Attachment F - Previous Extension to Currency Period 3-11-20

of 8

Page text shows just the words. Original shows the document exactly as it was published.

22.   Water meters must be located on alternative boundaries to electrical pillars.
23.   Reticulated sewerage must be provided to each lot in the development. This must include:
      (a)   Ensuring existing sewer house drains are wholly contained within the Lot they will
            serve.
      (b)   Provision of sewerage infrastructure to the property boundaries of Lot 103.
24.   Written approval to enter and construct must be obtained from the owners of properties
      through which external sewers will traverse, and be submitted with lodgment of the
      associated development application for Operational Works.
25.   Easements of between 3 and 10 metres must be provided over all Unitywater sewers located
      within property boundaries in accordance with the SEQ standards. Easements shall be
      centred over the pipe. Easement terms shall be the most current registered dealing held by
      the Department of Natural Resources & Mines and shall not be altered or amended.
26.   Written approval to enter and construct must be obtained from the owners of properties
      through which external watermains will traverse. This must include approval for an easement
      over the mains, and be submitted with lodgment of the associated development application
      for Operational Works.
27.   A minimum clearance of 1.5 metres must be maintained between Unitywater sewers and
      proposed building envelopes, buildings and other structures.
28.   Stormwater retention systems and gross pollutant traps must maintain a minimum clearance
      of 1.5 meters from Unitywater water supply and sewerage infrastructure
29.   Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from Unitywater
      water mains and 1.5 metres from Unitywater sewerage mains. Landscaping plants within
      these clearances must be low growing when mature and suitable Unitywater approved
      varieties.
30.   Construction works undertaken in the vicinity of Unitywater water supply or sewerage
      infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
      with repair, replacement or alteration of infrastructure must be met by the applicant.
5.    REFERRAL AGENCIES

Not Applicable
6.    ADVISORY NOTES

The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
      Building and Construction Industry (Portable Long Service Leave) Levy
1.    The QLeave levy must be paid prior to the issue of a development permit where it is required.
      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
      been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.
      Co-ordination of Operational Works Assessment
2.    Additional application fees apply to Operational Work applications where the different
      aspects of the works are lodged separately. Significant savings in application fees will result
      if all works are lodged in a single application.
      Preparation of a Preliminary Construction Management Plan
3.    A preliminary Construction Management Plan must be submitted with the Operational Works
      application and must address the following:
      (a)   traffic management during all aspects of the construction phase including:
            (i)    a Traffic Management Control Plan in accordance with the Manual of Uniform
                   Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                   control measures prior to construction


                                                                                          Page 5 of 8
Log in to download the original file

Attachment F - Previous Extension to Currency Period 3-11-20.pdf · 297 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.