C307 5 Proposed Crossings Layout and Details Plan 16 July 2025
Prepared by STP Consultants
C308 5 Proposed Passing Lane & End of Fire Track 16 July 2025
Layout Plan
Prepared by STP Consultants
C309 1 Finished Levels Plan – Sheet 2 22 January 2025
Prepared by STP Consultants
C310 1 Finished Levels Plan – Sheet 3 22 January 2025
Prepared by STP Consultants
C311 1 Finished Levels Plan – Sheet 4 22 January 2025
Prepared by STP Consultants
C312 1 Finished Levels Plan – Sheet 5 22 January 2025
Prepared by STP Consultants
C313 1 Finished Levels Plan – Sheet 6 22 January 2025
Prepared by STP Consultants
C314 1 Finished Levels Plan – Sheet 7 22 January 2025
Prepared by STP Consultants
C315 1 Finished Levels Plan – Sheet 8 22 January 2025
Prepared by STP Consultants
C401 1 Stormwater Management Plan 22 January 2025
Prepared by STP Consultants
C402 1 Stormwater Longitudinal Sections 22 January 2025
Prepared by STP Consultants
C403 1 Absorption Trenches Layout & Details Plan 22 January 2025
Prepared by STP Consultants
C702 2 Miscellaneous Details Sheet 2 11 July 2025
Prepared by STP Consultants
C703 2 Miscellaneous Details Sheet 3 11 July 2025
Prepared by STP Consultants
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 6 January 2027, unless an application to extend the currency period
is approved by Council.
Page 3 of 16
Document Set ID: 23995807
Version: 4, Version Date: 05/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - OPW24 0125 01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 195 KB (small file)
- File type
No other editions are linked here.