4.   ASSESSMENT MANAGER CONDITIONS

PLANNING
     When conditions must be Complied With
1.   Unless otherwise stated, all works required by the conditions of this Decision Notice must be
     completed prior to submission of the subdivision plan to Council for compliance assessment
     Approved Plans
2.   Development authorised by this approval must be undertaken generally in accordance with
     the Approved Plans listed in the following table unless otherwise amended by these
     conditions.

       Plan No.             Rev.   Plan/Document Name                             Date

       102995-151           A      Proposed Subdivision over Lot 101 on 16 Sept 2020
                                   SP279285

3.   All lot numbering on the subdivision plan to be submitted to Council for compliance
     assessment must remain as shown on the Approved Plans.
     Boundary Encroachments
4.   Certification must be submitted to Council from a Licensed Surveyor which certifies that:
     (a) the boundary clearances for any existing buildings remaining on the site comply with
            the relevant provisions of the planning scheme and the Building Act 1975, unless varied
            by this Decision Notice
     (b) all constructed access and roadworks (including associated fill batters and retaining
            walls) are fully contained within a dedicated reserve or registered easement
     (c) all existing and proposed utility services and connections (eg. electricity,
            telecommunications, water, sewerage) are wholly located within the lot they serve, or
            alternatively included within an easement where location within the lot is not possible
     (d) deleted
     (e) all dams (including ponded water, dam walls and associated spillway structures) are
            wholly located within the boundaries of a single lot
     (f)    all retaining walls and structures are fully contained within the lot they retain
     (g) any fill, including fill batters, are wholly contained within the subject site and not on
            adjacent properties
     (h) deleted.
     Landscaping
5.   Native street trees shall be established at 10 metre centres within the footpath reserve along
     the frontage of Lot 103 and shall have a minimum pot size of 45 litres.
     Vegetation Clearing
6.   Vegetation clearing is not authorised by this approval and shall only be undertaken in
     association with an appropriate development approval.
ENGINEERING
     External Works
7.   Gateway Drive must be upgraded for the length of its frontage to the subject site. The works
     must be undertaken in accordance with an Operational Works approval and must include in
     particular the construction of a pedestrian footpath in accordance with the conditions of this
     Decision Notice. This condition is imposed pursuant to s665 of the Sustainable Planning Act
     2009 being non-trunk infrastructure.




                                                                                      Page 2 of 8
Log in to download the original file

Attachment F - Previous Extension to Currency Period 3-11-20.pdf · 297 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.