GeoConsulting, Report #15988, July 11 Page 4
Lot 34 Marcus Dues Court, Marcus Beach
3.2.4 Crossfall
The general crossfall is approximately 1:10 [V:H) with a relative fall of 2.5 metres over the defined building
area. The direction of fall is to the northeast or road frontage. Contours are waning adjacent the road
frontage. The allotment frontage is represented by a 0.9/1.4 metre high rendered cobble retaining wall.
3.2.5 Drainage
Drainage over the allotment is very good and to the northeast. The estate has an established drainage
network.
3.2.6 Soil Investigation
To investigate sub-soil details, three boreholes (90mm diameter) were advanced, using a small vehicle
mounted rotary drilling rig. To augment the boreholes and establish soil strengths, six dynamic cone
penetrometer (DCP) tests were advanced. Detailed borelog information is presented in APPENDIX A, with
test locations shown on PLATE 1.
All boreholes encountered a homogeneous soil profile that consisted of fine dune sands.
3.2.7 Groundwater
Groundwater was not encountered in any of the boreholes. Boreholes were extended to 4.5 metres depth.
3.2.8 Wind Category
In accordance with AS 4055, the wind category has been assessed as N3 (TC2.5, Ti, PS).
3.2.9 Engineering Parameters
The calculated bearing capacity with respect to depth at each of the test locations are presented in the
tables below.
Table 1 Bearing Capacities at DCP1
Bearing
Depth
N C" t ' Ni Capacity
(m)
(k Pa)
1.0 3 17.0 1.60 25° 4.8 40
1.5 4 25.5 1.46 33° 5.8 70
2.0 6 34.0 1.36 36° 8.2 90
2.5 10 42.5 1.29 41 ° 12.9 150
t 3.0 14 51.0 1.23 44° 17.2 200
Office at. 1/8 Derma St, Maroochydore, Q, 4558.
Phone: 5443 6622, Fax: 5479 1899, Email: admin®geoconsulting.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 Planning report Geotechnical report and plans MCU11/0168 & OPW11/0257Related documentApplication case desk ↗
Development Application Part 2 of 2 Planning report Geotechnical report and plans MCU11/0168 & OPW11/0257Related documentApplication case desk ↗
About this file
- File size
- 12.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.