Original source · versioned page text
RFI - Attachment 3 - Updated Landscape OPW Plans
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPROPOSED INDUSTRIAL DEVELOPMENT LANDSCAPE - OPERATIONAL WORKS LOT 252 ON SP104257 FOR DEVCON CAPITAL 9PTY LTD 11 LEO ALLEY ROAD, NOOSAVILLE Development Application No. TBC 2S Consulting Civil & A Structural Engineers COVEY Project Management ASSOCIATES PTY LTD ABN 59 137 305 992 & Planning PROJECT No. 192297 - FOR OPW ISSUE: D PROJECT MANAGER: MARK CUMMING PH - 07 5443 7777 LANDSCAPE ARCHITECT: JASON COLLETT PH - 07 5443 7777 Sheet List Table Sheet Number Sheet Title L000 Cover Sheet LOOT Extent of Works L100 Landscape Plan L101 Landscape Plan L102 Landscape Buffer Plan L200 Landscape Details L201 Landscape Details NEARMAP 2019 LOCALITY PLAN N.T.S.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 6 pages
Page 2
INTERNAL PLANTING
Install 2 selection of shrub
and groundcover species to
soften and screen built
form within the
development. 100ltr
advance stock trees are
to be planted utilising
subsurface soil cells to
provide a minimum soil
volume of 4m> per tree
LANDSCAPE BUFFER PLANTING
install @ mix of shrub and groundcover
species within the 3m wide easement
areas, Install large tree species outside
of easement areas as per loactions
noted on plans.
Refer to Landscape Plan L102 for
planting extents and plant schedules.
UNIT 9
planting
ENTRANCE PLANTING
Install @ Hered mix of shrub and groundcover species
to screen the front fencing of the development. 100\tr
advance stock trees are to be planted to provide
canopy screening to development frontage
2 s & &
—
SCALE 1:250 (A1)
PROJECT SCOPE
Landscape
Soil Test 1
Imported Top Soil to 100\tr trees (4m* per tree) 28m?
100mm Imported Top Soil to all turf areas (allowance) 9m?
300mm Imported Top Soil to all planting beds 55m?
100mm Imported Top Soil to buffer planting areas 50m?
Verge turf (allowance) 87m?
Temporary turf to biobasin floors 49m?
400mm depth organic mulch all planting areas 19m?
50mm depth straw mulch to Biobasin floors 25m?
Jute mesh to Biobasin floors 49m?
Coir mesh to biobasin batters 28m?
100mm depth mulch to buffer planting areas 50m?
200mm pots to planting areas (shrub species)
140mm pots to planting areas (groundcover species)
75mm tubes to Biobasin floors (macrophyte species) 291
75mm tubes to buffer planting areas 780
Edge Type 1 - as per detail 161m
Landscape and Biobasin Works Establishment and Maintenance Period
Establishment Period 3 months
Maintenance Period: 39 months
It is the Contractors responsibility to ensure that landscaping works are maintained throughout the
maintenance period.
Vandalism or unforseen damage to landscapes may be quoted separately prior to ‘Off-Maintenance’
Other
Provide Arborist AS2303:2018- Tree Stock for Landscape Use certification for all trees
Provide soil amelioration certificate from qualified Agronomist
Provide AS4419 compliance certificate for all imported soil
Exclusions to Landscape Scope
Retaining Walls
Bulk shaping of earthworks & fill
Stormwater inlets/outlets to Bio-basin
SCOPE OF WORKS
Landscape works to include the following
* Site preliminaries
* Top soil soil test and analysis
* Excavation and drainage to planting areas
* Supply and install subsurface soil cells
© Topsoil supply and placement
© Turf supply and lay
* Bio basin - removal of sacrificial turf and install of macrophyte species
as per documentation
* Containerised plant material - supply and installation
* Organic mulch - supply and installation
* 3 month establishment of landscape works
month establishment of biobasin
month maintenance of landscape works
month establishment and maintenance of bio basin
. Attendance at Council pre-start, On and Off-Maintenance meetings
Contractor shall take full account of documentation of Civil Engineering, Hydraulic and Electrical
Engineering Works.
SITE PRELIMINARIES
Contractor to confirm planting boundaries / extent of works / loading / handling areas etc prior to
commencement. Contractor to attend pre-start meeting with Superintendent and Council.
Subsurface soil cell system is subject to detail design - to be installed strictly under
supervision/guidance from Manufacturer.
Suggested Manufacturer: City Green Tel. 1300 066 949 Web. https://citygreen.com/
Check oll dimensions before commencement of work.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR Check Site boundary dimensions from the Title plans
TO CONTACT THE RELEVANT AUTHORITIES TO Check Building Boundary clearances by set out.
CONFIRM THE LOCATION OF ALL EXISTING SERVICES Notwithstanding the information supplied on this drawing,
PRIOR TO THE COMMENCEMENT OF EXCAVATION the location, depth and extent of underground or overhead}
services are to be confirmed and protected on site by the}
contractor prior to commencement of works.
