Skip to the record
Accept no substitutions.

Council archive · source document

19 Viewland Drive Final Renovation Plans Stage 16 · OPW19/0180

Attached to the e-mail Operational Works Application OPW19/0180 - DA Form 1 - Supporting information document - Plans - Plans - Arborist Report - at 19 Viewland Drive Noosa Heads.

of 16

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                                                                                                                                                                                                                                                   GENERAL NOTES


19 viewland drive, noosa heads 4567
                   lot 8 on RP88535
                                                                                                                                                                                                                                                   TIMBER FRAMING AND CONSTRUCTION
                                                                                                                                                                                                                                                   1. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH
                                              RAINFALL CATCHMENT AREA - 232.75SQM
                                                                                                                                                                                                                                                   THE AUSTRALIAN DOMESTIC BUILDING CODE.
                                              DOWNPIPE TYPE AND GUTTERING TO BE CONFIRMED BY OWNER/BUILDER
                                                                                                                                                                                                                                                   2. ALL TIMBER FRAMING TO BE IN ACCORDANCE WITH
                                              LOCATION AND REQUIRED DOWNPIPES TO BE CONFIRMED BY BUILDER
                                                                                                                                                                                                                                                   AS 1684.2 2010 RESIDENTIAL TIMBER FRAMING MANUAL.
                                                                                                                                                                                                                                                   3. PINE FRAMING TO BE MINIUMUM STRESS GRADE
                                                                                                                                                                                                                                                   MGP 10/MGP12
                                                                                                                                                                                                                                                   4.HARDWOOD FRAMING TO BE MINIMUM STRESS
                                                                                                                                                                                                                                                   GRADE F14 & MINIMUM JOINT GROUP J2.
                                                                                                                                                                                                                                                   5. TIMBER FOR TRUSSES TO BE MINIMUM JOINT GROUP JD4.
                                                                                                                                                                                                                                                   6. TRUSSES TO BE FIXED IN ACCORDANCE WITH MANUF.
                                                                                                                                                                                                                                                   SPECIFICATIONS ALL OTHER FIXINGS TO BE IN
                                                                                DP                                                                                                                                                                 ACCORDANCE WITH AS 1684.2 2010
                                                                                                                                               DP                                                                   DP                             7.LAMINATED BEAM SIZES BASED ON HYNEBEAM SPAN
                                                                                                                                                                                                                                                   TABLES WHERE OTHER BRANDS ARE USED, SIZES TO




                                                                                              600




                                                                                                                                                                                                           600
                                                                                                                                                                                                                                                   BE CONFIRMED WITH MANUFACTURERS SPECIFICATIONS.
                                                                                                                                                                                                                                                   8. ALL DIMENSIONS TAKE PRECEDENCE OVER SCALES
                                                                                                                                                                                                                                                   9. BUILDER AND TRADES ARE TO CONFIRM ALL
                                                                          600        solar tube                                                                                                                                                    MEASUREMENTS, DETAILSAND SPECIFICATIONS PRIOR TO
                                                                                                                                                                                                                                                   SETOUT AND ORDERING OF MATERIALS




                                                                                                              8.00°
                                                                                                                                                                                                                                                   10. ANY ERRORS ARE TO BE ADDRESSED TO THE DESIGNER
                                                                                                                                                                         solar tube                                                                AS NO RESPONSIBILITY WILL BE TAKEN AFTER
                                                                                                                                                                                                                         600




                                                                                                                                             8.00°
                                                                                                                                                                                                                                                   CONSTRUCTION HAS COMMENCED
                                                                                                                                                                                                                                                   11. ALL TRADES ARE TO CONFORM WITH THE
                                                                                                                                                                                                                                                   CURRENT AUSTRALIAN STANDARDS RELATING TO HIS OR
                                                                                                                                                                                                                                                   HER OWN WORK
                                                                                                                                                                                                                                                   12. TERMITE PROTECTION TO BE PROVIDED AS PER AS
                                                                                                                                                            solar tube                                                                             3660.1.2000

