Council archive · source document
Development Application Part 2 of 2 Planning report Geotechnical report and plans MCU11/0168 & OPW11/0257
Plans and drawings: the text below has words only, no drawings.
Very large file (12.5 MB): may take a few minutes to open.
GeoConsulting, Report 015988, July 11 Page 5
Lot 34 Marcus Dues Court, Marcus Beach
Table 2 Bearing Capacities at DCP2
Bearing
Depth
N ts ' Cn 0 Ni Capacity
(m)
(kPa)
1.0 2 17.0 1.60 25° 3.2 30
1.5 3 25.5 1.46 25° 4.4 35
2.0 6 34.0 1.36 36° 8.2 100
2.5 9 42.5 1.29 40° 11.6 130
3.0 15 51.0 1.23 46° 18.5 225
Table 3 Bearing Capacities at DCP4
Bearing
Depth
N Q'„ Cn 0' Ni Capacity
(m)
(kPa)
1.0 1 17.0 1.60 25° 1.6 20
1.5 3 25.5 1.46 25° 4.4 35
2.0 6 34.0 1.36 36° 8.2 100
2.5 8 42.5 1.29 43° 10.3 120
3.0 15 51.0 1.23 46° 18.5 225
Notes:
♦ N = Standard Penetration Resistance
♦ a', = Shear stress of the soil (Note: y = 17 kN/m3)
♦ Cn = Correction factor
♦ (t' = Shear strength parameter
♦ Ni = Corrected Penetration Resistance
♦ Allowable bearing capacity has been calculated using Ni and a typical footing width of 0.5
metres.
4.0 LANDSLIDE CHARACTERISATION
4.1 Definition of Landslide
The term landslide is defined as the movement of rock, debris or earth down a slope. The phenomena
described as landslides are not limited to either "land" or to "sliding" and usage of the work has
implied a much more extensive meaning than its component parts suggest.
4.2 Causes of Landslides
Landslides occur when the inherent strength of the soil or weathered rock is no longer sufficient to
resist the forces of gravity acting on the materials. Compared with mountainous areas in other parts of
C
the world, the ranges in Southeast Queensland are relatively subdued and mature. In such areas, slopes
Office at: 1/8 Denna St, Maroochydore, 0, 4558.
Phone: 5443 6622, Fax: 5479 1899, Email: admin(geoconsulting.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 Planning report Geotechnical report and plans MCU11/0168 & OPW11/0257Related documentApplication case desk ↗
Development Application Part 2 of 2 Planning report Geotechnical report and plans MCU11/0168 & OPW11/0257Related documentApplication case desk ↗
About this file
- File size
- 12.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.