Checked - JO
Design JC Drawn - JC D [16-02-21] COUNCIL RFI — FOR APPROVAL aC
© |5=11-20 [DESIGN ANENDWENTS — FOR APPROVAL [JC
Seales - 1:250(A1) Date - DEC 2019 [rs is-as-2o) sesieN AVENOWENTS — FOR APPROVAL [J6
1 [19-12-19] APPROVAL ISSUE uC
Document Stage — oPW —
Issue Date Description By
‘Approved 7 .
a& Consulting Civil & Drawing title — Project - PROPOSED INDUSTRIAL Site - Project 192297 Sheet No. L001
« Structural Engineers | KEVIN COVEY Béng,cPEng MEAustMSPEPNG,RPEO-18231 Extent of Works COMPLEX 11 LEO ALLEY ROAD Digital Ref : Wot Eten ot Wors Issue: D
CcCOoOVves CHRIS CAMP BEng(Hons),MIEAust,RPEQ—4944
Project Management] 124 puPORTH AVENUE Ph (07) 5443 7777 Client - DEVCON CAPITAL 9 PTY NOOSAVILLE This Document is copyright and shall not be copied
ASSOCIATES PTYLTD 3 pignnin PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
ABN 59 137 305 992 9 WAROOCHYDORE QLD 4558 LTD for the Development and the Site Specifie
: [email protected]
c:\12dS\data\ 12DSERVER\192297_280\DWG Covey\Landscape\OPW\LOO1 Extent of Works.dwg
Page 3
2 SYZ BC
- 15m spacing
so
iP
2 BAN rob =
No tree planting within
services easement e
UNIT
15
ssl
S —
~Y
K — WW
Swhl WN —
~ WN
|
wy = 4.BAE vie NN 4 4 4 + + 4 + 4
+ =A) 10 JUN usi Ww
ALIS A= underplanting SNe. FOPERTY BODO
C Cp BAraaxara
1 ye oY
Refer to Engineer's
Documentation for all iF
™
Bin storage
retaining wall details 3! <4 e - refer to Architect's documentation for
and specifications § L E gate and wall details and specifications
Refer to Engineer's Documentation for all
retaining wall details and specifications
UNIT 2
3 ALP cae
r 1 CUP ana
I \\ = 100ltr
yf
5 LOM SH \ 2 BAN rob
(underplanting) <e 2 BAE vir
3 ALP cae I, < |
J
EB ]
Ss 3 ALP cae
7 5 LOM SH
(underplanting) 30 LOM SH
(underplanting)
2 BAN rob
Indicative extent of soil cells to be installed below hardstand
ePi Ensure all road base has been removed (ashed red line),
from planting area - existing-subgrade To provide minimum 4m? soil volume per 100ltr tree planting.
to be decompacted no less than 150mm Refer to L201 indicative detail - subject to final detail design
depth prior to installing topsoil.
Refer to Civil Documentation for edge
thickening detail pertaining to building
UNIT 1 footing/slab.
3 SYZ Pl 3 - 24 LOM SH D
= 850mm spacing g y— 9 JUN usi [ (underplanting)
3 ES LOM hys 4MEL qui
3 AUS dul ES. | ! dee = underplanting - 100ltr
i
2 MEL qui . 3 ALP
= 1001tr ~ ~ 3 XAN ful 2 AUS dul ae
| —
Install Coir mesh ! 3 BAN rob — 4 = 1 BAN rob
to biobasin batters S Refer to Engineer's Documentation
- 9m? ~ 5 MYO ell 5 for wall specifications and details
(underplantlag) = A
x we
3 ALP cae \ naa _é< ~ S 3 XAN ful
3 BAN rob _ _ =
i A i = 10 LOM SH
“fog sPROPERTY, BQUNDARY? f+ PE 10 LOM NY
Biobasin Planting - 13m? Sete ener ee hep pe Ar es 3 MYO ell
Planting at 6/m? St TD XAN fullste f Ay (underplanting) 12.20 ledge planting)
MEIC nod - 15% HR cata a atta pat etat etal tat Tele Pit
11 JUN usi - 15% TP ALP cae oh Ps VY 1 CUP ana Edge Type 1 - refer to detail
° fetta ee RP ~ 100ltr
53 LOM hys - 70% sata rarest aap
M bys Pet Edge Type 1th Reinstate all areas of turf damaged
Refer to Engineer's as pefer to detail * + 28 LOM SH during construction works to frontage
i ate ete
Documentation for all Pare aT” fedge planting)
retaining wall details Nate Refer to Engineer's Documentation for
and specifications "sss cross-over details and specifications
NOTE:
LEO ALLEY ROAD Due to service constraints (subsurface services, ENERGEX
requirements for PMT infrastructure) street trees are unable to be
planted within the road reserve.
\
Buffer planting within services easement
- refer to Landscape Plan L102 for
easement extents and planting details
Bio Basins - Plant Schedule - Total Area = 49m2
Landscape Plant Schedule
CODE BOTANICAL NAME COMMON NAME SIZE NO. CODE BOTANICAL NAME
Trees FIC nod Ficinia nodosa
BAN int Banksia interifolia Coastal Banksia 100ltr 1 [JUN usi Juncus usitatus
CUP ana Cupaniopsis anacardiodes Tuckeroo root 3 ILOM hys Lomandra hystrix
MEL qui_ Melaleuca quinquernervia Paper Bark 100ltr 3
Total z
Alpinia caerulea
Austromyrtus dulcis
Baeckea virgata
Banksia robur
Banksia spinulosa
|AUS dul
BAE vir
BAN rob
BAN spi
SYZ BCs
Syzygium australe ‘Bush Christmas’
Syzygium australe ‘Pinnacle’
Midyim
Twiggy Myrtle
Swamp Banksia
Hairpin Banksia
Syzygium Bush Christmas
Syzygium Pinnacle
Native Ginger
COMMON NAME SIZE NO.
