Minor Change Existing Approval - OPW24 0125 01 (As Published) · OPW24/0125.01
4. ASSESSMENT MANAGER CONDITIONS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
C101 1 Project Notes – Sheet 1 22 January 2025
Prepared by STP Consultants
C102 1 Project Notes – Sheet 2 22 January 2025
Prepared by STP Consultants
C103 1 Demolition Plan & Tree Removal Plan 22 January 2025
Prepared by STP Consultants
C104 1 General Arrangement Plan 22 January 2025
Prepared by STP Consultants
C105 1 Site Sections – Sheet 1 22 January 2025
Prepared by STP Consultants
C106 1 Site Sections – Sheet 2 22 January 2025
Prepared by STP Consultants
C201 1 Earthworks Stripping Plan 22 January 2025
Prepared by STP Consultants
C202 1 Earthworks Management Plan 22 January 2025
Prepared by STP Consultants
C301 1 Finished Levels Plan – Sheet 1 22 January 2025
Prepared by STP Consultants
C302 1 Concrete Jointing Plan 22 January 2025
Prepared by STP Consultants
C303 5 Access Track Setout Plan 16 July 2025
Prepared by STP Consultants
C304 1 Access Track Longitudinal Section 22 January 2025
Prepared by STP Consultants
C305 1 Access Track Cross Sections – Sheet 1 22 January 2025
Prepared by STP Consultants
C306 1 Access Track Cross Sections – Sheet 2 22 January 2025
Prepared by STP Consultants
Page 2 of 16
Document Set ID: 23995807
Version: 4, Version Date: 05/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - OPW24 0125 01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 195 KB (small file)
- File type
No other editions are linked here.