Original source · versioned page text
Reference Document - MCU24 0155 (As Published).pdf
DCM BUILDING DESIGN 18 SHEARWATER STREET, PEREGIAN BEACH – STORMWATER MANAGEMENT PLAN 2.2 Legal Po int of Discharge (LPOD) The legal point of discharge for the site is in the land buffer to the east discharging to the existing stormwater open drain as indicated below in figure 3 from Noosa Councils mapping service. Figure 3: Legal Point of Discharge 2.3 Flooding an d Storm Surcharge From Noosa Councils mapping service reflected in Figure 3 below, the subject site is not affected by any flooding or storm tide inundation. Potential for increased storm surge levels due to climate change effects has not been included in councils mapping although due to the higher elevations in the sand dunes between the site and the beach, the site may be protected. Figure 4: Flood Inundation and Storm Tide map Page 8 of 17
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Reference Document - MCU24 0155 (As Published).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.