Skip to the record
Search everything, all in one place.

Original source · versioned page text

Reference Document - MCU24 0155 (As Published).pdf

of 17
DCM BUILDING DESIGN

18 SHEARWATER STREET, PEREGIAN BEACH – STORMWATER MANAGEMENT PLAN
2.2       Legal Po int of Discharge (LPOD)
The legal point of discharge for the site is in the land buffer to the east discharging to the existing
stormwater open drain as indicated below in figure 3 from Noosa Councils mapping service.




Figure 3: Legal Point of Discharge


2.3       Flooding an d Storm Surcharge
From Noosa Councils mapping service reflected in Figure 3 below, the subject site is not affected by
any flooding or storm tide inundation. Potential for increased storm surge levels due to climate
change effects has not been included in councils mapping although due to the higher elevations in the
sand dunes between the site and the beach, the site may be protected.




Figure 4: Flood Inundation and Storm Tide map



                                                                                                   Page 8 of 17

Log in to download the original (Reference Document - MCU24 0155 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.