Knobbly Clubrush 75mm tube hh
Common Rush 75mm tube hh
Matt Rush 75mm tube 203
Total tube 291
200mm B
200mm 4
200mm 2B
200mm 10
200mm 8
and Groundcovers
Juncus usitatus
Lomandra hystrix
Grasses
JUN usi
LOM hys
LOM NY
LOM SH
MYO ell
XAN ful
Myoporum ellipticum
Xanthorrhoea fulva
Lomandra longifolia ‘Nyalla’
Lomandra fluviatilis ‘Shara’
Mat Rush
Lomandra Nyalla
Lomandra Shara
Coastal Boobialla
Common Rush,
Coastal Grass Tree
1h0mm Ey
1h0mm 160
140mm 2
140mm 8
NOTE: All 100ltr tree planting to be installed with
a minimum root soil volume of 4m? as per Noosa
Council Decision Notice Condition 10f. dated ‘1st
November 2019.
SCALE 1:100 (A1)
IT_IS THE RESPONSIBILITY OF THE CONTRACTOR
TO CONTACT THE RELEVANT AUTHORITIES TO
CONFIRM THE LOCATION OF ALL EXISTING SERVICES
PRIOR TO THE COMMENCEMENT OF EXCAVATION
Check all dimensions before commencement of work.
Check Site boundary dimensions from the Title plans
Check Building Boundary clearances by set out.
Notwithstanding the information supplied on this drawing,
the location, depth and extent of underground or
overhead services are to be confirmed ond protected on
site by the contractor prior to commencement of works.
0 [16-00-21] COUNOIL RAT = FOR APPROVAL &
[5-11-20 | DESIGN AVENOWENTS ~ FOR APPROVAL [JC
3 [1-03-20] DESIGN AVENOMENTS — FOR APPROVAL [JC
7 [19-12-15] FOR APPROVAL ic
Issue Date Description By
—
Drawing title —
LANDSCAPE PLAN
Project —
PROPOSED INDUSTRIAL
COMPLEX
Client -
DEVCON CAPITAL 9 PTY
LTD
Site -
11 LEO ALLEY ROAD
NOOSAVILLE
aN Structural Engineers
COVEY Project Management
ASSOCIATES PTY LTD
ABN 59 137 305 992 & Planning
Consulting Civil &
124 DUPORTH AVENUE
PO BOX 16 MAROOCHYDORE QLD 4558
E-MAIL: [email protected]
Ph (07) 5443 77 Fax (07) 5443 7577
Approved:
KEVIN COVEY Béng, CPEng, MIEAust, MSPEPNG, RPEQI823
CHRIS CAMP BEng(Hons), MeAust, RPEQ4944
—
Checked : JO
as noted
Drawn: JC
DEC 2019
Design : JC
Date :
OPW
L100
sue: D
This document is copyright and shal not be copied without
written approval, nor shal it be used except for the yy
Scales :
Document Stage :
Project : 192297 Sheet No.
Digital Ref : 101 Landscape Plen
development and the site specified.
Page 4
3 ALP cae
~
1 BAE vir
2 XAN
ful
Refer to Engineer's Documentation for all
retaining wall details and specifications
5 SYZ Pl
~ at 850mm spacing
|__/ paopenry eounDany
Large tree species within buffer planting
- refer to Landscape Plan L102 for
planting extents and species
Buffer planting within services easement
- refer to Landscape Plan L102 for
planting extents and species
UNIT 10
12 LOM NY 2 AUS dul
12 LOM SH 3 ALP cae
{underplanting) 1 XAN ful
ul
8 LOM SH
(underplanting} |
g
Ir ees
T
3 ALP cae 6 LOM NY 3 ALP cae 6 LOM NY 3 ALP cae 5 LOM NY 2,BAN reb
3 ALP cae 1 XAN ful
a ys
2 BAN rob BB (vatter_UnGePplan fing!
1 XAN ful 3 ALP cae 3 ALP cae 12 LOM NY 20 LOM hys
12 LOM SH (batter underplanting
6 LOM NY 6 LOM NY 6 LOM NY i
6 LOM SH é (underplanting) 2 BAN rob 2 BAN spi
(underplanting) F 5 SYZ BC 1 AUS dul
CT CT CT
- 15m spacin
|_| || [ pacing TXAN ful
Aa ——— i = Li! Biobasin Planting - 36m?
