Attachment F - Previous Extension to Currency Period 3-11-20

of 8

Page text shows just the words. Original shows the document exactly as it was published.

            (ii)   maintenance of safe pedestrian access for the areas affected by the works during
                   and after daily construction has ceased
            (iii) proposed fencing to the site during the construction phase of the development
            (iv) approval of the Traffic Management Control Plan by the Department of Transport
                   and Main Roads (DTMR) for any works on State controlled roads
            (v) provision for worker car parking
      (b)   maintenance and protection of water quality and existing drainage lines through the
            construction site, through the implementation of appropriate erosion and sediment
            control measures
      (c)   works programme identifying key components of the works and their respective
            durations
      (d)   establishment of a communication protocol with the general public, adjoining owners,
            emergency services and local businesses to advise of agreed construction times,
            impacts on traffic, services and other relevant issues
      (e)   identification of complaint management procedures including:
            (i)    contact details for the on-site manager
            (ii) dispute resolution procedures
      (f)   it is acknowledged that the preliminary Construction Management Plan will be a draft
            document requiring finalisation upon appointment of the Principal Contractor employed
            to construct the works and a final document will be required to be submitted at the Pre-
            Start Meeting for the project.
      Unitywater
4.    Connection to the Unitywater live water supply and live sewerage system must be
      undertaken by Unitywater at the applicant’s cost.
      Infrastructure Charges
5.    This Development Permit may trigger an “Adopted Infrastructure Charge Notice” (if
      applicable) to be issued in accordance with Council’s “Adopted Infrastructure Charges
      Resolution” under the State Planning Regulatory Provision (Adopted Charges) and the
      Sustainable Planning Act 2009
7.    PROPERTY NOTES

Not Applicable
8.    VARIATION APPROVAL DETAILS

Not Applicable
9.    FURTHER DEVELOPMENT PERMITS REQUIRED

•     Development Permit for Operational Work (Access, Frontage Works, Services, Stormwater,
      Earthworks)
10.   SUBMISSIONS

Not Applicable
11.   RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Council agrees or agrees in part with the representations, a negotiated decision notice will be
issued. Only one negotiated decision notice may be given.



                                                                                       Page 6 of 8
Log in to download the original file

Attachment F - Previous Extension to Currency Period 3-11-20.pdf · 297 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.