                                                                                                                                                                                                                                                   DOMESTIC SMOKE ALARMS




                                                                                                             8.00°
                                                                                                                                                                                                                                                   1. ALL BEDROOMS AND HALLWAYS ARE TO BE INSTALLED
                                                                                                                                                                                                                                                   WITH PHOTO ELECTRIC SMOKE ALARMS IN ACCORDANCE
                                                                                                                                                                                                                                                   WITH BUILDING FIRE SAFETY LEGISLATION AMENDMENT
                                                                                                                                                                                                                                                   REGULATION 2016
                                                                                                                                                                                                                                                   2. SMOKE ALARMS MUST BE POSITIONED IN ACCORDANCE
                                                                                                                                                                                                                                                   WITH AS 1670.6 - 1997 FIRE DETECTION, WARNING, CONTROL
                                                                                             600




                                                                                                                                                                                                                                                   AND INTERCOM SYSTEMS.
                                                                                                                                                                 solar tube                                                                        3. DEVICES MUST BE EITHER INTERCONNECTED OR HARD
                                                                                DP                                                                                                                                                                 WIRED (EXISTING DWELLINGS ONLY) THAT CANNOT BE
                                                                                                                                                                                                                                                   REMOVED FROM DEVICE
                                                                                                                                                                                                                                                   4. ALARMS TO BE INSTALLED IN ALL HALLWAYS AND
                                                                                                                                                                                                                                                   BEDROOMS TO EXISTING RESIDENCES
                                                                                                                                                                                                                                                   S INDICATES THE LOCATION OF WIRED SMOKE ALARMS

                                                                                                                                                                                                                                                   GLAZING
                                                                                                                                                                                                                                                   1. DOOR AND WINDOW SCHEDULE IS INDICATIVE ONLY AND
                                                                                                                                                                                                                         600                       SUBJECT TO CONFIRMATION UPON SITE MEASURE




                                                                                                                                                                              13.00°
                                                                                                                                                                                                                                                   2. OBSCURE WINDOW NOTATION REFERENCE ONLY, CLIENT
                                                                                                                                                                                                                                                   TO CONFIRM WITH BUILDER AND WINDOW SUPPLIER FOR
                                                                                                                                                                                                                                                   PRIVACY OPTIONS

                                                                                                                                                                                                                                                   ELECTRICAL AND ENERGY EFFICIENCY
                                                                                                                                                                                                                                                   1. ELECTRICALS TO BE CONFIRMED BY OWNER/BUILDER
                                                                                                                                                                                                                                                   AND ELECTRICIAN, PROPOSED PLAN IF REQUESTED
                                                                                                                                                                                                                                                   INDICATIVE ONLY




                                                                                                                                                                                                                                 downpipe to run
                                                                                                                                                                                                                                 through deck
                                                                                                                                                                                                                                                   DOWNPIPES
                                                                                                                                                                                                                                                   ALL LOCATED DOWNPIPES INDICATIVE ONLY AND
                                                                                                                                                                                                                   DP
                                                                                                                            DP                                                                                                                     CONFIRMED AT TIME OF ROOFING CONSTRUCTION
                                                                                                                                                                                                                                                   AND COMPLIANCE
                                                                                                                                                                                         DOWNPIPE LOCATIONS ARE SUGGESTED ONLY
                                                                                                                                                                                         ROOF DESIGN AND BUILDER TO CONFIRM




                                                                                                                                                                                                                                                                                             roof plan
                              NOTE: INSTALLATION OF ALL EXTERNAL MATERIALS BY BUILDER AS PER MANUFACTURERS SPECIFICATIONS AND CERTIFICATION REQUIREMENTS AS OUTLINED BY NCC

                               PROPOSED:                                               CLIENT: RON O'GRADY BUILDER:                                                                    MANDY'S DESIGN & DRAFTING SHEET: 16 of 16 DATE:                                   ISSUE NO:
                               RENOVATION EXTENSION                                    PH: 0417 602 074    TBC                                                                         PH: 0403 481 474          SCALE: 1:100 14 AUG 2019                                P -FINAL
                               NOTE: THESE DRAWINGS TO BE READ IN CONJUNCTION          NOTE: BUILDER TO CONFIRM SITING AND DIMENSIONS BEFORE CONSTRUCTION
                               WITH ENGINEERS DRAWINGS                                 RESPONSIBILITY LIES THERE WITH

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

19 Viewland Drive Final Renovation Plans Stage 16.pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.