SS al al 4 Planting at 6/m?
r 33 FIC nod - 15%
4 33 JUN usi - 15%
Bil UNIT 18 UNIT 19 UNIT 20 UNIT 21 4 150 LOM hys - 70% 3 BAN spi
1
R 6 LOMNY SS J
N\ 4 3 XAN ful
3 ALP cae ‘undecatartig! : Install Ci ht
TN stomny — 272erPlanting) UL e i biobasin batters. 19m
Lf i i i I 2 XAN ful ~
1 XAN ful 1 AUS dul
2 BAN rob 3 ALP cae 6 LOM NY 3 ALP cae 6 LOM NY 2 BAN spi
1 =
1 BAN int Lp 4 F
= 1001tr ul a
12 LOM NY 3 ALP cae 3 ALP cae 3 ALP cae 3 ALP cae 3 AUS dul
12 LOM SH 4 .
| (underplanting} OXAN ful a 6 LOM NY 6 LOM NY 5 LOM NY 8 LOM SH 2 BAN spi, 6 LOM hys
S 5 1 funderplanting) (underplanting)
= Fal TL im TL Vea |
~ 1 XAN ful ce f
UAT t
43.4 a 4 ALP) |
Indicative extent of soil cells to be installed below hardstand :
Ensure all road base has been removed [dashed red line). UNIT 13 iv UNIT 12 UNIT 11
from planting area - existing subgrade To provide minimum 4m? soil volume per 100ltr tree planting ’
han-150mm — : ,
to be decompacted no less tH Refer to L201 indicative detail - subject to final detail design. iT AT
depth prior to installing topsoil.
Refer to Civil Documentation for edge
thickening detail, pertaining to building UNIT 16 UNIT 15 UNIT 14
3 footing/slab. check al vet ork
eck al fore of work.
s gE 5 & TIS THE RESPONSIBILTY OF THE CONTRACTOR Check Ste boundary dimension from the Tite plans
—— TO CONTACT THE RELEVANT AUTHORITIES TO Notwthstondiey the information suapled on this dra
CONFIRM THE LOCATION OF ALL EXISTING SERV CES | ee eee eee ee round or overt ad
SCALE 1:100 (A1) PRIOR TO THE COMMENCEMENT OF EXCAVATION “cation, depth and extent of underground or overnea
sa services are to be confirmed and protected on site by the|
contractor prior to commencement of works.
Approved . ‘,
Checked - JO S Consulting Civil & Drawing title - Project - PROPOSED INDUSTRIAL Site — Project 192297 Sheet No. L101
Design - JC Drawn - JC D [16-02-21] COUNCIL RA — FOR APPROVAL se « Structural Engineers | KEVIN COVEY Béng.cPEng MEAustusPePNc.RPeo-1823 | | andscape Plan COMPLEX 11 LEO ALLEY ROAD Digital Ref : U0" Landa Pon Issue: DD
. ‘C [5-11-20 | DESIGN AMENDMENTS — FOR APPROVAL [JC OVEY CHRIS CAMP BEng(Hons),MIEAust,RPEQ—4944 ~
Seales - 1:100(M) Date - DEC 2019 5 a-a5-z0) besienAvENOMENTS = FOR APPROVALS Cc Project Management] 124 puPORTH AVENUE Ph (07) 5443. 7777 Client - DEVCON CAPITAL 9 PTY NOOSAVILLE This Document is copyright and shall not be copied
‘A | 19-12-19] FOR APPROVAL lic | ASSOCIATES PTY LTD i PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
Document Stage — oPW ABN 59 137 305 oe2 Planning MAROOCHYDORE QLD 4558 LTD for the Devebpment ond the Site Specified.
issue Date Description By E-MAIL: [email protected] P Ps .
c:\12d8\data\\120SERVER\\192297_280\DNG Covey\Landscape\OPW\L'0’ Landscape Plan.dwg
Page 5
UNIT &
UNIT 3
aWM
SANS
A
UNIT 2
“UNIT I
=, er. =,
Pn]
iE
Wo pldhting within 1
pro
Refer to Landscape Plans L100 &
L101 for internal planting details
UNIT S UNIT 6 UNIT # UNIT 8 UNIT 9 UNIT
f 1 f 1 f 1 f 1 I 1 1
Refer to Landscape Plan L101
for biobasin planting details
a
D
in| Loa Lea} ef)
Seles 5 = 5 St
UNIT 17 UNIT 19 UNIT 2
3
Sm, wide easement
eo
in
3m_ width
Te
UNIT 16
at
UNIT
Mix B Buffer Planting
14 UNIT 1 UNIT 12
oe
ESERIES
m of services
1 MEL qui
1 COR tes
Mix A Buffer Planting
TREE PLANTING SCHEDULE
1 COR cit
1 MEL qui
LS
1 EUC mic
TyP.8m spacing
3m wide sewer easement
(red dashed line)
Refer to Landscape Plans L100 &
L101 for internal planting details
\ Refer to Landscape Plans L100 &
L100 for internal planting details
Refer to Landscape Plans L100 &
L101 for internal planting details
1 MEL qui
CODE BOTANICAL NAME COMMON NAME SIZE NO.
Trees — as indicated on plans
COR cit Corymbia citriodora Spotted Gum 25itr 1
COR tes Corymbia tessellaris Moreton Bay Ash 2sitr 1
IEUC mic Eucalyptus microcorys Tallowwood 25ttr 1
LOP sua Lophostemon suaveolans Swamp Box 2site 1
MEL qui Melaleuca quinguenervia Paperbark 2sttr 3
Total 7
LOCATION A BUFFER PLANTING SCHEDULE 325m?
CODE BOTANICAL NAME COMMON NAME SIZE NO.
