Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2017-08-08 Services & Organisation Committee Agenda

of 146

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (13.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

BRANCH ACTIVITIES                        RECENT ACHIEVEMENTS                           CURRENT PRIORITIES                            THE NEXT QUARTER
                                                                                          Ongoing wild dog and fox control            Contractor undertaking wild dog
                                                                                            trapping to alleviate the impacts             control trapping in Federal, Cooroy
                                                                                            associated with livestock and wildlife        and Cooran in May and June.
                                                                                            attacks.
Cemeteries
Conduct burials at 3 cemeteries and         New Granite wall installed at               Maintain  ongoing   burial and              The road boundary fence at the
maintain cemeteries in good condition         Tewantin Cemetery for ashes.                  maintenance program                           Pomona Cemetery is in poor
and finalise Cemeteries Business            Cemetery maintenance program                Commence use of the new granite               condition.    Budget     bid     for
Continuity Plan.                              ongoing.                                      wall.                                         replacement           unsuccessful.
                                                                                                                                          Replacement proposed for 2018/19
                                                                                                                                          budget.
Transfer all cemetery paper records to      Work not commenced due to lack of           Schedule the electronic scanning of         Schedule the scanning of the old
T1                                            resources, however in the interim             old burial forms as stage 1 in the            records with funds allocated in the
                                              the records are being stored in a fire        development of an electronic burial           2017/18 budget.
                                              proof cabinet, pending transfer to            records system.
                                              electronic system.




                                                                                                                                                           Page 116 of 146
Log in to download the original file

2017-08-08 Services & Organisation Committee Agenda(PDF, 12MB).pdf · 13.1 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.