240808 - Sprout As Consturcted 9 BARTLETT RD NOOSAVILLE INDUSTRIAL WAREHOUSES - REV D (002)
Original PDF page 5, section 1. The text section number identifies this passage in the reader.
CONSTRUCTION These hazards include the demolition of existing structures.
HAZARD CATAGORY DETAIL OF HAZARD RAW RISK LEVEL RECOMMENDED AND EXISTING REVISED RISK LEVEL ACTION
CONTROL MEASURES
C1 Adjoining Areas The site backs onto other industrial areas, potential for persons using Recommend that works are controlled and maintained within the Principal/Maintenance/Demolition Contractor
these areas to be injured. 4 site boundaries. 3
C2 Hazardous Cutting of masonry blocks, potential inhalation of silica. Recommend minimising dust exposure through recomendations Principal/Maintenance/Demolition Contractor
Substances 4 of the materials safety data sheet. 3
C3 Hazardous Exposure to chemical termite treatment. Recommend use of physical or low toxicity termite barriers where Principal/Maintenance/Demolition Contractor
Substances 4 appropriate. 3
C4 Hazardous Treated timber used in construction. Consider using less hazardous treated timbers. Follow material Principal/Maintenance Contractor
Substances 4 safety data sheet where appropriate. 3
C5 Hazardous VOC fumes from paints and other coatings. Recommend specifying the use of low VOC adhesives and Designer
Substances 3 finishes where possible. 1
C6 Structural Stability Construction of new steel and masonry structures, risk of potential Recommend provision of propping and support, obtain advice Principal/Maintenance Contractor
collapse. 4 from Structural Engineer as required. 3
Contractor to prepare a Safe Work Method Statement prior to commencing
C7 Work at Height High risk of falling as falls from a height greater than 2m are Principal/Maintenance Contractor
possible. 4 work. Provide edge protection to all roof and canopy edges to AS4994. 3
Provide roof safety mesh to AS4389.
Contractor to prepare a Safe Work Method Statement prior to commencing
C8 Confined Spaces Sewer and stormwater manholes, service pits; risk of entrapment and Principal/Maintenance Contractor
suffocation. 4 work. Only workers with confined spaces training are permitted to enter 3
confined spaces.
C9 Climatic Conditions Displacement of soil during a flood event. Ensure tanks are decomissioned and anchored down during potential flood Principal Contractor
4 events. Include in emergency plan. 3
C10 Earthworks Excavations for underground tanks and trenches, potential for Contractor to prepare a Safe Work Method Statement prior to commencing Principal Contractor
instability and collapse where depth exceeds 1.5m. 4 work. 3
C11 Manual Tasks Manual tasks associated with handling of large or awkward Contractor to prepare a Safe Work Method Statement prior to commencing Principal Contractor
construction elements. 3 work. Recommend mechanical assistance. 2
C12 Electrical Works on or near energised electrical installations are defined as Contractor to put in place a Safe Work Method Statement prior to Principal/Maintenance/Demolition Contractor
high risk construction work. 4 commencing works. 3
Temporary Plant - Works on or near mobile energised electrical
C13 Electrical Contractor to put in place a Safe Work Method Statement prior to Principal/Maintenance/Demolition Contractor
installations are defined as high risk construction work. 4 3
commencing works.
C14 Electrical Electrical pits located near hazardous zones, potential ignition Contractor to put in place a Safe Work Method Statement prior to Electrical Engineer
source. 4 commencing works. 3
C15 Fire and Emergency Egress from partially constructed building in an emergency. Recommend evacuation procedures are communicated in an Principal Contractor
4 emergency plan as per S43 WHS Regulation. 3
C16 Hazardous Installation and commisioning of fuel tanks. Refer detailed manufacturer instructions. Ensure works are compliant Client, Principal Contractor
Substances 4 with Sections 363-364 of WHS Regulations 2011 3
C17 Hazardous Installation of gas and fuel lines. Refer detailed manufacturer instructions. Recommend emergency Principal Contractor
Substances 4 response to gas is included in the emergency plan. 3
C18 Hazardous Fibre cement used in construction, potential risk of silica inhalation Follow the recommendations in the product safety data sheet including working in Principal Contractor
Substances (fibre cement selected for durability and maintenance). 4 a well ventialted area and personal protective equipment 3
C19 Hazardous Glass fibres and volatile organic compounds (VOC's) fumes from Recommend installing foil, polyester, natural or fibre bio-soluble insulation where Principal Contractor
Substances insulation. 4 possible. 1
C20 Mobile Plant Operation on uncompacted fill, potential for tipping. Geotechnical report available for reference. Principal Contractor
4 3
C21 Mobile Plant Operation of mobile plant over under ground tanks during Maintain exclusion zone around tanks during construction. Principal Contractor
construction, potential for collapse. 4 3
C22 Slips, Trips and Falls Tanks have the potential risk for falls where excavation exceeds 2m. Recommend the use of appropriate barriers. Manage risk of falls as per S.78 WHS Principal Contractor
4 Regulation. 3
REV DESCRIPTION DRAWN DATE
project drawing
A BUILDING APPROVAL AC/NN 03/08/22
B BUILDING APPROVAL AC/NN 12/08/22 Suite 2, Suncoast Resort Business Centre PROPOSED NEW INDUSTRIAL SAFETY IN DESIGN REPORT 2
C
D
BUILDING APPROVAL
B.A - AS BUILTS FOR CERTIFICATION
KT/AC
NN
13/09/22
08/08/24
Cnr Gardak Street
SUNCOAST & Surf Road
RESORT BUSINESS CENTRE WAREHOUSES
Alexandra
SUITE 2 Headland Q 4572
CNR GARDAK ST & SURF RD Copyright of this document remains the exclusive
for property of SPROUT ARCHITECTS PTY LTD
POALEXANDRA HEADLAND
Box 6232, Maroochydore BC Q 4558 Qld 4572 ABN 23 123 917 724.
PO BOX 6232 MAROOCHYDORE BC Qld 4558 OLD SEA DOG 9 PTY LTD date 8/08/2024 drawn KT/AC scale AS SHOWN Contractors are to verify all dimensions and levels on
P PH
07 :5443 5028
07 5443 F 07 5479 2380 | ABN
5028 FAX:07235479
123 917
2380724 at
@ A1
site prior to commencing. Report all discrepancies to
[email protected]
ABN | sproutarchitects.com.au
23 123 917 724 9 BARTLETT ROAD NOOSAVILLE QLD
the Architect. Use figured dimensions in preference
to scaled.
EMAIL: [email protected] drawing no. 21015 CD10.04 revision D
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.