Shrubs - to be planted at 1 per 2m’
ALP cae Alpinia caerulea Native Ginger 75mm tube 8
BAN rob Banksia robur Swamp Banksia 75mm tube 2
DOD tri Dodonea friquetra Native Hop Bush 75mm tube 2%
HOM nut —Homolanthus nutans Bleeding Heart 75mm tube 8
IMAC tan Macaranga tanarius Bullock Heart 75mm tube 4
MEL pac Melaleuca pachyhylla Wallum Bottlebrush 75mm tube 2
MEL vim Melaleuca viminalis Weeping Bottlebrush 75mm tube 2
MEL aff Melastoma affine Lasiandra 75mm tube 18
Total 162
Groundcovers - to be planted at 1 per 1m?
cis ant Cissus antartica Water Vine 75mm tube 35
GAH sie Gahnia sieberiana Saw Sedge 75mm tube 60
HIB sca Hibbertia scandens Guinea Flower 75mm tube 35
JUN usi Juncus usitafus Common Rush 75mm tube 60
LOM hys — Lomandra hystrix Mat Rush 75mm tube 60
MYO ell — Myoporum eltipticum Coastal Boobialla 75mm tube 35
XAN ful___Xanfhorrhoea fulva Coastal Grass Tree 75mm tube 40
Total 325
LOCATION B BUFFER PLANTING SCHEDULE 170m?
CODE BOTANICAL NAME COMMON NAME SIZE NO.
Shrubs - to be planted at 1 per 2m’
ALP cae Alpinia caerulea Native Ginger 75mm tube 5
BAN rob Banksia robur Swamp Banksia 75mm tube 18
DOD tri Dodonea triquetra Native Hop Bush 75mm tube 2
IMAC tan Macaranga tanarius Bullock Heart 75mm tube 10
MEL pac Melaleuca pachyhylla Wallum Bottlebrush 75mm tube 16
MEL aff | Melastoma affine Lasiandra 75mm tube 1h
SYZ AB’ Syzygium australe ‘Aussie Boomer’ Syzygium Aussie Boomer 75mm tube 5
SYZ.CA°_ Syzygium australe ‘Cascade’ Syzygium Cascade 5mm tube 16
Total 116
Groundcovers - to be planted at 1 per 1m*
cis ant Cissus antartica Water Vine 75mm tube 20
GAH sie Gahnia sieberiana Saw Sedge 75mm tube 34
JUN usi Juncus usitatus Common Rush 75mm tube 34
LOM hys — Lomandra hystrix Mat Rush 75mm tube 34
MYO ell Myoporum ellipticum Coastal Boobialla 75mm tube 20
XAN ful__Xanthorrhoea fulva Coastal Grass Tree 75mm tube 28
“hedging species - spacing indicated on plans
Total 170
ew Check all dimensions before of work.
Refer to | 4 ee 2 £ & & | IT IS THE RESPONSIBILITY OF THE CONTRACTOR Greek A joudery dimeeions fron the Tile plans
Landscape Plan, OBS —_——— el MS CONTACT a RELEVANT AUTHORITIES 10 Notwithstanding the information supped on this drowing,
Lio for bebe ® Cd. SDnn 00 tt CONFIRM THE LOCATION OF ALL EXISTING SERVices. | (oti iw mimo omic to
planting details 4 ; . services are to be confirmed and protected on site by the
contractor prior to commencement of works.
‘Approved 5 .
Checked - JO nN Consulting Civil & Drawing title Project - PROPOSED INDUSTRIAL Site — Project 192297 Sheet No. L102
Design - JC Drawn - JC D [16-02-21] COUNCL RAY — FOR APPROVAL a 4 Structural Engineers evn CONE Bg. EA MSPEPNGRPEN- 193 Landscape Buffer Plan COMPLEX 11 LEO ALLEY ROAD Digital Ref : L101 Landscape Pon Issue: D
C [5-11-20 | DESIGN AMENDMENTS — FOR APPROVAL uC -ng(Fons),F ist I~
Scales - 1:200(A1) Date — DEC 2019 | stra-os-aol aesien avENOMENTS — FOR APPROVAL aC COVEY Project Management} 124 puPORTH AVENUE Ph (07) 5443 777 Client - DEVCON CAPITAL 9 PTY NOOSAVILLE This Document is copyright and shall not be copied
ESS POR SP PRO be] ASSOCIATES PTY LTD g planin PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
Document Stage — OPW — ABN 59137 308 992 9 MAROOCHYDORE QLD 4558 LTD for the Development and the Site Specified.
issue Date Description By E-MAIL: [email protected]
c:\12dS\datal\ 12DSERVER\ 192297_2
DWG Covey\Landscape\OPW\LI01 Landscape Plan.divg
Page 6
1 Shrub / groundcover species as per planting plan
2 100 mm composted forest mulch as specified avoiding contact
with tree stem.
3 Min 300mm depth imported topsoil as specified.
4 Planting hole two times wider than plant pot size. Use friable
imported topsoil light compaction only.
