email protected]. Please advise Council of your response to this information request
in accordance with section 13 of the Development Assessment Rules.
If you do not provide a response before the due date, it will be taken as if you have decided
not to respond to the information request and Council will continue with the assessment of
your application.
4. OTHER DETAILS
You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online
Services” page can be accessed via "Quick Links" on the left hand side of the screen.
Should you have any further queries in relation to the above, please do not hesitate to contact
me on the number above.
Yours faithfully,
Nadine Gorton
Development Planner
Page 3 of 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.