RFI - Attachment 3 - Updated Landscape OPW Plans

of 7

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 

 

 

 

 

 

INTERNAL PLANTING
Install 2 selection of shrub
and groundcover species to
soften and screen built
form within the
development. 100ltr
advance stock trees are
to be planted utilising
subsurface soil cells to
provide a minimum soil
volume of 4m> per tree

   

LANDSCAPE BUFFER PLANTING
install @ mix of shrub and groundcover
species within the 3m wide easement
areas, Install large tree species outside
of easement areas as per loactions
noted on plans.

Refer to Landscape Plan L102 for
planting extents and plant schedules.

 

UNIT 9

 

 

 

 

 

 

 

 

 

 

 

 

 

    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
 

 

 

planting

 

 

 

 

 

 
 

 

 

 

 
 
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

ENTRANCE PLANTING
Install @ Hered mix of shrub and groundcover species
to screen the front fencing of the development. 100\tr
advance stock trees are to be planted to provide
canopy screening to development frontage
2 s & &

—
SCALE 1:250 (A1)

PROJECT SCOPE

Landscape

Soil Test 1
Imported Top Soil to 100\tr trees (4m* per tree) 28m?
100mm Imported Top Soil to all turf areas (allowance) 9m?
300mm Imported Top Soil to all planting beds 55m?
100mm Imported Top Soil to buffer planting areas 50m?
Verge turf (allowance) 87m?
Temporary turf to biobasin floors 49m?
400mm depth organic mulch all planting areas 19m?
50mm depth straw mulch to Biobasin floors 25m?
Jute mesh to Biobasin floors 49m?
Coir mesh to biobasin batters 28m?
100mm depth mulch to buffer planting areas 50m?

 

 

200mm pots to planting areas (shrub species)
140mm pots to planting areas (groundcover species)

 

75mm tubes to Biobasin floors (macrophyte species) 291
75mm tubes to buffer planting areas 780
Edge Type 1 - as per detail 161m
Landscape and Biobasin Works Establishment and Maintenance Period

Establishment Period 3 months
Maintenance Period: 39 months

It is the Contractors responsibility to ensure that landscaping works are maintained throughout the
maintenance period.
Vandalism or unforseen damage to landscapes may be quoted separately prior to ‘Off-Maintenance’

Other

Provide Arborist AS2303:2018- Tree Stock for Landscape Use certification for all trees
Provide soil amelioration certificate from qualified Agronomist

Provide AS4419 compliance certificate for all imported soil

Exclusions to Landscape Scope
Retaining Walls

Bulk shaping of earthworks & fill
Stormwater inlets/outlets to Bio-basin

SCOPE OF WORKS

Landscape works to include the following

* Site preliminaries
* Top soil soil test and analysis

* Excavation and drainage to planting areas
* Supply and install subsurface soil cells

© Topsoil supply and placement

© Turf supply and lay

* Bio basin - removal of sacrificial turf and install of macrophyte species
as per documentation

*  Containerised plant material - supply and installation
* Organic mulch - supply and installation
* 3 month establishment of landscape works

month establishment of biobasin

month maintenance of landscape works

month establishment and maintenance of bio basin

. Attendance at Council pre-start, On and Off-Maintenance meetings

Contractor shall take full account of documentation of Civil Engineering, Hydraulic and Electrical
Engineering Works.
SITE PRELIMINARIES

Contractor to confirm planting boundaries / extent of works / loading / handling areas etc prior to
commencement. Contractor to attend pre-start meeting with Superintendent and Council.

Subsurface soil cell system is subject to detail design - to be installed strictly under
supervision/guidance from Manufacturer.

Suggested Manufacturer: City Green Tel. 1300 066 949 Web. https://citygreen.com/

 

 

Check oll dimensions before commencement of work.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR Check Site boundary dimensions from the Title plans
TO CONTACT THE RELEVANT AUTHORITIES TO Check Building Boundary clearances by set out.
CONFIRM THE LOCATION OF ALL EXISTING SERVICES Notwithstanding the information supplied on this drawing,
PRIOR TO THE COMMENCEMENT OF EXCAVATION the location, depth and extent of underground or overhead}

 

 

 

 

 

services are to be confirmed and protected on site by the}
contractor prior to commencement of works.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Checked - JO
Design JC Drawn - JC D [16-02-21] COUNCIL RFI — FOR APPROVAL aC
© |5=11-20 [DESIGN ANENDWENTS — FOR APPROVAL [JC
Seales - 1:250(A1) Date - DEC 2019 [rs is-as-2o) sesieN AVENOWENTS — FOR APPROVAL [J6
1 [19-12-19] APPROVAL ISSUE uC

Document Stage — oPW —
Issue Date Description By

 

 

 

 

 

 

 

 

 

 

 

‘Approved 7 .
a& Consulting Civil & Drawing title — Project - PROPOSED INDUSTRIAL Site - Project 192297 Sheet No. L001
« Structural Engineers | KEVIN COVEY Béng,cPEng MEAustMSPEPNG,RPEO-18231 Extent of Works COMPLEX 11 LEO ALLEY ROAD Digital Ref : Wot Eten ot Wors Issue: D
CcCOoOVves CHRIS CAMP BEng(Hons),MIEAust,RPEQ—4944
Project Management] 124 puPORTH AVENUE Ph (07) 5443 7777 Client - DEVCON CAPITAL 9 PTY NOOSAVILLE This Document is copyright and shall not be copied
ASSOCIATES PTYLTD 3 pignnin PO BOX 16 Fax (07) 5443 7577 without written approval, nor shall it be used except
ABN 59 137 305 992 9 WAROOCHYDORE QLD 4558 LTD for the Development and the Site Specifie
: [email protected]

 

c:\12dS\data\ 12DSERVER\192297_280\DWG Covey\Landscape\OPW\LOO1 Extent of Works.dwg
Log in to download the original file

RFI - Attachment 3 - Updated Landscape OPW Plans.pdf · 1.7 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.