5 Slow release fertilizer as per Manufacturer's recommendations
Choose appropriate fertilser for species selection
6 — Sub-grade,
TYPICAL 140mm - 200mm PLANTING
NTS
ADVANCED TREE PLANTING - GARDEN BEDS
SPECIFICATION NOTES
SOIL AND MULCH
EXCAVATION AND DRAINAGE
Break up and remove any debris from construction works to achieve
required planting depths. Excavate to bring the subsoil to a minimum
ORGANIC MULCH
Ensure mulch is produced by chipper, aged, comprised of leaf and limb
material of varying sizes, free of foreign matter including rock,
INORGANIC MULCH
Gravel Mulch Type 1 to be Nom.45mm¢ washed Mary River rounds
installed to a depth of 100mm laid on pinned weed suppressant
3 of 300 mm below finished design levels. Shape the subsoil to fall soil/sediment contamination and is applied to all planting areas as per geotextile matting
to subsoil drains where applicable. Break up the subsoil to a requirements. Rake to an even surface flush with the surrounding
further depth of 150 mm. Sub-surface drainage as per the attached finished levels. Avoid placement against green plant stems and keep
8 details is to be incorporated to all planting areas that are enclosed below tree trunk flares, Mulch to finish level with adjoining edging TURF - SUPPLY AND LAY
by hard edging, are located on controlled compacted fill and or not .
otherwise drained, Install imported or ameliorated topsoil over Mulch to comply with requirements set out in AS4454:2012- Composts, Turf installed to road verge must be “A” grade Couch with minimum
subsoil as per spec. Imported and site soil is to be mixed insitu Soil Conditioners and Mulches sod depth of 25 mm, All turf must be Installed within 24 hours of
1 100mm mulch as specified Ensure all earthworks are contoured to drain effectively. Mulch to be free of damaging material and preferably aged for a dressed with topsoil Turf to be rolled to provide an even surface
2 Imported / ameliorated topsoil Laid to minimum minimum of two (2) months after chipping, before being spread on site free from depressions and bumps. Any depressions / damage within
300mm depth to specification. Fertiliser to be
applied to Manufacturer's recommendations to
top layer of topsoil prior to turf being laid
3 De-compacted subsoil to 150mm depth
4 Ensure all garden bed areas and tree pits are
free draining
TYPICAL GARDEN BED PROFILE
NTS
SOIL TEST
Obtain bulked sample soil test from NATA registered laboratory on
site topsoil to be used on job. Obtain seperate tests for various
soils used in works.
Test for pH, organic matter, Ca / Mg Ratio, Nitrate-N, Ammonium-N,
P, Ca, Mg, K, So, S, Al, Si, B, Fe, Ma, Cu, Z, Mo, Co, Se and
ameliorate to appropriate levels for proposed planting in accordance
with recommendations of suitably qualified agronomist or soil
scientist,
Provide soil amelioration certificate from qualified agronomist
Provide AS4419 compliance certificate for all imported soil
Geotechnical information including bore logs showing depth of fill,
OCP’s & allowable bearing capabilities for footing designs as
required.
TOPSOIL - SUPPLY AND PLACEMENT
Turf areas are to be filled with fit for purpose imported topsoil to
a minimum of 100 mm depth over cultivated sub-grade.
Planting areas are to be filled with fit for purpose imported topsoil
to a minimum of 300mm depth over cultivated sub-grade
. 25 ltr tree pits are to be are to be filled with fit for purpose
imported topsoil to a minimum of 0.5m? volume.
* 100Itr trees are to have no less than 4m? soil volume to
support healthy establishment and growth,
© Supplier of imported soils, as well as intended mix is to be
nominated prior to start of works and approved by
Superintendent.
* Where structural cell systems are to be used refer to
Manufacturer's specifications and details for recommended soil
volumes.
© Add and mix composted material to topsoil when spreading to
help inoculate soil
. A slow release fertiliser such as ‘Osmocote’ or equivalent is to
be incorporated with individual planting in accordance with the
Manufacturer's recommendations.
© — Soil is to be mounded to facilitate good drainage (max 1:3
grade).
* To improve the water holding capacity of the dry and well
drained soils on site, addition of a moisture holding product
such as ‘Hydrocell’ or 'Rainsaver’ is recommended following
manufacturers guidelines.
Finish topsoil flush with abutting kerbs, mowing strips, and paved
surfaces unless otherwise shown. Feather edges into adjoining
undisturbed ground,
Forest blend mulch is the preferred mulch for all areas
Tip mulch is not appropriate for the following reasons
© may not be of uniform size and quality.
o it may contain material from diseased vegetation, which may
spread potentially fatal diseases (e.g. Phellinus/, fungus or
pathogens, (e.g. Phytophtora).
© mulch that is not properly composted may introduce weed seeds.
© can often be hydrophobic, causing drought stress in plants.
© possible growth inhibiting properties due to phytotoxic chemicals
e.g, polyphenols
© poorly composted mulch may cause nitrogen draw down, locking
up nutrients needed for plant growth
© may contain metals and other rubbish which may cause a health
risk to workers.
Mulch to be spread before planting to prevent erosion, loss of soil
moisture and weed seed germination.
Mulch is to be installed as per landscape drawing, to a depth of 100mm
unless otherwise specified
Mulch depth is not to exceed 150mm. Deep mulching - particularly with
mulch containing fines - can restrict air flow causing anaerobic
decomposition to take place. A possible side effect of this is alcohol
production which has the potential to damage plant cell walls and roots.
Anaerobic compost may not have a high enough temperatures to
effectively destroy pathogens.
Rake mulch to an even surface level with surrounding finish
Spread mulch so it is smooth and evenly graded between design surface
levels, sloped towards the base of the plant stems
Mulches are not to be in contact with plant stems. Ensure mulch is no
closer to the stem than:
© 50mm for shrubs
0 100mm for trees.
