Original source · versioned page text
Reference Document - MCU24 0155 (As Published)
DCM BUILDING DESIGN 18 SHEARWATER STREET, PEREGIAN BEACH – STORMWATER MANAGEMENT PLAN 4 COUNCIL REQUIREMENTS FO R ALLOTMENT DRAINAGE In accordance with the Noosa Plan 2020 and QUDM Section 7.13, the site is subject to a Level 0 drainage design standard. Under this standard, roof runoff may be directed to ground level towards a drainage swale, as proposed for this site. Table 9.4.6.3 of the Noosa Plan 2020 outlines performance outcome PO2, which requires maximising on-site water efficiency through collection and reuse for non-potable purposes such as irrigation. To meet acceptable outcomes AO2.1 and AO2.2, a 3000-litre rainwater tank is required for accommodation uses. For non-accommodation uses, an appropriately sized rainwater storage system must be provided to satisfy PO2. Page 13 of 17
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Reference Document - MCU24 0155 (As Published).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.