Skip to the record
Accept no substitutions.

Council archive · source document

Decision Notice OPW25 0206 (AS Published) · OPW25/0206

of 38

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                      a.      Ensure works are carried out in accordance with the approved Fauna Management
                              Report (prepared by Biodiverse Environmental); and the Nature Conservation Act
                              1992.
                      b.      Undertake pre-clearance fauna and habitat assessment on each day of vegetation
                              disturbance, to identify and fauna and habitat present
                      c.      Ensure clearing works avoid nesting times of native fauna.
                      d.      Co-ordinate staging and sequence of clearing with fauna protection.
                      e.      Protect and recover fauna during clearing operations (not previously removed).
                      f.      Manage the translocation of native animals and recovery procedures in accordance
                              with the approved fauna management plan and relevant legislation.
                      g.      Undertake protection works for mulching of any stockpiled vegetation.
                      *(Refer to Advisory Note)
                      Removal of Existing Trees and Vegetation
               11.    Removal of existing trees and vegetation must be undertaken by a qualified person* and
                      must include:
                      a.      Rectification to the finished surface levels and materials.
                      b.      No damage to other vegetation for retention.
                      c.      Legal disposal of all removed vegetation and debris.
               12.    Vegetation removal, felling and lopping must:
                      a.      Retain old growth tree hollows and suitably relocate and distribute for nesting fauna.
                      b.      Have mulch for re-use in landscape or rehabilitation stockpiled and aged for a minimum
                              of three months.
                      c.      Have mulch stockpiles no larger than 1000m3, 2.5m in height and with 10m separation
                              between piles.
                      d.      Conclude with the area being stabilised against erosion, landscaped, rehabilitated and
                              revegetated.
                      *(Refer to Advisory Note)
                      Plant Pest Management
               13.    A qualified person* must manage plant pest (weeds) to:
                      a.      Ensure plants listed as Class 1 and 2 declared pests within Council’s Pest
                              Management Plan are controlled and prevented from spreading.
                      b.      Oversee management techniques that minimise regrowth, prevent damage to non-
                              target species, retain conservation values and maintains site stability.
                      *(Refer to Advisory Note)




                                                                                                        Page 4 of 38
Document Set ID: 24866398
Version: 5, Version Date: 16/06/2026

Used in these records

About this file

File size
4.0 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice OPW25 0206 (AS Published).pdf · 4.0 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.