Form a small bermed dish around plant stems to facilitate flow of water
and nutrients to rootball
Preferably, the area beneath tree canopy (dripline) is to be blanket
mulched
Surrounds of plants planted in riplines (plough lines “ripped” into soil to
decompact and loosen soil) and grass areas, provide mulch to 750mm
diameter with trunk at centre.
SEDIMENT AND EROSION
The Contractor shall ensure that measures are undertaken to minimize
erosion of exposed surfaces during the life of the project. Any localized
overland flow causing scour through the site is to be rectified by the
Contractor with appropriate methods determined in consultation with the
Superintendent. The Contractor shall inspect the site after each
significant rain event for erosion.
MATERIALS - SUPPLY AND INSTALL
turf areas are to be replaced or top dressed with clean river sand
as directed by Superintendent,
CONTAINERISED PLANT MATERIAL
AS2303:18 / NATSPEC.
Tree stock sized 300mm and over is to be compliant with
AS2303:2018- Tree Stock for Landscape Use, and is to be certified
as compliant by an independent level 5 Arborist, Arborist inspection
tags are to be attached fo fhe tree before delivery to site and
remain attached until the stock has been accepted by Council as
Off Maintenance
Superintendent to approve plant material prior to planting
Planting is to be carried out in a manner consistent with good
horticultural practice. Plants are to be planted at correct depth
allowing for ‘settling’. Soil greater than 10mm in depth is not to be
placed over the rootball or against the stem. All 300mm pot and
larger plant material is to be guyed and staked as per advanced
Tree Planting Detail unless otherwise approved by the
Superintendent. Smaller plant stock is to be staked as necessary.
Stakes shall not pass through the rootball of plant at time of
planting or any time thereafter. Nursery stakes are to be removed
within 3 months of planting
Stock may be rejected if plants are
a) undersized proportional to specified container size or if
the root system is underdeveloped
b) oversized proportional to specified container size or
severely root bound
c) unbalanced or uncharacteristic of normal or specified
growth pattern for the species
d) not suitably acclimatised for the specific environment
e) diseased, infested with pests or suffering from other
form of significant stress
f) tree stock is not compliant with AS2303:2018-Tree Stock
for Landscape Use, and is not certified as compliant by
level 5 Arborist
GRAVEL MULCH GS
Install gravel mulch to Nom.depth of 100mm. Suggested m
diameter to be no less than 20mm. Preference is to Roy 0
the use of recycled concrete product installed as Ic’ mulch
where practicable, specifically in areas of nex vistMlity. If
recycled concrete product is selected for angagXof higher visibility,
such as path edges or in planting areasgensdee the recycled
concrete is of the highest grade pos d free from materials
such as steel and plastic. In gen y recycled concrete product
als and rubbish, both
1 AS2303:2018- Tree Stock for Landscape Use compliant tree
stock with Arborist certification - refer to specification
notes. Species and pot size as per schedule. Stem taper
finished flush with finished soil level, allow for settlement.
2 100mm depth organic mulch as specified, avoiding contact with
tree stem.
3 Excavated planting hole 2x width of rootball with sloping
sides, backfilled with topsoil as specified
Soil gently mounded to top of root plate.
4 Rootball
5 Lightly compacted soil under root package to prevent tree
from slumping
is to be free of all oe erere
inorganic and organic. Ensuge evah fall across surface is achieved
to prevent ponding we
PAVER TYPE X
Type: 40098@¢oX%0mm concrete paver
Sugge Snufacturer/Type: ‘Quadro 50’ by Adbri Masonry
Tek 365 565
sted finish/colour: Charcoal
efer to detail for installation details
8 6 50x50x2400mm Hardwood stakes driven into ground avoiding
rootball. Tree ties to be hessian tie.
7 Min. 300mm imported topsoil as specified to garden areas.
8 Cultivated / ripped subgrade.
9 Ensure all garden bed areas and tree pits are free draining
Width of garden as per plans
All timber products to have Forest
Stewardship Council® (FSC®) Check all dimensions before commencement of work.
SCALE 1:10 Chain of Custody certification TT IS THE RESPONSIBILITY OF THE CONTRACTOR Check Site boundary dimensions from the Title plans
TO. CONTACT THE RELEVANT AUTHORITIES 70 Check Building Boundary clearances by set out
CONFIRM THE LOCATION OF ALL EXISTING SERVICES || Notwithstanding the information supplied on this draving,
PRIOR TO THE COMMENCEMENT OF EXCAVATION the locaton, depth and extent of underground or overhead
services are to be confirmed and protected on site by the|
contractor prior fo commencement of works,
roved -
Checked - JO 2 Consulting Civil & “er Drawing title — Project - PROPOSED INDUSTRIAL Site - Project 192297 Sheet No. L200
Design - JC Drawn - JC D [16-00-21] COUNOL RA — FOR APPROVAL i A Structural Engineers | KEVIN COVEY aéng,ceEng.Mevust.usPePNc.rPeo-1823 | Landscape Details & COMPLEX 11 LEO ALLEY ROAD Digital Ref ; 1200 Landscape Detsis Issue: DD.
AS NOTED © [5-11-20 | DESIGN AENOWENTS — FOR APPROVAL [uC CcCOoOVveS CHRIS. CAMP BEng(Hons),MIEAust,RPEQ—4944 vee = - __ -
Scales ~ Date - DEC 2019 fs 75-05-20) DESIGN ANENDWENTS FOR APPROVAL [UC Project Management} 124 puPORTH AVENUE Ph (07) 5443 7777 Specification Client - DEVCON CAPITAL 9 PTY NOOSAVILLE This Document is copyright and shall not be copied
7A I9=12=16| FOR APPROVAL uc] ASSOCIATESPTYLTD 4 pignnin PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
Document Stage - OPW — ABN 59 137 305 992 9 MAROOCHYDORE QLD 4558 LTD for the Development and the Site Specified.
Issue Date Description By E-MAIL: [email protected]
e:\12dS\data\ 12DSERVER\ 19229 7_280\DWG
Covey \Landscape\OPW\L200 Landscape Details.dwg
Page 7
1 ‘A’ grade Couch turf or similar approved. Grass to be
laid along contours with staggered, close butted joints
so that finished turf surface is flush with adjacent
1 surface levels. Desirable maximum slope gradient 1:6
(though 1:4 is acceptable where necessary)
2 2 Imported topsoil laid to minimum 100mm depth to
specification. Fertiliser to be applied to Manufacturer's
recommendations to top layer of topsoil prior to turf 1 Selected garden bed mulch (depth as
being laid specified) to finish flush with timber edge
3 Relieve sub-soil compaction to 75mm & ensure free 2 Dressed 25x100mm Hardwood edge. Smm
draining in preparation for topsoil application chamfer to all edges fixed with ?Smm
2 4 Turf to be rolled to provide an even surface free of galvanised batten screws through pilot hole.
depressions and bumps. 3 Turf as specified
4 Topsoil as specified.
3 NOTE 5 Sub-grade
Following laying of turf irrigate immediately until topsoil is 6 Treated Timber Stake min. 50x300mm
moistened to full depth. Ensure irrigation regime is carried 7 Planting area.
out until grass is fully established,
All timber products to have Forest
Stewardship Council® (FSC®) Chain of
TYPICAL TURF PROFILE EDGE TYPE 1 Custody eertfcation
NTS TIMBER EDGE
NTS
AS2303:2018- Tree Stock for Landscape Use equivalent
tree stock. Species and pot size as per schedule
100 mm composted forest mulch as specified avoiding
contact with tree stem
3 Excavated planting hole 2x width of rootball with
f sloping sides, backfilled with site soil mixed with
imported AS4419 compliant topsoil and TerraCottem to
- | Manufacturer's specification. Soil gently mounded to
top of root plate
a | 4 Subsoil
10 \ 5 Structural topsoil - total volume to be 4m? per tree
Boe I } planting
sR | S 6 Structural modules to provide structural integrity to
above car park hardstand and allow for tree root
growth, aeration and irrigation
7 Root barrier
8 Aeration pipe network
9 100mm depth drainage layer
1
1
Groundcover planting
Car park
Molle 7
NOTE:
Adjacent detail is indicative only - final design
and selected product to be installed as per
Manufacturer's specifications and guidance
CAR PARK SHADE TREE - STRUCTURAL CELL SYSTEM
Orientation:
Angle and space pavers as indicated on working drawing.
If not specified space equally as shown on drawings.
Weed suppressant geotextile la
a
Concrete haunch to all edg
Finished mutc!
Refer to re x
OM. 200
~\
IT_IS THE RESPONSIBILITY OF THE CONTRACTOR
TO CONTACT THE RELEVANT AUTHORITIES TO
ISTING SERVICES
| “PRIOR TO THE COMMENCEMENT
PRIOR TO THE COMMENCEMENT )OF EXCAVATION
Leisure top of
haunch is min. now surface level.
S
een
| mulch
NTS
PAVER TYPE 1
Coarse bedding sand
100mm depth compacted base course
Subgrade
Check all dimensions before commencement of work.
Check Site boundary dimensions from the Title plans
Check Building Boundary clearances by set out.
NTS. Notwithstanding the information supplied on this drawing,
the location, depth and extent of underground or overhead
services are to be confirmed and protected on site by the
contractor prior to commencement of works.
‘Approved 5 i
Checked = 10 a Consulting Civil & Drawing title - Project - PROPOSED INDUSTRIAL Site - Project 192297 Sheet No. L201
Design - JC Drawn - JC Structural Engineers KEVIN covey Bing Png MEL ISEPNGRPE-1823 Landscape Details COMPLEX 11 LEO ALLEY ROAD Digital Ref : 1200 Lonéscape Detcis Issue :
D | 16-02-21] COUNCIL RFI — FOR APPROVAL uC BEng(Hons),MIEAust,RPEQ—4944
Scales - AS NOTED ote - DEC 2019 oR cove: Project Management] +24 puPORTH AVENUE Ph (07) 5443. 7777 Client - DEVCON CAPITAL 9 PTY NOOSAVILLE This Document is copyright and shall not be copied
7A 1S=12=16] FOR APPROVAL uc] ASSOCIATESPTYLTD 4 pignnin PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
Document Stage — OPW ABN 59 137 305 992 anning MAROOCHYDORE QLD 4558 LTD for the Development and the Site Specifies
Issue Date Description By E-MAIL: [email protected]
12dS\data\ 12
SERVER\\192297_280\DWG Covey\Landscape\OPW\L200 Landscape Details.dwg